Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.5 CrAccepted-AOC A 15 1ST FLOOR PRIYADARSHINI VIHAR DELHI 110092 | SHAHDARA | DELHI | 110092 | ₹47.5 Cr | L1 | Accepted-AOC L1 bidder and Rate justified |
| 2 | L2₹47.8 Cr+₹36.0 L (0.76%)Rejected-Finance | ₹47.8 Cr+₹36.0 L (0.76%) | L2 | Rejected-Finance High rate quoted |
| 3 | L3₹51.8 Cr+₹4.4 Cr (9.17%)Rejected-Finance 102 RAVINDRA NAGAR OLD PALASIA INDORE M P | INDORE | MADHYA PRADESH | 452001 | ₹51.8 Cr+₹4.4 Cr (9.17%) | L3 | Rejected-Finance High rate quoted |
| 4 | L4₹52.6 Cr+₹5.1 Cr (10.7%)Rejected-Finance | ₹52.6 Cr+₹5.1 Cr (10.7%) | L4 | Rejected-Finance High rate quoted |
| 5 | L5₹63.7 Cr+₹16.2 Cr (34.2%)Rejected-Finance | ₹63.7 Cr+₹16.2 Cr (34.2%) | L5 | Rejected-Finance High rate quoted |
Tender Value
₹69.2 Cr
EMD Value
₹69.2 L
Closing Date
3 Oct 2025, 3:00 pmClosed
ch
CE (P) Shivalik BRO laltappar Dehradun
PBMC work bet Km 1.957 to 123.080 on Rishikesh Dharasu road
2025_BRO_714090_1
Chardham/Shivalik/05/2025-26
Open Tender
Civil Works
Percentage
1825 days
PBMC work bet Km 1.957 to 123.080 on Rishikesh Dha
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
Yes
Pay Account Office 034415 PAO NH New Delhi
₹69.2 L
Yes
HQ CE (P) Shivalik BRO laltappar Dehradun
25 Mar 2026
11 Sept 2025
4 Oct 2025
11 Sept 2025
3 Oct 2025
18 Sept 2025
11 Sept 2025 - 13 Sept 2025
13 Sept 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PERFORMANCE BASED MAINTENANCE CONTRACTS (PBMC) ESTIMATE OF INITIAL RECTIFICATION WORKS, ROUTINE MAINTENANCE WORKS AND PERIODIC MAINTENANCE WORKS BETWEEN KM 1.957 TO KM 65.000 (DESIGN LENGTH 56.618 KM), KM 133.020 TO KM 137.330 (DESIGN LENGTH 4.316 KM – CHINYALISAUR BYPASS) ON RISHIKESH – DHARASU ROAD AND KM 110.860 TO KM 123.080 (DESIGN LENGTH 12.058 KM) ON GANGOTRI-DHARASU ROAD ON NH-34 IN UTTARAKHAND STATE (TOTAL LENGTH = 73.192 KM) FOR 5 YEAR MAINTENANCE PERIOD. | 73.19 | Km | 69,20,69,428 | ₹50,65,39,45,574.18 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_817743.xls
BOQ • 0.27 MB
rfpretender.pdf
Tender Documents • 1.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .