Loading…
Loading…
Tender Value
₹65.9 L
EMD Value
₹66,000
Closing Date
7 Sept 2026, 6:00 pmClosed
Executive Engineer, R&B Division, Bhuj
(1) Repairing of Approach Slab to Existing Box Culvert on Rapar Fatehgadh Adesar Road km 0/00 to 50/00(Ch.3/100, 5/800,6/900) (2) Repairing and Renovation of Existing Box Culvert at Ch. 0/900 on Palasva Bhimasar Hamirpar Fatehgadh Road km 0/00 to 32/00 Ta.Rapar, Dist. Kutch
339414
40 For 2026-27
Open
Repair and Maintenance
Works
Kutch
12 documents required · 12 mandatory
₹2,400
Executive Engineer, R and B Division, Bhuj
₹66,000
27 Aug 2026
27 Aug 2026
27 Aug 2026
7 Sept 2026
27 Aug 2026
Name of work :-
(1) Repairing of Approach Slab to Existing Box Culvert on Rapar Fatehgadh
Adesar Road km 0/00 to 50/00(Ch.3/100, 5/800,6/900) (2) Repairing and
Renovation of Existing Box Culvert at Ch. 0/900 on Palasva Bhimasar
Hamirpar Fatehgadh Road km 0/00 to 32/00 Ta.Rapar, Dist. Kutch
Bill of Quantity
Memorandum showing items of works to be carried out.
It. Qty. Item of work Estimated Rates Unit Total amount according
It. Qty. Item of work Estimated Rates Unit Total amount according
No. Estimated In Figures In Words
to estimated Quantities
1 123.00 Demolition including stacking of 1082.35 Rupees One Cmt
serviceable materilas and disposal Thousand
of unserviceable materials with all Eighty Two And
lead and lift. (i) R.C.C. work Paise Thirty
2 432.00 Construction of Grannular sub 1903.24 Rupees One Cmt
base of 150 mm thick in by Thousand Nine
providing GSB Gr - I coarse graded Hundred Three
material using B.T Metal 26.5mm And Paise
to 53 mm @ 35 % ,26.5mm to Twenty Four
4.75mm 45% & Below 2.36mm 20 Only
% in uniform layer with motor
grader on prepared surface mxing
by mix in place method with
vibratory roller to achive the
desired density complete as per
3 54.00 Providing and casting in situ 3737.13 Rupees Three Cmt
Ordinary cement concrete M-150 Thousand
for R.C.C. Raft and cut-off walls Seven Hundred
including necessary shuttering Thirty Seven
laying, vibrating, ramming and And Paise
curing complete. Thirteen Only
4 108.00 Providing and casting in situ 5197.33 Rupees Five Cmt
controlled cement concrete Thousand One
concrete M-250 for approach slab Hundred
including formwork curing and Ninety Seven
finishing complete. And Paise
5 10.58 Providing and laying in position FE 73858.69 Rupees MT
500D TMT bar reinforcement Seventy Three
including cutting, bending, hooking Thousand
and tying complete as per detailed Eight Hundred
drawings for the following.(A) Piers Fifty Eight And
(B) Abutments (C) R.C.C. Returns Paise Sixty
It. Qty. Item of work Estimated Rates Unit Total amount according
It. Qty. Item of work Estimated Rates Unit Total amount according
No. Estimated to estimated Quantities
but may be In Figures In Words
6 16.50 Providing and casting in situ 5265.96 Rupees Five Cmt
controlled cement concrete M-250 Thousand Two
for R.C.C. return as per drawings Hundred Sixty
including centering shuttering, Five And Paise
scaffolding where necessary, laying Ninety Six Only
vibrating, curing and finishing
complete.(A) Height from 0.0 to
M. (1) Piers (2) Abutment (3) RCC
7 900.00 Removal of defective 594.79 Rupees Five Sqm
concrete,cleaning the surface Hundred
thoroughly, applying the shotcrete Ninety Four
mixture mechanically with And Paise
compressedairunder Seventy Nine
pressure,comprising of cement, Only
sand, coarse aggregates, water and
quick setting compound in the
proportion as perclause 2807.1.,
sand and coarse aggregates
conforming to IS:383 and table 1ofI
S:9012 respectively ,water cement
ratio ranging from 0.35 to 0.50,
density of gunite not less than
2000kg/cum,strength not less than
25 Mp aand workmanship
conforming to clause 2807.6.
8 900.00 Epoxy bonding agent of new 529.24 Rupees Five Sqm
concrete to old concrete.The Hundred
applied bond agent should possess Twenty Nine
min propertiesas And Paise
below:ShearStrength-@7days Twenty Four
20N/mm2 Flexural Strength- Only
@7days 35N/mm2 Compressive
Strength-@7days 50N/mm2(The
new repair mortar/concrete should
be applied within overlay time of
epoxy bonding agent mentioned as
per manufacturer's data sheets)
9 900.00 Guniting concrete surface with 775.68 Rupees Seven Sqm
cement mortar applied with Hundred
compresso rafter cleaning surface Seventy Five
and spraying with epoxy complete And Paise Sixty
as per Technical Eight Only
specification.(Reference to
MORT&H's specification 2807)
It. Qty. Item of work Estimated Rates Unit Total amount according
It. Qty. Item of work Estimated Rates Unit Total amount according
No. Estimated to estimated Quantities
but may be In Figures In Words
10 120.00 Providing and inserting nipples 502.98 Rupees Five Nos
with approved fixing compound Hundred Two
after drilling holes for grouting as And Paise
per Technical specifications Ninety Eight
including subsequentcutting Only
/removal and sealing of the hole as
necessary of nipples after
completion of grouting with
11 240.00 Sealing of cracks/porous concrete 794.87 Rupees Seven Kg
by injection process through Hundred
nipples/Grouting complete as per Ninety Four
Technical specification. And Paise
12 540.00 Rust Removal & Steel Protection:- 838.30 Rupees Eight Sqm
Cleaning as directed & specified all Hundred Thirty
corrosion /rust /scales from Eight And
reinforcement bars using rust Paise Thirty
remover Reebaklens RR of Fosroc Only
make or Rust clean of BASF or
equivalent of leaving to dry for
mins & washing surface with fresh
water as required to exposed
reinforcement bars complete as
specified also providing & applying
inhibition coats/system to exposed
reinforcement bar safterdrying&
also new bar safter cleaning &
removing scales and rust
completely as specified.Two
component inhibitors Concresive
ZRI equivalent material of BASF
make as approved by engineer shall
be used as per manufacturers
specification in two coats including
all labour toolstackles, necessary
surface preparation & necessary
protection after & during repair
13 300.00 Scaffolding: Providing, erecting and 208.06 Rupees Two Sqm
dismantling safe H frame and /pipe Hundred Eight
scaffoldingi ncluding working And Paise Six
platform for external area of bridge Only
pier to facilitate all works etc.
completed, Measurement for
payment shall be considered as per
detailed specification .(Property of
contractor,and repetitions will be
paid per pier) (for Every 1 m extra
height, increase the rate by
rupees/ meter height)A) up to
It. Qty. Item of work Estimated Rates Unit Total amount according
It. Qty. Item of work Estimated Rates Unit Total amount according
No. Estimated to estimated Quantities
but may be In Figures In Words
14 19800.00 Providing TMT Bar FE 500D 77.29 Rupees Kg
reinforcement for R.C.C. work Seventy Seven
including bending, binding and And Paise
placing in position complete upto Twenty Nine
floor two level Only
Rupees Sixty Five Lakh(s) Ninety Three Thousand Two Hundred Fifty And Paise Seventy Two
*Estimated amount *Estimated amount
Put to tender Rs……………………… Put to tender Rs………………………
Deduct : ………% below Add : ………% above
Net Rs……………………… Net Rs………………………
In words ……………………………… In words ………………………………
*(please strike out whichever is not applicable)
Note-1 All works shall be carried out as per Public Works Department Handbook and other specifications of
Division or as directed.
Note-3 Rates quoted include clearance of site (prior commencement of work and its close) in all respects and
hold good for work under all conditions, site, moisture, weather etc.
Note-5 Testing Charges for the quality of material shall be recovered as per SBD
Note-8 pnMU VG[ BF6 lJEFU4 ;lRJF,I4 UF\WLGUZGF 9ZFJ S|DF\So V[DPV[DPVFZPv !!Z___vZ_!#vK4 TFP!q)qZ__$ YL
ZFHI ;ZSFZGF AF\WSFD DF8[ J5ZFTF UF{6vBlGHGL ZMI<8L ;FNL DF8L VG[ ;MO8 DMZD 5Z ZMI<8L ,FU] 50X[P
Note-9 Labour Cess shall be recovered as per SBD
Note-10 Quantity of items may reduce or increase as per work execution.
Note-11 p5ZMST SFD SM.56 SFZ6;Z D\H]Z q GFD\H]Z SZJFGL ;œF ;CL SZGFZ VlWSFZLGL VAFlWT ZC[X[P
Note-13 In RCC items where there is change of grade mix or change as per actual mix design the difference of
cement consumption shall be deducted from rate of original item at the rate of star rate mentioned in
tender. However for Increase in quantity of cement no additional payment shall be made.
Note-14 For earthquake resistance provision the work shall be carried out as per the instruction of Engineer in-
Note-16 CM8DL1F %,Fg8 VG[ 5[JZYL YTF 0FDZGF SFDM AFAT[ ;ZSFZzLGF DFP VG[ DP lJEFU4 UF\WLGUZGF 5lZ5+
G\PV[;V[RVFZq!5(&qVF.ALq!*)s&fv;4 TFPZ_q!q_* VG[ 5ZL5+ S|DF\SP5ZRq!_qZ_!5q55q;L4 TFP_$q!!q!5
D]HA VG];ZJFG]\ ZC[X[P
Note-17 U]HZFT ;ZSFZzLGF DFPDPlJEFUGF 5lZ5+ S|DF\So VFZHLV[Gq&_Z__&qs#5fv; YL NFB, YI[, XZTMP
1) 5_DLDLYL JW] 0FDZ SFDGL ;\I]ST HF0F. sALPV[;PHLP4 ALPALPV[DP l;JFIf CMI T[JF Z:TFGF SFDDF\ NZ Z5_DLP NL9
V[S S|M; ;[SXG 5Z 0FDZSFDGL 5CM/F. VG];FZ A[ YL RFZ SMZ ;[d5, .HFZNFZ[ 5MTFGF SMZ S8L\U DXLG J0[ ;\A\lWT
GFIA SFI"5F,S .HG[ZzLGL CFHZLDF\ D[/JL VF5JFGF ZC[X[ VG[ VF ;[d5, ;L, SZL DFgI ,[AMZ[8ZL DFZOT YLSG[;4
0[g;L8L TYF AL8]DLG; Sg8[\8GF 5lZ1F6 SZFJL 5lZ6FD[ D[/JJFGF ZC[X[P ;\TMQFSFZS 5lZ6FDM VFjIF ;]WL 0FDZ SFDGL
R]SJJF5F+ ZSDGF 5@ ZSD JLYC[<0 ZFBJFDF\ VFJX[4 H[ ZSD ;\TMQFSFZS 5lZ6FDM D?IF AFN H K]8L SZFX[P 5Z\T]
;\TMQFSFZS 5lZ6FDM GlC\ D[/JJFGF lS:;FVMDF\ SZFZGL VgI XZTM VG];FZ SFI"JFCL Y. XSX[P
It. Qty. Item of work Estimated Rates Unit Total amount according
It. Qty. Item of work Estimated Rates Unit Total amount according
No. Estimated to estimated Quantities
but may be In Figures In Words
2) ~FP!__ ,FB S[ T[YL JW] ZSDGF SZFZ C[9/GF SFD 5Z .HFZNFZ[ O],8F.D SJM,LOF.0 V[gHLGLIZ lGI]ST SZJFGM ZC[X[ H[
V\U[ SFDGF JS"VM0"Z D?I[ lNGv!5 DF\ SFI"5F,S .HG[ZzLGL HF6 C[9/4 GFIA SFI"5F,S .HG[ZzLG[ lGO]S .HG[ZGF GFD4
SJM,LOLS[XG4 DFS"XL84 ;8L"OLS[84 S,Z OM8MU|FO4 lGI]lSTGF C]SD JU[Z[ lJUT ZH] SZJFGL ZC[X[ TYF SFD 5Z CFHZ YIF
V\U[GM ZL5M8" VF5JFGM ZC[X[4 H[ VG];FZ SZFZ C[9/GF SFD 5Z SJM,LOF.0 .HG[ZGL p5ZMST XZT D]HA lGI]lST YFI
TYF :Y/ 5Z BZ[BZ SFDULZL G ;\EF/[ tIF\ ;]WLGF ;DIUF/F T[DH SFD RF,] ZC[ T[ ;DI NZdIFG lGI]S SZ[, .HG[Z
SFDULZL ;\EF/X[ GlC\ T[ ;DIUF/F DF8[ ~FP!54___qv 5|lTDF; ,[B[ lA,DF\YL S5FT SZJFDF\ VFJX4 H[ GMG ZLO\0[A,
Signature of Contractor Executive Engineer
R&B Division, Bhuj
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Additional Instructions.pdf
BOQ.pdf
Bridge Booklet(1).pdf
Bridge Booklet(2).pdf
Detailed specifications.pdf
GR.pdf
ROAD WORK Booklet - 1.pdf
ROAD WORK Booklet - 2.pdf
SBD Book.pdf
Spe. Index.pdf
Specification.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .