Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.7 LAdmitted-Finance | ₹17.7 L | L1 | Admitted-Finance |
| 2 | L2₹21.3 LAdmitted-Finance | ₹21.3 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GUPTA & CO L1 | RELIANCE ENGINEERING AND SERVICE L2 |
|---|---|---|---|---|---|
| 1.00 | Setting up of experimental set up for synthesizing of deuterated compounds and Charging of various raw materials/partially deuterated products into experimental set up. | 300 | No. | 512 ₹1.5 L | 400 ₹1.2 L |
| 2.00 | Removal of off grade Heavy Water and partly Deuterated Compounds, cleaning of experimental set up; measuring the weight of both the portions and their labelling. | 300 | No. | 512 ₹1.5 L | 400 ₹1.2 L |
| 3.00 | Charging of raw materials and products to RB Flask in Normal distillation set ups and/or spin band distillation unit for its purification . Removal of purified raw materials/product from RB Flask in Normal distillation set ups and/or spin band distillation unit to keep in respective bottle and measuring the weight with proper labelling. | 460 | No. | 350 ₹1.6 L | 500 ₹2.3 L |
| 4.00 | Cleaning of glasswares like rb flask, condenser,receiver flask splash heads for synthesis experiments; Cleaning and drying of bottles for packing and storage of D-labeled compounds. Cleaning of fume hood and setting up the distillation setup in the fumehood for various experiments. | 460 | No. | 350 ₹1.6 L | 500 ₹2.3 L |
| 5.00 | Cleaning, drying and cooling of SS vessel for exothermic reactions; Preparing ice bath/chilled water bath for these reactions; Removal of products from SS vessel to the desired storage place and proper labelling. | 160 | No. | 350 ₹56,000 | 500 ₹80,000 |
| 6.00 | Bringing Process fluids samples from TBP, Sodium and MEE plants; Bringing samples of Process water like Cooling water,Boiler and DMW, liquid effluent in PC & AL for analysis | 3,000 | No. | 72 ₹2.2 L | 104 ₹3.1 L |
| 7.00 | Bringing samples of raw materials from TBP, Sodium and K-metal plant. Bringing samples of final product from TBP, Sodium and K-metal plant. | 300 | No. | 80 ₹24,000 | 500 ₹1.5 L |
| 8.00 | Shifting of high volume sampler from 26 unit to the sampling point for ambient air analysis and bringing back the high volume sampler to 26 unit laboratory. | 15 | No. | 2,600 ₹39,000 | 401 ₹6,015 |
| 9.00 | Placing the stack monitoring sampler at K-plant and making connections with the ampule. After sampling over, disconnecting the ampule from the sampler device and bringing back the stack monitoring sampler device to PC &AL and cleaning of the ampoules before and after analysis. | 15 | No. | 2,600 ₹39,000 | 401 ₹6,015 |
| 10.00 | Sampling of Ground water,K-plant slag,used oil and bringing to PC & AL for analysis. | 25 | No. | 800 ₹20,000 | 401 ₹10,025 |
Tender Value
₹18.5 L
EMD Value
₹37,000
Closing Date
18 Feb 2026, 6:00 pmClosed
OSD
Heavy Water Board Facilities Vadodara
Annual contract for piecemeal jobs on day to day basis in General shift and Round the clock shift in Process Control and Analytical Laboratory Heavy Water Board Facilities Vadodara
2026_HWB_896520_1
HWBFV/S/ PCAL/2025-26/27
Open Tender
Miscellaneous Works
365 days
Heavy Water Board Facilities Vadodara
As per NIT
2 documents required · 2 mandatory
₹0
₹37,000
Heavy Water Board Facilities Vadodara
26 Feb 2026
3 Feb 2026
23 Feb 2026
3 Feb 2026
18 Feb 2026
3 Feb 2026
3 Feb 2026 - 17 Feb 2026
17 Feb 2026
Setting up of experimental set up for synthesizing of deuterated compounds and Charging of various raw materials/partially deuterated products into experimental set up.
Removal of off grade Heavy Water and partly Deuterated Compounds, cleaning of experimental set up; measuring the weight of both the portions and their labelling.
Charging of raw materials and products to RB Flask in Normal distillation set ups and/or spin band distillation unit for its purification . Removal of purified raw materials/product from RB Flask in Normal distillation set ups and/or spin band distillation unit to keep in respective bottle and measuring the weight with proper labelling.
Cleaning of glasswares like rb flask, condenser,receiver flask splash heads for synthesis experiments; Cleaning and drying of bottles for packing and storage of D-labeled compounds. Cleaning of fume hood and setting up the distillation setup in the fumehood for various experiments.
Cleaning, drying and cooling of SS vessel for exothermic reactions; Preparing ice bath/chilled water bath for these reactions; Removal of products from SS vessel to the desired storage place and proper labelling.
Bringing Process fluids samples from TBP, Sodium and MEE plants; Bringing samples of Process water like Cooling water,Boiler and DMW, liquid effluent in PC & AL for analysis
Bringing samples of raw materials from TBP, Sodium and K-metal plant. Bringing samples of final product from TBP, Sodium and K-metal plant.
Shifting of high volume sampler from 26 unit to the sampling point for ambient air analysis and bringing back the high volume sampler to 26 unit laboratory.
Placing the stack monitoring sampler at K-plant and making connections with the ampule. After sampling over, disconnecting the ampule from the sampler device and bringing back the stack monitoring sampler device to PC &AL and cleaning of the ampoules before and after analysis.
Sampling of Ground water,K-plant slag,used oil and bringing to PC & AL for analysis.
Bringing of gas cylinders (N2, H2, Ar, C2H2, N2O, He, O2 ) from store and its connection with headers, Sending back empty cylinders to stores after disconnection from gas line.
Bringing Liquid nitrogen cylinder Dewar from security gate to PC &AL through stroes; Transfer of liquid nitrogen from dewar flask/tank to NMR and Sending back empty liquid nitrogen dewar from PC&AL to stores /security gate.
Shifting of rotary vacuum pump/Charging of oils and removal of degraded oil in vacuum pump, shifting of chiller,charging of dmw in chillers and its washing.
Rearrangement of Instrument spares in cupboards and under bench modules and drawer,Cleaning and rearrangements of items in 26 and 18 unit lab, Cleaning of lab store items and rearrangement of lab chemicals and glasswares
Cleaning of laboratory working platforms,glass windows,dusting of instruments; Dilution and mixing of lab effluent pit, Disposal of raw material samples after analysis,Shifting of off grade balloons from PCAL to 26 unit storage
Supply items Rubber Gloves
Sample Basket 160x160x160 mm
SS Tongue
Trolly for Cylinder (500 Kg load)
SS jack 300x300 mm
Chloroform bellow 1 lit vol.
Rubraflex Tube 8 mm ID
Glass Bottle Stopper 24/29
Liquid Soap
Thermometer , 0-50,0-100, 0-300
Amber Bottle 2.5 lit
LPG green tube
Latex tube
Liquid Nitrogen Charging Assembly
Heavy Duty Vacuum Bottle Tarson 1 L
Heavy Duty Vacuum Bottle Tarson 2 L
Heavy Duty Vacuum Bottle Tarson 4 L
Nerrow mouth Tarson bottle HDPE 250 mL
Nerrow mouth Tarson bottle HDPE 1000 Ml
Acetone Commercial
Gloves Knitted PVC
PVC Beaker 250 ml
PVC Beaker 1000 ml
PVC Beaker 2000 ml
PVC tub 3 Lit
PVC Bucket 20 lit
Bubbler Silicon 50 ml
D shape snap hook carabiner
Galvanize Chain 1 mtr
Plier medium size
Spanner adjustable
LN key set
Spanner set
Aspiration Needle
Teflon tape 1 inch width
SS spetula
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.48 MB
TENDERDOCUMENTS.rar
Tender Documents • 19.31 MB
BOQ_942346.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid