Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 55 A HANUMAN BLDG 3RD FLOOR 308 PERIN NARIMAN STREET FORT MUMBAI MAHARASHTRA 400001 UDYAM MH 19 0022488 27AFCPS6977F1ZX R M MSME STATUS AS VERIFIED | MUMBAI | MAHARASHTRA | 400001 | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
16 Oct 2021, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASD
NAVAL DOCKYARD VISAKHAPATNAM
CMS 15 SDN 15 REMOVAL OF REQUEST E SYSTEM AND INSTALLATION OF CMS 15 AND SDN 15 SYSTEM ONBOARD IN SHIP
2021_NAVY_476285_1
COM/OFF/WEA/20-21/949
Open Tender
Marine Services
Turn-key
500 days
NAVAL DOCKYARD VISAKHAPATNAM
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
Exempted
NAVAL DOCKYARD VISAKHAPATNAM
17 Jan 2022
18 Sept 2021
18 Oct 2021
18 Sept 2021
16 Oct 2021
1 Oct 2021
18 Sept 2021 - 16 Oct 2021
27 Sept 2021
180 days
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Request- E (OPS Room)-Degutting and removal of existing Dev 171-A Qty-03(Dimension 1230*12130*1575mm) Request- E Equipment Room- Degutting and removal of existing Converter ATT-20-400(Dimension 700*1220*590mm) (includes removal from onboard location to jetty or upper deck of ship as specified by ship)
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Services – Request- E Control Post- Degutting and removal of existing Dev-198(Dimension 665*433*868mm) Dev-119(B) Qty-03(Dimension 665*434*868mm), Dev-119¿ (Dimension 665*434*1103mm), Request- E (OPS Room)-Degutting and removal of existing Dev-26A-1(Dimension 1270*331*588mm), Dev-26-1(Dimension 994*331*585mm), Dev T-75(Dimension 665*433*868mm) (includes removal from onboard location to jetty or upper deck of ship as specified by ship)
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Services – Request- E (OPS Room)- Degutting and removal of existing Dev-125 Qty-03 (Dimension 738*260*360mm) Dev26(B)-1 (Dimension 695*287*585mm), Dev 193-1 (Dimension 626*393*360mm ), Dev T-9 (Dimension 402*235*429mm ) Request- E Control Post- Degutting and removal of existing Dev-175-2 (Dimension 520*235*796mm ),DB T-(P)(Dimension 235*354*92mm, weight-),DB T-(Y) (Dimension 520*235*796mm ),DB T-(Y)-5 (Dimension 564*235*986mm.)RIU Unit (Dimension 500*300mm) Request- E Equipment Room-Degutting and removal of existing Voltage Contro Unit PH-43P(Dimension 307*257*130mm )Switching Unit Y(B)P-13P (Dimension 428*488*224mm),Rectifier(Dimension 550*366*292mm) , Filter(Dimension 449*390*276mm )Magnetic Starter(Dimension 300*182*394mm),Transformer (Dimension 175*190*182mm), Resistance Box (Dimension 530*390*200mm ),Starter (P)T-3232(Dimension 485*535*204mm),T(Y)-10 (Dimension 573*235*720mm ), T-(Y)-8 Qty-02 (Dimension 589*235*986mm.) (includes removal from onboard location to jetty or upper deck of ship as specified by ship)
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Services – Request- E (OPS Room)- Degutting and removal of existing Dev T-98 Qty-03 (Dimension 800*1070*1700mm), Request- E Control Post- Degutting and removal of existing Dev T-162A (Dimension 665*433*868mm ),Dev T-155 (Dimension 665*529*1103mm),Dev-181A(Dimension 665*439*1103mm ) (includes removal from onboard location to jetty or upper deck of ship as specified by ship)
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Degutting of existing cable
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Removal of in way electrical equipment like starter, junction boxescontrol panel and light fittings etc.
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Removal of in way equipment like ducting, air pipe tool rack, fire box, pre-wetting system etc.
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service - Fitments of 20 standard nodes and 08 DMFC's of CMS and SDN at various locations onboard.
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -Shifting of 20 CMS 16A sub units (weight 15-25 Kgs each) from shop floor to ship.
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -7 in nos DMFC's to be installed in OPS Room
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service - Installation of following in OPS Room -PDS/ Chart Server, Network Health Monitoring system, Switching unit for remote display(SURD), Vertical Remote Display.
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service - 03 in nos. concentrators, 02-interphones/intercoms, 05 JB's to be relocated in the OPS room
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service - All ICM module (Qty-08) stands are required to be installed in a separate stand besides DMFC.
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service - A communication rack required to be fabricated to house one OC of Link II and one ITU besides DMFC. Material to be catered by vendor.
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -A 72" display need to be installed in OPS room. A customized bracket with foldable hinges and securing arrangement to be fabricated.
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -One DMFC to be installed in Bridge. ( Refer to BPs for Dimensions and weight)
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -A customized rack for link II needs to be fabricated and installed next to DMFC in bridge. Material to be catered by vendor.
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service - Laying of cable in channel tray for CMS
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -Trunking to be fabricated (200mm*300mm & 5 Mtrs length) and bulkhead piercing is required for the same. Material for trunking to be catered by vendor
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -Laying of new pipe for connection of fireman system (approx 30mtrs) with Marine AC. Pipe and end connections to be catered by vendor.
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -One DMFC to be installed in Flag Bridge.
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -A customized rack for link II needs to be fabricated and installed next to DMFC in Flag Bridge bridge. Material required for fabrication to be catered by vendor
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -Trunking to be fabricated (200mm*300mm & 5 Mtrs length) and bulkhead piercing is required for the same. Material required for Trunking to be catered by vendor.
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -Installation of two in nos. Computer Complex, two in nos. ESI's, one in nos. RDDU and Switching unit for CCTV camera.
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -Installation of Power on Control Module (POCM), Remote power on module(RPOM), Colour printer and plotter.
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -Installation of UPS Battery and Isolation Transformer.
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -Laying of cable in channel trays for SDN
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -02 EES ,03 LIU's, Gateway Switch-B, Battery Rack, UPS-3KVA installation.
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -Relocation of power panel JB, fabrication of supporting platform in order to locate LIU's EES and Gateway switches.
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -Installation of MPIO, CTP, UPS-3KVA, Battery Rack,LIU Type-B.
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -Relocation of two junction boxes with associated cabling and fabrication of supporting platform for fitment on bulkhead.
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -Installation of Core Switch-B, Distribution Switch-B, Server Rack,3- Battery Rack, 10-LIU Type-B.
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -Installation of Core Switch, Distribution Switch, Server Rack, MPIO, CTP, 9-LIU Type-B & 3- EES.
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -Installation of 4-UPS-3KVA 4-Battery Rack.
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -Installation of MPIO –I, CTP, UPS-3KVA, 2-Battery Rack, 2-LIU Type-B, Gateway Switch, EHFS #1, UPS-1KVA, Step down transformer for 1KVA UPS, PDP.
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -Installation of 04-Gateway Switch,06-UPS-1KVA , 06-Step down transformer,06-Battery rack, 10- LIU Type-B.
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -Installation of 2- EES, 1-LIU Type-B, UPS-1KVA , Step down transformer & UPS-3KVA ( Refer to BPs for Dimensions and weight)
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Services -Installation of Gateway Switch,EES, 3-LIU Type-B, 2-UPS-1KVA , 2-Step down transformer( Refer to BPs for Dimensions and weight)
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -HE starter panel in RX room to be relocated as per the specified position to accommodate step down transformer.
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -Installation of EES, LIU Type-B, UPS-1KVA , Step down transformer , Battery Rack.
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -Relocation of 15 KVA transformer, Main Broadcast Speaker, Signal intercom including fabrication of mounting, shock mounts
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -SDN units to be shited in as per the shipping route.
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -Laying of cable in channel trays
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -Laying and manufacture of 300 mtrs channel tray
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -Laying provisioning and fitment of cable conduit 60 sq mm
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -Fitment of new MCT gland coming with penetrations of bulk heads
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -Manufacture and fitment of cable Tallies 6x3x0.5 mm - Aluminum (Punched)
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -Termination of old/ unused cables by terminating the shield circumferentially and grounding the core at both ends. Proper bonding and grounding of all units ar per NECSTD 1101
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -Manufacture and fitment of clamps for mounting of the channel trays and bulkhead mounted devices, as required
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -Resiting/ blanking of the existing ventilation trunking feeding the cabinets at all locations along with removal and refitment of the AC trucking for shipping in and installation of cabinets.
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -Resiting of the existing light fixtures and manufacturing of additional cable trays in all compartments during installation and associated regutting and hot work
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Service -Provisioning of all tools, equipment slings , vehicles or any other item required for undertaking the above mentioned work
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Removal of microtech tiling
Removal of Request E abd Installation of CMS 15 & SDN 15 system.Removal of lagging for fabrication job
POSITIVE CONTROLS
SAGAR SHIP REPAIRERS AND MARINE SERVICES
SRI LALITHA BHAVANI ASSOCIATES
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .