Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 CrAccepted-AOC 4TH FLOOR VOLTAS HOUSE A BLOCK DR BABASAHEB AMBEDKAR ROAD CHINCHPOKLI MUMBAI MAHARASHTRA 400033 | MUMBAI | MAHARASHTRA | 400033 | ₹3.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹4.0 Cr+₹8.3 L (2.12%)Rejected-AOC 11TH FLOOR ECO CENTRE BUSINESS TOWER P NO 4 EM BLOCK SECTOR V KOLKATA 91 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | ₹4.0 Cr+₹8.3 L (2.12%) | L2 | Rejected-AOC L2 |
Tender Value
₹4.7 Cr
EMD Value
₹1 L
Closing Date
9 Nov 2021, 12:00 pmClosed
Chief Executive Officer, Technopark
Chief Executive Officer, Park Center Building, Technopark, Kazhakuttam, Trivandrum, Kerala
OPERATION AND COMPREHENSIVE ANNUAL MAINTENANCE CONTRACT OF HVAC SYSTEMS IN TECHNOPARK PHASE-I CAMPUS, TRIVANDRUM.
2021_ETPK_447106_1
ETPK/PH-I/2021-22/AT-133
Open Tender
AMC/ Maintenance Contracts
Item Rate
1095 days
Kazhakuttam, Trivandrum
Refer Pre Qualification details in the Tender Documents
7 documents required · 7 mandatory
₹8,850
₹1 L
5 Jan 2022
22 Oct 2021
10 Nov 2021
22 Oct 2021
9 Nov 2021
26 Oct 2021
Amount
OPERATIONS OF HVAC SYSTEMS IN PHASE I CAMPUS FOR THREE YEARS (01/12/2021 TO 30/11/2024) AS PER THE TERMS AND CONDITIONS MENTIONED IN THE TENDER DOCUMENT ETPK/PH-I/2021-22/AT-133
Operation contract of HVAC Systems Installed in Technopark Phase I Campus For the period 01/12/2021 to 30/11/2024 (3 Years) as per the terms and conditions mentioned in the tender document ETPK/PH-I/2021-22/AT-133
COMPREHENSIVE ANNUAL MAINTENANCE OF THEJASWINI HVAC PLANT FOR THREE YEARS (01/12/2021 TO 30/11/2024) AS PER THE TERMS AND CONDITIONS MENTIONED IN THE TENDER DOCUMENT ETPK/PH-I/2021-22/AT-133
350TR single compressor screw chiller– Make: YORK (Johnson Controls) Model no: YRWAWAT 3550C (Chiller 1)
350TR single compressor screw chiller– Make: YORK (Johnson Controls) Model no: YRWAWAT 3550C (Chiller 2)
350TR single compressor screw chiller– Make: YORK (Johnson Controls) Model no: YRWAWAT 3550C (Chiller 3)
350TR single compressor screw chiller– Make: YORK (Johnson Controls) Model no: YRWAWAT 3550C (Chiller 4)
350TR single compressor screw chiller– Make: YORK (Johnson Controls) Model no: YRWAWAT 3550C (Chiller 5)
355TR single compressor screw chiller- Make: TRANE Model no: RTHDD3F2F3 (Chiller 6)
Primary Pump 1 (11KW,1456rpm) (Bell & Gosset)
Primary Pump 2 (11KW,1456rpm) (Bell & Gosset)
Primary Pump 3 (11KW,1456rpm) (Bell & Gosset)
Primary Pump 4 (11KW,1456rpm) (Bell & Gosset)
Primary Pump 5 (11KW,1456rpm) (Bell & Gosset) )
Primary Pump 6 (11KW,1456rpm) (Bell & Gosset)
Secondary pump 1 [15 KW, 1457 rpm] (Bell & Gosset)
Secondary pump 2 [15 KW, 1457 rpm] (Bell & Gosset)
Secondary pump 3 [15 KW, 1457 rpm] (Bell & Gosset)
Secondary pump 4 [15 KW, 1457 rpm] (Bell & Gosset)
Secondary pump 5 [15 KW, 1457 rpm] (Bell & Gosset)
Secondary pump 6 [15 KW, 1457 rpm] (Bell & Gosset)
350 TR Counter Flow Cooling Tower (Advance Make) (Cooling Tower 1)
350 TR Counter Flow Cooling Tower (Advance Make) (Cooling Tower 2)
350 TR Counter Flow Cooling Tower (Advance Make) (Cooling Tower 3)
350 TR Counter Flow Cooling Tower (Advance Make) (Cooling Tower 4)
350 TR Counter Flow Cooling Tower (Advance Make) (Cooling Tower 5)
350 TR Counter Flow Cooling Tower (Advance Make) (Cooling Tower 6)
Condenser Pump 1 [30KW, 1472rpm] (Bell & Gosset)
Condenser Pump 2 [30KW, 1472rpm] (Bell & Gosset)
Condenser Pump 3 [30KW, 1472rpm] (Bell & Gosset)
Condenser Pump 4 [30KW, 1472rpm] (Bell & Gosset)
Condenser Pump 5 [30KW, 1472rpm] (Bell & Gosset)
Condenser Pump 6 [30KW, 1472rpm] (Bell & Gosset)
Electrical panels for the above equipment (Including VFD panel).
COMPREHENSIVE ANNUAL MAINTENANCE OF BHAVANI HVAC PLANT FOR THREE YEARS (01/12/2021 TO 30/11/2024) AS PER THE TERMS AND CONDITIONS MENTIONED IN THE TENDER DOCUMENT ETPK/PH-I/2021-22/AT-133
350TR Three compressor screw chiller– Make: Dunham-Bush Model no: VWCFX39V1T1C (Chiller 1)
350TR Three compressor screw chiller– Make: Dunham-Bush Model no: VWCFX39V1T1C (Chiller 2)
350TR Three compressor screw chiller– Make: Dunham-Bush Model no: VWCFX39V1T1C (Chiller 3)
350TR single compressor screw chiller– Make: TRANE Model no: RTHDD3F2F3 (Chiller 4)
Primary Pump 1 (15KW), Make: Kirloskar
Primary Pump 2 (15KW), Make: Kirloskar
Primary Pump 3 (15KW), Make: Kirloskar
Primary Pump 4 (15KW), Make: Kirloskar
Secondary pump 1 [22KW], Make: Kirloskar
Secondary pump 2[22KW], Make: Kirloskar
Secondary pump 3 [22KW], Make: Kirloskar
Secondary pump 4 [22KW], Make: Kirloskar
Condenser Pump 1 [30KW], Make: Kirloskar
Condenser Pump 2 [30KW], Make: Kirloskar
Condenser Pump 3 [30KW], Make: Kirloskar
Condenser Pump 4 [30KW], Make: Kirloskar
350 TR Counter Flow Cooling Tower, Make: Advance (Cooling Tower 1)
350 TR Counter Flow Cooling Tower, Make: Advance (Cooling Tower 2)
350 TR Counter Flow Cooling Tower, Make: Advance (Cooling Tower 3)
350 TR Counter Flow Cooling Tower, Make: Advance (Cooling Tower 4)
Air Handling Units ,Make: Boopathy, Capacity: 7.5TR ( 1 Nos)
Air Handling Units, Make: Boopathy, Capacity: 22TR ( 17 Nos)
Air Handling Units, Make: Boopathy, Capacity: 20TR ( 14 Nos)
Air Handling Units, Make: Boopathy, Capacity: 18 TR ( 30 Nos)
Air Handling Units, Make: Boopathy, Capacity: 15TR ( 2 Nos)
Air Handling Units, Make: Boopathy, Capacity: 13TR ( 18 Nos)
Air Handling Units, Make: Boopathy, Capacity: 12TR ( 2 Nos)
COMPREHENSIVE ANNUAL MAINTENANCE OF PARK CENTRE HVAC PLANT FOR THREE YEARS (01/12/2021 TO 30/11/2024) AS PER THE TERMS AND CONDITIONS MENTIONED IN THE TENDER DOCUMENT ETPK/PH-I/2021-22/AT-133
60TR reciprocating chiller- Make: Voltas (Chiller 1) Model no: 05086
40TR reciprocating chiller- Make: Voltas (Chiller 2) Model no: 05040
40TR reciprocating chiller- Make: Voltas (Chiller 3) Model no: 05040
150TR single compressor screw chillers– Make: Dunham Bush Model no: WCFX20SRVAUEAR5BR (Chiller 4)
Chilled water pump 1 (20HP)- Make: Xylem
Chilled water pump 2 (20HP)- Make: Xylem
Counter Flow Cooling Tower Capacity: 150TR Make: Advance (Cooling Tower 1)
Counter Flow Cooling Tower Capacity: 150TR Make: Advance (Cooling Tower 2)
Condenser Pump 1 [15HP] Make: Xylem
Condenser Pump 2 [15HP] Make: Xylem
FCU Make: Voltas, Capacity: 2TR (38 Nos)
Air Handling Unit, Make : Voltas, Capacity: 15TR
Air Handling Unit, Make : Voltas, Capacity: 5TR (2 Nos)
Air Handling Unit, Make : Voltas, Capacity: 30TR
COMPREHENSIVE ANNUAL MAINTENANCE OF VRF SYSTEMS IN PHASE I CAMPUS FOR THREE YEARS (01/12/2021 TO 30/11/2024) AS PER THE TERMS AND CONDITIONS MENTIONED IN THE TENDER DOCUMENT ETPK/PH-I/2021-22/AT-133
CAMC of VRF systems in Park Centre Building Phase I Campus as per the terms and conditions mentioned in the tender document ETPK/PH-I/2021-22/AT-133 TOTAL CAPACITY : 42 HP , MAKE : LG
CAMC of VRF systems in Gayathri Building Phase I Campus as per the terms and conditions mentioned in the tender document ETPK/PH-I/2021-22/AT-133 TOTAL CAPACITY : 132 HP, MAKE : DAIKIN
CAMC of VRF systems in ground floor Periyar Building Phase I Campus as per the terms and conditions mentioned in the tender document ETPK/PH-I/2021-22/AT-133 TOTAL CAPACITY : 16 HP, MAKE : LG
CAMC of VRF systems in first floor Periyar Building as per the terms and conditions mentioned in the tender document ETPK/PH-I/2021-22/AT-133 TOTAL CAPACITY : 34 HP, MAKE : LG
COMPREHENSIVE ANNUAL MAINTENANCE OF DX UNITS IN PHASE I CAMPUS FOR THREE YEARS (01/12/2021 TO 30/11/2024) AS PER THE TERMS AND CONDITIONS MENTIONED IN THE TENDER DOCUMENT ETPK/PH-I/2021-22/AT-133
CAMC of DX units in Park Centre, Guest House, Club House in Phase I Campus as per the terms and conditions mentioned in the tender document ETPK/PH-I/2021-22/AT-133, Refer tender document for list of equipments.
COMPREHENSIVE ANNUAL MAINTENANCE OF AHU's IN THEJASWINI BUILDING PHASE I CAMPUS FOR THREE YEARS (01/12/2021 TO 30/11/2024) AS PER THE TERMS AND CONDITIONS MENTIONED IN THE TENDER DOCUMENT ETPK/PH-I/2021-22/AT-133
CAMC of AHU units in Thejaswini Building Phase I Campus as per the terms and conditions mentioned in the tender document ETPK/PH-I/2021-22/AT-133, Refer tender document for list of equipments.
Blue Star Limited
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .