Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance BARKOT UTTARKASHI | RUDRA PRAYAG | UTTARAKHAND | 246141 | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 Cr+₹2.2 L (1.99%)Admitted-Finance 128 37 S BLOCK YASHODA NAGAR KANPUR U P | FATEHPUR | UTTAR PRADESH | 208001 | ₹1.1 Cr+₹2.2 L (1.99%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical HARIDHAN COLONY VEERBHADRA HARIDWAR ROAD GUMANIWALA RISHIKESH | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | DHRUV ENTERPRISES L2 | Aarna Electrical And Co L1 |
|---|---|---|---|---|---|
| 1.00SUPPLY OF MATERIAL PORTION | |||||
| 2.00 | STAY CLAMP FOR SP-23 WITH NUT & BOLT | 10 | NOS | 2,650 ₹2,650 | 2,550 ₹2,550 Lowest |
| 3.00 | EARTH WIRE CLAMP FOR SP-23 WITH N/B | 14 | NOS | 3,780 ₹3,780 | 3,570 ₹3,570 Lowest |
| 4.00 | PP & CLAMP FOR SP-23 WITHOUT NUT & BOLT | 16 | NOS | 2,640 ₹2,640 | 2,480 ₹2,480 Lowest |
| 5.00 | BRACING CLAMP TOP FOR SP-23 WITH N/B | 4 | NOS | 1,060 ₹1,060 | 1,040 ₹1,040 Lowest |
| 6.00 | BRACING CLAMP BOTTOM FOR SP-23 WITH N/B | 4 | NOS | 1,060 ₹1,060 | 1,040 ₹1,040 Lowest |
| 7.00 | 11 KV CABLE TIES FOR PIN INSULATOR | 327 | NOS | 6,93,240 ₹6,93,240 | 6,86,700 ₹6,86,700 Lowest |
| 8.00 | 11 KV IPC FOR COVERED TO COVERED COND. | 66 | NOS | 1,00,320 ₹1,00,320 | 99,000 ₹99,000 Lowest |
| 9.00 | 11 KV IPC FOR COVERED TO BARE CONDUCTOR | 118 | NOS | 1,97,060 ₹1,97,060 | 1,95,880 ₹1,95,880 Lowest |
| 10.00 | 11 KV MID SPAN JOINTING KIT | 54 | NOS | 1,36,350 ₹1,36,350 | 1,35,000 ₹1,35,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹2.2 L
Closing Date
3 Jul 2026, 12:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER, EDC KARANPRAYAG
Replacement of 11 KV Bare conductor by AAAC Conductor at Bypass Fata to Sonprayag Feeder on Semi Turnkey Basis
2026_UPCL4_96797_1
13/EDC(K)/2026-27
Open Tender
Repair and Maintenance Works
Item Rate
90 days
RUDRAPRAYAG
AS PER NIT
3 documents required · 3 mandatory
₹11,800
EE EDD GOPESHWAR
₹2.2 L
31 Aug 2026
18 Jun 2026
4 Jul 2026
19 Jun 2026
3 Jul 2026
19 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SUPPLY OF MATERIAL PORTION | - | - | - | - |
| 2 | STAY CLAMP FOR SP-23 WITH NUT & BOLT | 10 | NOS | - | - |
| 3 | EARTH WIRE CLAMP FOR SP-23 WITH N/B | 14 | NOS | - | - |
| 4 | PP & CLAMP FOR SP-23 WITHOUT NUT & BOLT | 16 | NOS | - | - |
| 5 | BRACING CLAMP TOP FOR SP-23 WITH N/B | 4 | NOS | - | - |
| 6 | BRACING CLAMP BOTTOM FOR SP-23 WITH N/B | 4 | NOS | - | - |
| 7 | 11 KV CABLE TIES FOR PIN INSULATOR | 327 | NOS | - | - |
| 8 | 11 KV IPC FOR COVERED TO COVERED COND. | 66 | NOS | - | - |
| 9 | 11 KV IPC FOR COVERED TO BARE CONDUCTOR | 118 | NOS | - | - |
| 10 | 11 KV MID SPAN JOINTING KIT | 54 | NOS | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
Tendedocument.pdf
Tender Documents • 1.04 MB
BOQ_114347.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .