Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹40 L
Closing Date
20 Jan 2026, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Admiral Superintendent
NSRY Kochi
NORMAL REFIT (NR 26) OF BPT SARTHI
2025_NAVY_744996_1
PP/08/3480/SARTHI/NR/25
Single
Marine Services
Item Rate
150 days
NSRY Kochi
The Shipyard must have suitable dry dock facility and sufficient infrastructure for undertaking the refit of BPT Sarthi
4 documents required · 4 mandatory
₹0
₹40 L
Yes
16 Jan 2026
17 Dec 2025
21 Jan 2026
17 Dec 2025
20 Jan 2026
15 Jan 2026
17 Dec 2025 - 20 Dec 2025
SUMMARY OF QUOTATION
Services Total Cost of Dry dock hire charges and other Admin & general services quoted in the BoQ
Cost of repair part :- (a) Total cost of Hull work Package
(b) Total cost odf Engineering Work Package
(c ) Total cost of Electrical work Package
GST on serial 1.01 to 1.04
Total Budgeary Cost of Spares
GST applicable for 1.06
Any other taxes & Duties
Miscellaneous (not included in any of the serial above)
GST if any on serial 1.09
BoQ_Ver3.1
PROVIDE 01 IN NO "REFIT COORDINATOR" [PREFERABLY RETIRED IN SENIOR SAILORS (ERA/EAP)]. ALTERNATELY, PERSONAL WITH MINIMUM B. TECH (MECH/ELECTRICAL/ ELECTRONICS/NAVAL ARCHITECTURE) WITH MINIMUM EXPERIENCE OF 05 YEARS IN SHIP REPAIR FIELD. SALARY TO MATCH WITH SHIPYARD ASSISTANT MANAGER LEVEL. ADDITIONAL DAYS ARE INCLUDED FOR PRE & POST REPAIR/REFIT COORDINATION/ PLANNING ACTIVITIES. REQUIRED TO WORK IN TOUGH ENVIROMENT ONBOARD DURING VARIOUS REPAIRS/TRIALS, ON SHIFT BASIS ROUND THE CLOCK, INCLUDING SUNDAY/HOLIDAY AS PER DEMAND OF THE REPAIR/REFIT.
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevant columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
BOAT DEVIT
PAINTING WITH FULL PAINT SCHEME PAINTING OF ONLY TOP COAT OF FOLLOWING AREAS:- EXTERNAL ABOVE WATER HULL AREA INCLUDING BOTH SIDES OF BULWARK INCLUDING PAINT COST (PAINT TO BE SUPPLIED BY FIRM)
WEATHER DECKS INCLUDING PAINT COST (PAINT TO BE SUPPLIED BY FIRM)
BILGE PLATFORM SUPPORTING BRACKETS AT INDICATED LOCATIONS TO BE RENEWED. MAT - MS
OVERHAULING OF ANCHOR WINDLASS TO BE CARRIED OUT. RENEW COMPONENTS/ PARTS IF FOUND DEFECTIVE INCLUDING OIL CHANGE.
OVERHAULING OF CAPSTAN TO BE CARRIED OUT. RENEW COMPONENTS/ PARTS IF FOUND DEFECTIVE.
SUPERSTRUCTURE OUTSIDE BULKHEAD, BOLLARDS, LADDERS, MAST, INSIDE BULWARK, ALL DECK FITTINGS INCLUDING PAINT COST (PAINT TO BE SUPPLIED BY FIRM)
OVERHAULING OF TOWING HOOK TO BE CARRIED OUT. LOAD TEST TO BE CARRIED OUT POST REPAIR/OVERHAULING AND THE CERTIFICATE FOR THE SAME BE PROVIDED. SWL- 25 T
MAIN MAST, RIGGING MAST, FUNNEL AND DRESSING LINES FITTINGS ARE TO BE EXAMINED THOROGHLY. RENEW ALL EYE PLATES, EYES, SURROUNDINGS STRUCTURE AS NECASSARY. PAINTING TO BE CARRIED OUT AS PER NO 53/16.
OVERHAULING OF WT DOORS INCLUDING RENEWAL OF RUBBER BEADING TO BE UNDERTAKEN. (WT DOORS - 8, RUBBER BEADING APPROX-40 MTRS).SURVEY AND RENEWAL ALSO TO BE CARRIED OUT METAL PARTS.
RENEWAL OF BOLLARDS BE UNDERTAKEN(ON ACTUAL POST SURVEY). BOLLARD PULL TEST TO BE CARRIED OUT POST RENEWAL & THE CERTIFICATES FOR THE SAME BE PROVIDED: (A) SINGLE BOLLARD- 02 (B) DOUBLE BOLLARD- 04 (C) "A" FORM BOLLARD- 01 (D) CRUCIFORM BOLLARD- 01
OVERHAULING OF WT PORT HOLES & WINDOWS INCLUDING RENEWAL OF APPROPRIATE RUBBER BEADING TO BE UNDERTAKEN.
OVERHAULING OF WT HATCHES INCLUDING RENEWAL OF RUBBER BEADING TO BE UNDERTAKEN. (WT HATCHES - 05, RUBBER BEADING APPROX-20 MTRS).SURVEY AND RENEWAL ALSO TO BE CARRIED OUT OF METAL PARTS.
YARD CRAFT NAME BOARDS INCLUDING SECURING FOUNDATION/ BASE OF BOTH SIDES ARE PERISHED. SAME TO BE RENEWED AS PER SAMPLE.(MAT - ACERLIC SHEET AND MS FOUNDATION))
RENEWAL OF FASTENERS AND GASKETS TO BE CARRIED FOR ALL MAINTENANCE HOLES COVERS OF TANKS.
DECK UNDERLAY IS TO BE RENEWED IN CREW BATHROOM AND GALLEY
CLEANING OF INTERNAL SURFACES OF TRUNKINGS TO BE CARRIED OUT. EXTERNAL PAINTING WITH APPROPRIATE PAINT SCHEME AS PER NO 53/16.
OVERHAULING OF MUSHROOM HEADS TO BE CARRIED OUT. RENEW DEFECTIVE PARTS.
04 IN NOS FIRE HOSE BOXES WITH HINGES AND LOCKING ARRANGEMENTS DAMAGED. SAME TO BE RENEWED.
SEVICEABILITY CHECKS, PRESSURE TESTING, RENEWAL OF CARTIDGE AND REFILLING TO BE CARRIED OUT FOR 9 LTR AFFF EXTINGUISHERS. CERTIFICATES TO BE PROVIDED.
SEVICEABILITY CHECKS, PRESSURE TESTING AND REFILLING TO BE CARRIED OUT FOR 2 KG CO2 EXTINGUISHERS.CERTIFICATES TO BE PROVIDED.
SEVICEABILITY CHECKS, PRESSURE TESTING,RENEWAL OF CARTIDGE AND REFILLING TO BE CARRIED OUT FOR 5 KG DCP EXTINGUISHERS.CERTIFICATES TO BE PROVIDED.
SEVICEABILITY CHECKS, PRESSURE TESTING,RENEWAL OF CARTIDGE AND REFILLING TO BE CARRIED OUT FOR 45 LTR TYPE EXTINGUISHER.CERTIFICATES TO BE PROVIDED.
LIFE RAFT- SERVICEABILITY CHECKS OF HRG AND HAMMER H 20. RENEW IF FOUND DEFECTIVE.
LIFE RAFT- WEBBING STRAPS TO BE RENEWED AS PER FOST GUIDELINES.
SHIPS SIDE GUARD RAILS OF LENGTH 10 METERS TO BE RENEWED.(SIZE 1.5 INCH)
MESS DECK LOCKERS FOUND DEFECTIVE, TO BE REPAIRED/ REPLACED.
MS CLEATS ON (P & S) BULWARK DAMAGED, TO BE RENEWED INCLUDING DOUBLER PLATE . SIZE 28 MM
TANK CLEANING OF STP IS TO BE UNDERTAKEN
DECK EYE FOR AWNING ARE TO BE RENEWED
ROOF OF FIXED AWNING AT FOXEL TO BE RENEWED.
DRAIN TO BE PROVISIONED FOR WASH BASIN AT FOXLE
SANITARY LINE TO BE CHEMICAL CLEANED
RUBBER BEADING OF WT FLAPS PROVIDED ON UPPER DECKS FOR VENTILATION TO BE RENEWED. (PAYMENT AS ACTUALS )
SITTING TABLE TO BE RENEWED AT FOXLE. MAT-MS
CHAIN OF FIXED STANCHIONS TO BE POSITIONED. MAT- SS
ROPE REEL FOUNDATION TO BE RENEWED
CORREDED SANITARY LINE TO BE RENEWED
ENGINEERING
AIR SYSTEM
9000K HRLY ROUTINE (FIRST TOP END OVERHAUL) TO BE CARRIED OUT
REPLACEMENT OF BATTERY , 200 AH 12 V
REPLACE ALL BELTS
COOLANT TO BE REPLACED. (QTY-300 LTRS, TYPE- CATERPILLAR ELC )
REPLACE ENGINE OIL AND LUB OIL FILTERS. ( OIL- 15W40, QTY-400 LTRS)
REPLACE FUEL SYSTEM PRIMARY FILTER/WATER SEPARATOR
REPLACE FUEL SYSTEM SECONDARY FILTER
CLEAN THE OIL SUCTION SCREEN AFTER THE OIL HAS BEEN DRAINED
REPLACE HOSES AND CLAMPS. (HOSES-12, CLAMPS-24)
INSPECT THE CYLINDER HEAD ASSEMBLY AS PER INSTRUCTION
INSPECT OF FOLLOWINGS :- (A) CRANKSHAFT VIBRATION DAMPER (B) TURBOCHARGER (C) FUEL PRIMING PUMP (D) PRELUB PUMP,(F) PUSH RODS,(G) ROCKER ARMS SPACER PLATE, (H) CAMESHAFT, (J) ENGINE CONTROL MODULES (K) OIL PIMP (L) FUEL TRANSFER PUMP
REPLACEMENT OF FOLLOWINGS :-(A) ALL INJECTORS -08 NOS(B) ENGINE WIRING HARNESS (C) EXHAUST MANIFOLD SEAT (D) INLET MANIFOLD GASKET (E) INLET MANIFOLD SEALS (F) ENGINE CONTROL MODULES (G) EXHAUST BELLOW SHIELDS.
REPLACEMENT OF ELECTRONIC UNIT OF INJECTORS
ALIGNMENT TO BE CARRIED OUT OF BME DRIVEN EQUIPMENTS
SOFTWARE UPDATION
REPLACEMENT OF VALVE ASSEMBLY( DUPLEX FILTER GROUP)
REPLACEMENT ENGINE VALVE LASH
STBD MAIN ENGINE AIR STARTING MOTOR MALFUNCTIONING, TO BE RENEWED.
CLEAN, LUBRICATE AND INSPECTION OF PORT MAIN ENGINE AIR STARTING MOTOR .
REPLACEMENT OF SPEED SENSOR
SERVICEABILITY CHECKS OF PROTECTIVE DEVICES TO BE CARRIED OUT. HOT AND COLD CHECKS OF FOLLOWING PROTECTIVE DEVICES OF ENGINE TO BE CARRIED OUT. (A) LOW LUB OIL PRESS CUT OUT (B) HIGH LUB OIL TEMP CUTOUT (C) HIGH EXHAUST TEMP CUTOUT (D) OVERSPEED TRIP
BOTH MAIN ENGINE CONTROL PANEL DISPLAY NOT WORKING, TO BE RENEWED.(WHEEL HOUSE)
FULL POWER TRIALS OF BOTH MAIN ENGINES TO BE OFFERED POST COMPLETION OF ROUTINE
VISUAL INSPECTION OF COUPLINGS FOR LOOSE NESS AND WEAR & TEAR.
TEST ALL RELIEF VALVES AND RESET , SIZE 80 MM, REL PRESS. 33 KGF/SQ CM.
TEST THE SYSTEM FOR MAXIMUM WORKING PRESSURE AND CHECK FOR LEAKS. WORK PRESS 30 KGF/SQ CM.
AIR INLET FILTER TO BE CHANGED.
SAFETY CUTOUT MALFUNCTIONING TO BE REPLACED
CALIBRATE THE SAFETY CUTOUTS
DRAIN & AND RENEW OIL IN SUMP(OIL TO BE SUPPLIED BY FIRM).
OVERHAUL AND PRESURE TEST ALL VALVES IN THE SYSTEM.
INTER COOLER TO BE CLEANED AND PRESSURE TESTED.
REPLACEMENT OF BELTS(BELTS TO BE SUPPLIED BY FIRM).
CHECK TIGHTNESS OF FOUNDATION BOLTS & RE- TORQUE, IF NECESSARY.
CHECK AND CALIBRATE SOLENOID VALVE FOR CORRECT FUNCTIONING. CHECK FOR LEAKAGE IN THE AIR LINE.
CLEAN AIR FILTERS OF THE SYSTEM.
OVERHAULING OF AIR WHISTLE.
OVERHAULING AND PRESSURE TESTING OF SYSTEM VALVES. (SIZE- 65MM)
DRAIN LUBRICATING OIL IN SUMP AND REFILL WITH NEW OIL. (QTY- 5 LTRS)(OIL TO BE SUPPLIED BY FIRM)
TAPPET CLEARANCE-MEASURE INLET AND EXHAUST VALVES TAPPET CLEARANCE AND ADJUST IF NECESSARY WHEN ENGINE IS COLD.
EDA TRIALS TO BE OFFERED POST COMPLETION OF ROUTINES. ANY DEFECT OBSERVED DURING TRIALS TO BE RECTIFIED.
OVERHAULING OF SUCTION AND DISCHARGE VALVES
CARRY OUT VISUAL SURVEY OF PUMP FOUNDATION.
RENEW SUCTION AND DISCHARGE COMPENSATORS
RENEW SUCTION AND DISCHARGE GAUGES .
OVERHAULING OF BILDGE PUMP.
OVERHAUL SUCTION AND DISCHARGE VALVES
CARRY OUT VISUAL SURVEY OF PUMP FOUNDATION.
CARRY OUT VISUAL SURVEY OF PUMP FOUNDATION.
RENEW SUCTION AND DISCHARGE GAUGES
OVERHAULING OF FIRE PUMP
CARRY OUT VISUAL SURVEY OF PUMP FOUNDATION.
REFIT SUCTION AND DISCHARGE VALVES
CALIBRATE SUCTION AND DISCHARGE GAUGES. CALIBRATION CERTIFICATE TO BE PROVIDED FOR GAUGES.
OVERHAULING OF FIRE PUMP
OVERHAUL SUCTION AND DISCHARGE VALVES
CARRY OUT VISUAL SURVEY OF PUMP FOUNDATION.
OVERHAULING OF DOMESTIC FRESH WATER PUMP.
REPLACE SUCTION AND DISCHARGE GAUGES. CALIBRATION CERTIFICATE TO BE PROVIDED FOR GAUGES.
CLEAN FUEL RU TANKS AND INSPECT FOR RUST AND CORROSION. POST CLEANING TANK TO BE PRESERVED WITH APPROPRIATE COATING.(QTY- 02 NOS)
OVERHAUL VALVES IN THE SYSTEM; CARRY OUT PRESSURE TESTING UP TO 4 KG/CM2 . (SIZE- 65 MM, QTY- 06 NOS)
AIR SYSTEM PIPES TO BE BLOW THROUGH AND PRESSURE TESTED. (SIZE- 10MM LENGTH- 20 M)
LIBRATE ALL PRESSURE GAUGES IN THE SYSTEM. CALIBRATION CERTIFCATE TO BE PROVIDED.(QTY-10 NOS, RANGE- 0- 50KG/SQ.CM)
MAIN ENGINE CONTROL
FFF SYSTEM
PRESSURE TESTING OF AIR STORAGE BOTTLES AND LEAK TEST OF BOTTLE FILLING AND DISCHARGE VALVES. (TEST PRESSURE-45 BAR)
OVERHAULING AND PRESSURE TESTING OF SYSTEM VALVES (07 NOS OF SIZE 80 MM, 03 IN NOS OF 200 MM, 03 IN NO OF SIZE- 120 MM)
REMOVE PART OF PIPE AND CHECK INTERNAL AND EXTERNAL CONDITION TO ASSES COROSSION DUE TO AGING, CARRY OUT PRESSURE TESTING.
6000 HRLY ROUTINES OF BOTH DIESEL GENERATOR
REPLACE LUB OIL FILTER & FUEL FILTER ( ALL FILTERS TO BE SUPPLIED BY FIRM)
CLEAN ENGINE BREATHER
REPLACEMENT OF AIR CLEANER ELEMENT.
CARRY OUT TAPPET SETTINGS
REMOVE AIR CLEANER & TURBOCHARGER AIR INTAKE CONNECTIONS & CROSS OVER. CHECK TURBOCHARGER FREENESS VISUALLY.
CHECK CRANKSHAFT END PLAY
REMOVE INJECTORS, CLEAN, INSPECT, REPAIR & CALIBRATE.
REMOVE HEAT EXCHANGER. MECHANICAL & CHEMICAL CLEANING TO BE CARRIED OUT.PRESSURE TEST AND PROVE COOLER. (TEST PRESSURE- 5 BAR)
REMOVE TURBOCHARGER. CLEAN, INSPECT & REPAIR WITH NEW REPAIR KIT
TIGHTEN NUT & CAP SCREW OF AIR INLET AND EXHAUST SYSTEM
OVERHAULING OF AUXILIARY WATER PUMP
CHECK VIBRATION DAMPER VISUALLY
REPLACE BELTS FOR ACCESSORIES(BELTS TO BE SUPPLIED BY FIRM)
HOT AND COLD CHECKS OF SAFETY DEVICES FITTED ON ENGINE AND ALTERNATOR TO BE CARRIED OUT.PROVING OF ALL SAFETY DEVICES FITTED IN ENGINE AND ALTERNATOR TO BE OFFERED.
FLUSH LUB OIL AND COOLING SYSTEM WITH RESTORE PLUS, RUN ENGINE TO BRING IT TO OPERATING TEMPERATURE. STOP THE ENGINE REFLUSH COOLING SYSTEM WITH POTABLE WATER 2-3 TIMES. REFILL COOLING SYSTEM WITH COOLANT. RUN THE ENGINE FOR THREE TO FIVE MINUTES(LUB OIL AND COOLANT TO BE SUPPLIED BY FIRM)
POST COMPLETION OF ROUTINES, START THE ENGINE AND CHECK ALL GAUGES, REPLACE IF REQUIRED, CHECK FOR ANY OIL/WATER LEAKAGE, EXHAUST LEAKAGE, STOP THE ENGINE AND RECHECK ENGINE OIL LEVEL, TOP UP IF REQUIRE. AFTER NECESSARY INSPECTION RESTART THE ENGINE. RUN AT IDLE SPEED FOR 15 MINUTES; CARRY OUT LOAD TRIAL ON SHIP AVAILABLE LOAD FOR TWO HOURS. OBSERVE THE ENGINE PERFORMANCE AND RECORD THE ENGINE PARAMETERS
EXHAUST LEAKAGE OBSERVED FROM DG-2, TO BE RECTIFIED
OVERHAULING OF FIRE PUMP
OVERHAULING OF SUCTION AND DISCHARGE VALVES
100 % LOAD TRIALS OF DG 1& 2 TO BE OFFERED POST COMPLETION OF ROUTINES
CARRY OUT VISUAL SURVEY OF PUMP FOUNDATION.
OVERHAULING OF VOITH COOLING PUMP
RENEW SV MOUNTS OF PUMPS
RENEW SUCTION AND DISCHARGE GAUGES.
CARRY OUT RENEWAL OF DEFECTIVE PIPES OF VOITH S/W COOLING WATER SYSTEM. (MAT- CU NI , SIZE- 2'')
OVERHAULING OF PORTABLE SUBMERSIBLE PUMPS TO BE CARRIED OUT. (CAPACITY- 40 TPH)
SEMI RORTARY HAND PUMP FITTED ON UPPER DECK JAMMED. TO BE OVERHAULED
BLOW OUT ALL DISTRIBUTING PIPE LINE WITH COMPRESSED AIR (LP) TO MAKE SURE THAT IT IS NOT BLOCKED.
FIRE ALARM WARNING SYSTEM MALFUNCTIONING/ ERRATIC. DEFECT TO BE RECTIFIED. SERVICEABILITY CHECKS OF ALL FIRE SENSORS
CARRY OUT GENERAL CHECKS INCLUDING PRESSURE TEST AND WEIGHING OF CO2 BOTTLES. ANY DEFECT OBSERVED TO BE RECTIFIED. (CAP-45KG), CERTIFICATES TO BE PROVIDED.
OVERHAUL THE FUEL SEPERATOR AND CARRY OUT FOLLOWING ROUTINES
CHECK HEIGHT POSITION FOR PAIRING DISC.
HORIZONTAL DRIVE- CHECK AXIAL PLAY OF COUPLING AND RENEW BEARINGS OF WORM WHEEL SHAFT.
VERTICAL DRIVE- CLEAN AND CHECK BOWL SPINDLE AND NAVE FOR IMPACT MARKS
VERTICAL DRIVE- CHECK RADIAL WOBBLE OF BOWL SPINDLE
VERTICAL DRIVE- CLEAN AND CHECK BUFFER AND BALL BEARING HOUSING.
VERTICAL DRIVE- RENEW BALL BEARINGS AND TOP BEARING SPRINGS.
CLEAN AND CHECK SPRING AND BRAKE SHOE. RENEWE FRICTION PAD/BRAKE PLUG.
CLEAN AND CHECK FRICTION COUPLING. RENEW FRICTION PADS AND LIPSEAL RING.
DISMANTLE PUMP ASSEMBLY. CLEAN AND CHECK BUSHINGS, WEAR GASKETS, FLEXIBLE COUPLING, RELEF/SAFETY VALVE AND IMPELLER SHAFT. RENEW LIPSEAL RING.
TRIALS TO BE OFFERED POST ROUTINES AND SYSTEM TO BE PROVED
OVERHAULING OF OWS, TO BE CLEANED INTERNALLY. COATING TO BE CHECKED FOR INTACT PHYSICAL CONDITION , IF DEFECTIVE, TO BE REPAIRED TO PREVENT SEVERE CORROSION . TRIALS TO BE OFFERED POST ROUTINES.
CARRY OUT RENEWAL OF DEFECTIVE PIPES OF MAIN ENGINE S/W COOLING WATER SYSTEM . (MAT- CU NI , SIZE- 2''))
FUEL SYSTEM VALVES NOT HOLDING PRESSURE. VALVES TO BE OVERHAULED. (SIZE- 1'' TO 2'', BALL VALVE)
SEA WATER SYSTEM REDUCER FOR MAIN ENGINE AND DG NOT WORKING/MALFUNCTIONING. TO BE OVERAHULED. (SET PRESSURE-3 BAR, TEST PRESSURE- 6 BAR)
OVERHAULING OF FIRE PUMP
SPRINKLERS FITTED IN THE SYSTEM CLOGGED. TO BE REMOVED AND CLEANED. SYSTEM TO BE PROVED POST CLEANING. ANY DEFECT OBSERVED DURING TRIALS TO BE RECTIFIED.
CARRY OUT VISUAL SURVEY OF PUMP FOUNDATION.
OVERHAULING OF FUEL PUMP.
CARRY OUT VISUAL SURVEY OF PUMP FOUNDATION. REPAIR DETORIATED FOUNDATION STIFFENERS AND SUPPORTING RIBS
RENEW SUCTION AND DISCHAGE GAUGES. CALIBRATION CERTIFICATE TO BE PROVIDED FOR GAUGES.
MANUFACTURING OF ZINC PLUGS AS PER SAMPLE
PAINTING OF MAIN ENGINES AND DIESEL GENERATOR INCLUDING SYSTEM PIPES AND ACCESSORIES WITH EQUIPMENT PAINT
CLEANING AND PAINTING OF ENGINE ROOM INCLUDING BILGES
MANUFACTURING OF SAFETY GUARD, AS PER SAMPLE
SERVICEABILITY CHECKS OF FLOOD SENSOR AND MAKE OPERATIONAL
HOT LAGGING ON EXHAUST PIPE LINE OF BOTH MAIN ENGINE AND DA
SECURING NUT FITMENT OF BILGE PLATES
ELECTRICAL
NAVIGATION LIGHT
REMOVE AND EXAMINE SEAWATER SIDE OF ALTERNATOR AIR COOLER FOR CORROSION, EROSION AND FOULING. CLEAN TUBE PLATE AND TUBES WITH WATER JET. CARRY OUT CHEMICAL CLEANING . PRESSURE TEST ON COMPLETION.
CHECK ALL THE CONTACT BOLTS OF THE GENERATOR OUTPUT TERMINAL AND THE BINDING POSTS OF THE EXCITATION SYSTEM ON THE CONTAT STUDS AND BOLTS ARE TIGHT AND FREE FROM CORROSION. CHECK ALL EARTH CONNECTIONS ARE TIGHT AND PROPERLY EARTHED.
CHECK INSULATION OF THE OUTPUT TERMINAL AND REVERSING SWITCH CONTACTS OF GOVERNOR MOTOR FOR SIGN OF BURNS/ CRACKS. REPLACE AS NECESSARY.
CARRY OUT OVERHAUL OF GOVERNOR MOTOR
CHECK AVR FOR SERVICEABILITY. CARRY OUT CALIBRATION. UNDERTAKE THE VOLTAGE CONTROL TEST AND PARALLELING TRAILS.
CHECK THE INSULATION RESISTANCE OF THE THERMO-COUPLE COMPENSATING LEADS.
CHECK SECURING ARRANGEMENT OF POWER AND CONTROL CABLES TO BUS BAR/ AVR. ALL LOOSE SCREWS TO BE TIGHTENED.
REPLACE THE FOLLOWING (A) ELECTRICAL TEMPERATURE INDICATOR. (B) TACHO-METER TRANSMITTER. (C) BALL AND ROLLER BEARING OF SW PUMP MOTOR.
CARRY OUT SPM CHECKS, PHASE BALANCING, INSULATION MEASUREMENT. AND REPLACE BEARINGS, CARRY OUT LOAD TRIALS AND RECORD RESULTS IN LOG BOOK.
CARRY OUT CALIBRATION OF OVER VOLTAGE PROTECTION UNIT (OVPU), REVERSE POWER RELAY AND OVER SPEED TRIP.
CARRY OUT OVERHAULING OF ALTERNATOR AND ENSURE ALL CABLE GLANDS, JOINTS OF SHEET METAL ON THE ALTERNATOR ARE AIR TIGHT AND ALL SEALING STRIPS OF TERMINAL BOX COVER ARE RENEWED.
CARRY OUT SERVICEABILITY CHECKS OF ALL INSTRUMENTATION.
OVERHAULING AND RENEW/REPLACE BEARINGS OF FOLLOWING MOTORS. (A) ELECTRIC DAVIT - 01 NOS. (B) AIR COMPRESSOR -02 NOS. (C) FO CENTRIFUGE - 01 NOS. (D) BILGE/GS PUMP - 01 NOS. (E) FIRE/GS PUMP - 01 NOS. (F) DOMESTIC FW PUMP - 01 NOS. (G) FIRE MOTOR & MONITOR - 04 NOS.
OVERHAULING AND RENEW/REPLACE BEARINGS OF FOLLOWING MOTORS. (A) ELECTRIC DAVIT - 01 NOS. (B) AIR COMPRESSOR -02 NOS. (C) FO CENTRIFUGE - 01 NOS. (D) BILGE/GS PUMP - 01 NOS. (E) FIRE/GS PUMP - 01 NOS. (F) DOMESTIC FW PUMP - 01 NOS. (G) FIRE MOTOR & MONITOR - 04 NOS.
OVERHAUL AND CALIBRATE OF STARTERS OF THE FOLLOWING MOTORS. (A) HP AIR COMPRESSOR MOTOR STARTER-02 (B) BILGE AND BALLAST MOTOR STARTER-02 (C) GS PUMP MOTOR STARTER-02 (D) VSP COOLING PUMP MOTOR STARTER-02 (E) FRESH WATER PUMP MOTOR STARTER-02 (F) VENTILATION MOTOR STARTER-04 (G) WINDLASS MOTOR STARTER-01 (H) CAPSTAN MOTOR STARTER-01 (J) BOAT DAVIT MOTOR STARTER-01 (K) ENGINE ROOM SUPPLY FAN MOTOR - 02 NOS
EXAMINE COVER JOINTS .INSPECT THE SEARCH LIGHT INTERNALLY FOR SIGNS OF BURNING OR OVER HEATING OF COMPONENTS. REPLACE DEFECTIVE COMPONENTS.
OVERHAUL THE CONTACTORS.
LOAD SYNCHRONISING SYSYEM OF DGS NOT WORKING TO BE RECTIFIED.
REPAIR/RENEW DAMAGED INSULATION OF CABLES.
CALIBRATE ALL MEASURING INSTRUMENTS FITTED IN THE MAIN SWITCHBOARD.
RENEWAL OF 12 V, 110 AH LEAD ACID SMF BATTERRIES FOR M/E CONTROL SYSTEM
RENEWAL OF 12 V 7.2 AH LEAD ACID SMF BATTERRIES FOR D/G BACKUP
RENEWAL OF 12 V 180 AH LEAD ACID SMF BATTERRIES FOR STARTING OF 2 IN NO D/G,S
RENEWAL OF 12 V,120 AH LEAD ACID SMF BATTERRIES FOR M/E BACKUP, EMERGENCY LIGHTING AND NAV IGHTS.
CHECK ALARM INDICATING PANEL, RENEW INDICATOR BULBS, RECTIFY DEFECTS IN SENSOR, CIRCUIT AND WIRING.
CLEAN, CHECK AND REPAIR HELM INDICATOR, STEERING OPERATING SWITCH INCLUDING RUDDER ANGLE FEED BACK SWITCH.
230V AND 24 V NAVIGATIONAL LIGHTS NOT WORKING. OVERHAUL CONTROL PANEL AND LIGHTS.
10 IN NUMBER SWITCHES ARE UNABLE TO OPERATE. SUSPECT DEFECTIVE KNOBS/ SPRINGS. KNOBS TO BE REPLACED.
05 IN NUMBER WALL FANS (ALMONARD- HIGH SPEED) NOT WORKING. FANS TO BE REPLACED.
ELECTRIC KETTLE NOT WORKING. KETTLE TO BE REPLACED.
LIGHTING TRANSFORMER NO-1 PRODUCING HUMMING NOISE/OVERHEATING.TO BE OVERHAULED/ REPAIRED.
EMERGENCY SUPPLY (24 V DC) NOT AVAILABLE AT VARIOUS PLACES LIKE MDB & RECTIFIER UNIT IN VOID SPACE, MSB, EMERGENCY LIGHTS ETC. SUSPECT INTERNAL WIRING PERISHED. WIRING TO BE RENEWED. ( 2 CORE)
VOLTAGE MONITORING AND TRIPPING CIRCUIT NOT WORKING. SUSPECT MONITORING RELAY (MAKE-MINILLEC, MODEL- VCTD2 2CO-415 VAC) DEFECTIVE. RELAY TO BE REPALCED AND SYSTEM TO BE PROVED
18 W TUBES OF 2 FEET LENGTH NOT WORKING AT 16 PLACES. TO BE REPAIRED/REPLACED.
30 IN NOS 11 W "U" TYPE CFL LIGHTS AT VARIOUS PLACES NOT WORKING. TO BE REPAIRED/REPLACED.
TERMINAL STRIPS OF CONTROL DESK INDICATION SYSTEM IN WHEEL HOUSE IS INTERNALLY SHORT CIRCUITED. TERMINAL STRIPS TO BE REPLACED .
VOID SPACES 24 V DC MAIN DB CONNECTORS PERISHED, TO BE RENEWED.
02 IN NUMBER PERISHED CONNECTORS TO BE RENEWED IN 2.5 KW TRANSFORMER RECTIFIER UNIT AT VOID SPACE.
10 IN NUMBER THREE PHASE STARTERS ARE HARD TO OPERATE DUE TO WEAR OUT OF RED/GREEN PUSH BUTTONS. PUSH BUTTONS OF THE SAME NEED TO BE RENEWED.
03 IN NUMBER SPEAKERS OF MAIN BROADCAST/LOUD HAILER NOT WORKING. TO BE REPAIRED/REPLACED.
06 IN NUMBER INDICATION LAMPS OF SHORE SUPPLY JUNCTION BOX ARE DEFECTIVE. TO BE RENEWED
VSP COOLING SYSTEM FRESH WATER PP MOTORS ARE GETTING SWITCHED ON DURING CHANGE OVER OF SUPPLY FROM DG TO SHORE AND VICE-VERSA. SUSPECT AUTO CIRCUIT DEFECTIVE. TO BE RECTIFIED.
GENERAL ALARMS BELLS NOT WORKING. DEFECTIVE TO BE RECTIFIED.
SHORE SUPPLY CABLE PERISHED AT VARIOUS PLACES. TO BE RENEWED WITH 4X16 SQ.MM CABLE
INTERCONNECTING SOUND POWER TELEPHONES WITH BRIDGE NOT WORKING. TO BE REPAIRED
AMMETERS FITTED ON CONTROL PANEL OF BILGE PUMP AND HP AIR COMPRESSOR DEFECTIVE, TO BE REPLACED. CALIBRATION CERTIFICATE TO BE PROVIDED.
FIRE ALARM SYSTEM NOT WORKING. DEFECT TO BE RECTIFIED.
CHECK AND RENEW DEFECTIVE CONTACTS AND WIRING
CHECK AND RENEW BRAKE LININGS
CARRY OUT INSPECTION OF THE RUBBER GASKET BETWEEN COVER AND SHELL BODY OF THE CONTROLLER.
CARRY OUT COMPLETE OVERHAULING OF THE WINDLASS MOTOR AND CONTROLLER PANEL. CHECK ALIGNMENT ON RE-FITMENT & CARRY OUT LOAD TRIALS FOR 4 HOURS.
CARRY OUT OVERHAULING OF THE RANGES FOR PROPER OPERATION.
OVERHAUL, TEST AND RESET ALL SAFETY MECHANISM.
CARRY OUT OVERHAUL OF THE BROADCAST AND SRE EQUIPMENT. CHECK FOR OPTIMUM PERFORMANCE. TRIALS TO BE OFFERED POST OVERHAUL
PORT MAIN ENGINE BATTERY CHARGER NOT WORKING, TO BE REPLACED
NAVIGATION LIGHT NOT WORKING,TO BE REPLACED
SERVICEABILITY CHECKS OF SART
SERVICEABILITY CHECKS OF EPIRB
DD PACKAGE
DOCK BLOCK PREPARATION FOR DOCKING OF SHIP IN VERSION - I AND II, BOTH CENTER LINE AND SIDE BLOCKS. SHIPYARD TO ARRANGE FOR THIRD PARTY INSPECTION AND HAND OVER DULY RECOMMENDED CERTIFICATE FOR DOCK BLOCK PREPARATION TO NAVY POST INSPECTION
DOCKING AND UNDOCKING OF THE VESSEL IN VERSION-I&II (DURATION 60 DAYS). SHIPYARD TO PLAN AND COMPLETE ALL DRY DOCK RELATED WORK WITH IN DRY DOCK TIME. ELSE SHIPYARD TO CONTINUE DOCKING OF SHIP ALONG WITH ALL ALLIED SERVICES TILL COMPLETION OF WORK WITH OUT ANY EXTRA COST. PAYMENT WILL BE RESTRICTED TO ACCEPTED PERIOD OF CONTRACT
DOCKING & UNDOCKING (QUOTE AS ONE UNIT)
SUBSEQUENT DAYS IN DOCK.
ASSISTANCE FOR DOCKING & UNDOCKING (QUOTE AS ONE UNIT)
ARRANGE PILOTAGE FOR TAKING THE VESSEL FROM NAVAL JETTY TO THE DOCK, DOCKING, UNDOCKING & DELIVERY OF VESSEL BACK AT NAVAL JETTY.QUOTE UNIT RATE PER DAY
MOORING/UNMOORING AND LINE HANDLING FOR EACH OPERATION ESTIMATED FOR 4 OPERATION
SHIPYARD)
PROPULSION VOITH SYSTEM (PORT & STBD) (MAKE -M/S VOITH TURBO SCHNEIDER PROPULSION)
PROPULSION VOITH SYSTEM (PORT & STBD)
MAIN SEA CHEST VALVE (M/S TEMBA SHIPYARD)
HP JET CLEAN OF THE FOLLOWING AREA TO BE UNDERTAKEN (WITH A PRESSURE NOT EXCEEDING 3000 PSI) (I) U/W HULL (EXTERNAL) AREA
(ii) Boot top area
BLASTING OF FOLLOWING AREA TO BE UNDERTAKEN: (I) UNDERWATER HULL INCLUDING BOOT TOP
(II) WEATHER DECKS INCLUDING BULWARK
WEATHER DECKS HULL
POWER TOOL SURFACE AREA PREPARATION OF FOLLOWING AREA TO BE UNDERTAKEN: CARRY OUT POWER TOOL SURFACE PREPARATION OF FOLLOWING AREA TO ST 3 STANDARDS FOR UTG SURVEY AND PAINT APPLICATION WHEREEVER PEELED OFF / PAINT DEFECTIVE AS PER VISUAL SURVEY: TANK AND TANK TOP, BILGES , COFFERDOM, VOID SPACE AND CHAIN LOCKER
UTG SURVEY OF FOLLOWING ARE TO BE UNDERTAKEN. (I) UNDERWATER HULL INCLUDING BOOT TOP
SEA TUBES GRATING REMOVE,CLEAN,EXAMINE GRATINGS OF INLETS/ DISCHARGES AND SEA CHESTS. RENEW IF DETORIATED . PAINTING TO BE UNDERTAKEN POST EXAMINATION AS PER NO 53/16.
(II) WEATHER DECK
(III) TANK AND TANK TOP, BILGES , COFFERDOM, VOID SPACE AND CHAIN LOCKER
MANUAL CLEANING OF FOLLOWING AREA IS TO BE UNDERTAKEN: MANUALLY CLEAN FOLLOWING AREA AND PRESENT FOR VISUAL SURVEY.THE AREA SHOULD BE WASHED OUT WITH FRESH WATER AND SOAP WATER TO REMOVE ANY SEDIMENT OR DIRT PRESENT IN THE TANK (A) ENGINE ROOM BILGES (B) VOID SPACE (C) COFFERDOM (D) CHAIN LOCKER (E) WATER BALLAST TANK
BELTS
MANUALLY CLEAN FOLLOWING TANKS WITH FRESH WATER AND SOAP WATER TO REMOVE ANY SEDIMENT OR DIRT PRESENT IN THE TANK (A) FUEL TANK-02 (200 SQM) (B) LUB OIL TANK (55 SQM) (C) FOAM TANK-01 (75 SQM) (D) FRESH WATER TANK- (70 SQM)
SEA TUBE (A) HYDRO JET BLASTING, VISUAL SURVEY AND PRESSURE TESTING OF SEA TUBE INCLUDING SEA CHEST TO BE CARRIED OUT IF REPAIRED/RENEWED POST VISUAL SURVEY REPORT AND UTG REPORT. (B) CARRYOUT RENEWAL OF DEFECTIVE SEATUBES.
PAINTING WITH FULL PAINT SCHEME :- (I) UNDERWATER HULL INCLUDING BOOT TOP INCLUDING PAINT COST (PAINT TO BE SUPPLIED BY FIRM)
WEATHER DECK INCLUDING PAINT COST (PAINT TO BE SUPPLIED BY FIRM)
CHECK DRAUGHT MARKS ARE TO BE IN POSITION AND TO BE CLEARLY PAINTED. (PAINT WITH TWO COATS OF PRIMER, TWO COATS OF ANTICORROSIVE PAINT AND TWO COATS OF WHITE FINISH).
(A) CHAIN CABLE
(B) SWIVEL PIECE
(C) LUG LESS JOINING SHACKLES
(D) D SHACKLES
(E) ANCHORS INCLUDING SPARE ANCHOR
EXAMINE OF ALL SACRIFICIAL ANODES & RENEWAL IF CONSUMED MORE THAN 50% . (TYPE MK IV FOR U/W HULL, QTY 21 & TYPE MK III - QTY 22 )
TUBE/FIXED FENDERS SECURING BOLTS CORRODED AND PERISHED TO BE RENEWED. MAT -SS
STEEL RENEWAL IS REQUIRED TO BE CARRIED OUT POST SURVEY OF UNDER WATER HULL, SUPERSTRUCTURE, DECKS, PLATFORMS, DECK FITTINGS INCLUDING BOLLARDS/ CLEATS AND FOUNDATION OF ALL DECK MACHINERIES/ EQUIPMENTS. (HULL SURVEY BY NSRY TEAM (KOC))
AIR PRESSURE TESTING AIR PRESSURE TEST TO THE 0.2 BAR PRESSURE OF THE FOLLOWING TANKS TO BE UNDERTAKEN IF REPAIRED BY BUILD-UP/RENEWAL OR ARE SUBJECTED TO HOTWORK FOR WELDING OF PAD PIECE/ FOUNDATION ON THEIR BOUNDARIES: FRESH WATER TANK- 02 , LUB OIL TANK-01 , FO TANK -02, VOID SPACE/BALLAST TANK -02
ANCHOR AND CHAIN CABLE ANCHOR AND ANCHOR CHAIN CABLE AND ASSOCIATED FITTINGS ARE TO BE MECHANICALLY CLEANED, EASED FOR FREE MOVEMENT, HYDRO JET BLAST CHAIN CABLE TO BARE METAL, PAINT WITH BLACK BITUMINOUS PAINT POST SURVEY IAW NO 02/21 AND REFIT BACK. RENEW OFF ALL SUCH PARTS WHICH DECLARED UNSERVICEBILE & PROVE LOAD TEST AND SUBMIT LOAD TEST CERTIFICATE TO COY OFFICE. NOTE : -THE JOB INVOLVES REMOVAL OF ALL ANCHOR ACCESSORIES, LAYING OUT AND HYDRO JET BLASTING FOR SURVEY AND PAINTING AND FINAL REFITMENT POST SURVEY BY NSRY. DETAILS OF ACCESORIES ARE AS FOLLOWS:-
HAWSE PIPE COVER OF FOXLE FOUND TO BE CORRODED AND DAMAGED. SAME TO BE RENEWED ALONG WITH BUTTERFLY NUTS.
TYRE FENDERS TO BE RENEWED WITH SUPPORTING CHAIN AND SHACKLE INCLUDING FASTENERS. (MATERIAL GI )
INSPECT THE CONDITION OF VOITH BLADE FOR ANY DAMAGE AND ABNORMALITY.
INSPECT THE BLADE ACTUATING MECHANISM FOR PROPER FUNCTIONING.
CHECK THE AXIAL CLEARANCE OF BLADES WITH ROTOR CASING FOR CORRECT LIMITS AS PER USER MANUAL.
CHECK THE MAIN SEAL FOR ANY LEAKAGE AND GOOD CONDITION.
DRAIN THE HYDRAULIC OIL FROM THE ELEVATED TANK AND SYSTEM.FLUSH THROUGH THE SYSTEM AND CLEAN THE TANK. RENEW THE FILTERS (06 IN NOS) AND OIL(OIL AND FILTER TO BE SUPPLIED BY FIRM)
TECHNICAL SUPPORT
PROVIDE QA COVERAGE FOR ENTIRE WORK PACKAGE BY A REGISTERED THIRD PARTY INSPECTING AGENCIES EX - LRS, IRS, ABS ETC.
SHIPYARD TO SUBMIT QAP AND QIP WITH IN 2 WEEKS OF SIGNING OF CONTRACT
PROVIDE WHARFAGE / WET BASIN FACILITIES (WITH 6M DEPTH AT ALL CONDITIONS) AS REQUIRED FOR COMPLETION OF WORK PACKAGE. DREDGING AS REQUIRED TO BE CARRIED OUT PRIOR TO COMMENCEMENT OF REFIT AT SHIPYARD'S COST. PAYMENT WILL BE RESTRICTED TO ACCEPTED PERIOD IN THE CONTRACT
PROVISION OF SHORE POWER 3 PHASE, 415V, 50HZ, FOR 60 DAYS IN DRY DOCK & FOR THE DURATION OF STAY FOR COMPLETE REFIT INCLUDING NECESSARY CONNECTION / DISCONNECTION (RATES AS PER ACTUAL READING ON BOARD/ENERGY METER READING INSTALLED BY SHIPYARD) POWER SUPPLY CABLE AND METER TO BE PROVIDED BY SHIPYARD. QUOTE FOR 1000 KWH/DAY PAYMENT AT ACTUALS AS PER FINAL READING. SHIPYARDS TO INSTALL POWER . SHIP SHOULD BE EARTHED AT 04 POINTS WHILE IN DRY DOCK. EARTHING CABLE TO BE SUPPLIED BY SHIPYARDMETER/ ENERGY METER IN SUPPLY LINE
PROVIDE 02 SEA WATER FIRE MAINS WITH 06 BAR PRESSURE FOR ENTIRE DURATION WITH CONTROL VALVES, MANIFOLDS AND INCLUDE NECESSARY CONNECTION / DISCONNECTION. SHIPYARD TO CONNECT REFERENCE PRESSURE GAUGE AT DISCHARGE LINE. CALIBERATION CERTIFICATE OF PRESSURE GAUGES TO BE SUBMITTED ON START OF REFIT
SHIPYARD IS TO ESTABLISH A SECURITY PERIMETER AROUND THE VESSEL WITHIN 2 SENTRIES ROUND THE CLOCK
CCTV RECORD (WITH NIGHT VISION) OF THE ENTIRE SHIP'S PERIMETER TO BE KEPT FOR LAST THIRTY DAYS
PROVIDE CRANE 5 TON CAPACITY DURING THE REFIT (FOR NAVY'S REQUIREMENT ONLY. SHIPYARD REQUIREMENTS ARE TO BE CATERED IN SEPERATELY) PAYMENT AT ACTUALS
SHIPYARD TO ARRANGE FOR DEFUELLING OF SHIP PRIOR TO COMMENCEMENT OF REFIT.
CLEANING OF ALL TANKS, VENTILLATION AND OBTAINING GAS FREE CERTIFICATE IS THE RESPONSIBILITY OF SHIPYARD.
SHIP YARD HAS TO STORE THE DEFUELLED LSHFHSD AND AVCAT IN SUITABLE PLACE AND REFUEL THE SAME BACK TO SHIP AT END OF REFIT AFTER GETTING SERVICABLE CERTIFICATE FROM IOCL. CATER FOR FRESH FUEL IN CASE DEFUELLED LSHFHDS/ AVCAT GOT CONTAMINATED.
PROVIDE 08 FIRE FIGHTING TRAINED HOT WORK SENTRIES WITH 02 SUPERVISORS FOR 16 HRS EACH DAY FOR THE DURATION OF REFIT.NUMBER OF SENTRIES REQUIRED WILL BE INTIMATED BASED ON SHIP YARD'S REQUISITION FOR HOT WORK RECEIVED THE PREVIOUS DAY. PAYMENT AT ACTUALS
TEMPORARY LIGHTING AND VENTILLATION ONBOARD FOR THE ENTIRE DURATION OF REFIT TO BE PROVIDED IN ALL MACHINERY COMPARTMENTS, COMPARTMENTS WITHIN SUPERSTRUCTURE, ALL ALLEYWAYS/ PASSAGE WAYS, CARGO SPACE, BALLAST TANKSMUST BE WELL LIT WITH 24 VDC LAMPS. PROVISION OF MAXIMUM 20 LIGHT POINTS PER DAY. PAYMENT AT ACTUALS. PROVISION OF 05 PORTABLE INTAKE/ EXHAUST BLOWERS OF MINIMUM 02 KW RATING WITH ADEQUATE HOSING ARRANGEMENT. ARRANGEMENT ON AS REQUIRED BASIS. PAYMENT AT ACTUALS.
SHIPYARD TO ENSURE MOVEMENT OF STEEL FROM MO (KOC) / NSRY (KOC) TO SHIPYARD INCLUDING LOADING / UNLOADING, MANPOWER(04 PERSONNEL), TRAILOR, CRANE(02) AND FORK LIFT. PAYMENT AT ACTUALS
GENERAL & ADMIN SERVICES
STATIONARY IS TO BE PROVIDED FOR SMOOTH FUNCTIONING OF RMT OFFICE OF NSRY FOR RS 10,000/- PER MONTH
PROVIDE 01 IN NO "REFIT COORDINATOR" [PREFERABLY RETIRED IN SENIOR SAILORS (ERA/EAP)]. ALTERNATELY, PERSONAL WITH MINIMUM B. TECH (MECH/ELECTRICAL/ ELECTRONICS/NAVAL ARCHITECTURE) WITH MINIMUM EXPERIENCE OF 05 YEARS IN SHIP REPAIR FIELD. SALARY TO MATCH WITH SHIPYARD ASSISTANT MANAGER LEVEL. ADDITIONAL DAYS ARE INCLUDED FOR PRE & POST REPAIR/REFIT COORDINATION/ PLANNING ACTIVITIES. REQUIRED TO WORK IN TOUGH ENVIROMENT ONBOARD DURING VARIOUS REPAIRS/TRIALS, ON SHIFT BASIS ROUND THE CLOCK, INCLUDING SUNDAY/HOLIDAY AS PER DEMAND OF THE REPAIR/REFIT.
PROVIDE 01 IN NUMBER "REFIT ACCOUNTANT-CUM-AUDITOR" WITH ATLEAST MCOM DEGREE AND HAVING ACCOUNTING AND AUDIT EXPERIENCE FOR COMPLEX SHIP REPAIR CONTRACTS AND MULTISTAGE BILLS. MINIMUM EXPERIENCE 05 YEARS. SALARY TO MATCH SHIPYARD DEPUTY/ ASSISTANT MANAGER LEVEL. ADDITIONAL DAYS ARE INCLUDED FOR PRE & POST CONTRACT REPAIR/REFIT, AUDIT & BILLING ACTIVITIES. REQUIRED TO WORK AT OFFICE AS WELL AS IN TOUGH ENVIROMENT ONBOARD DURING VARIOUS REPAIRS/TRIALS, ON SHIFT BASIS INCLUDING SUNDAY/HOLIDAY AS PER DEMAND OF THE REPAIR/REFIT.
BoQ_Ver3.1
PROVIDE 01 IN NO "REFIT COORDINATOR" [PREFERABLY RETIRED IN SENIOR SAILORS (ERA/EAP)]. ALTERNATELY, PERSONAL WITH MINIMUM B. TECH (MECH/ELECTRICAL/ ELECTRONICS/NAVAL ARCHITECTURE) WITH MINIMUM EXPERIENCE OF 05 YEARS IN SHIP REPAIR FIELD. SALARY TO MATCH WITH SHIPYARD ASSISTANT MANAGER LEVEL. ADDITIONAL DAYS ARE INCLUDED FOR PRE & POST REPAIR/REFIT COORDINATION/ PLANNING ACTIVITIES. REQUIRED TO WORK IN TOUGH ENVIROMENT ONBOARD DURING VARIOUS REPAIRS/TRIALS, ON SHIFT BASIS ROUND THE CLOCK, INCLUDING SUNDAY/HOLIDAY AS PER DEMAND OF THE REPAIR/REFIT.
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (SPARE LIST) (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevant columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
LIST OF SPARES TO BE QUOTED BY THE SHIPYARDS
ENGINEERING
MAIN ENGINES MAKE-CATERPILLAR MODEL -3512
MAIN ENGINES MAKE-CATERPILLAR MODEL -3512
DIESEL GENERATOR MAKE - CUMMINS 6CTA
PROPULSION VOITH SYSTEM
AIR COMPRESSOR MAKE ELGI
FUEL SAPERATOR MAKE ALFA LAVAL
FUEL SAPERATOR MAKE ALFA LAVAL
Clamp-Hose
Hose-Reducer
Clamp AS
Filter Element AS-Air
Seal-O-Ring
Clamp
Clamp
Clamp
Bellows AS
FUEL SAPERATOR MAKE ALFA LAVAL
PROPULSION VOITH SYSTEM
Bellows
FUEL SAPERATOR MAKE ALFA LAVAL
Seal-O-Ring
Seal-O-Ring
Clamp AS
Clamp AS
Gasket
Bolt-High Temperature
Cartridge GP-Turbocharger
Gasket-Exhaust
Cartridge GP-Turbocharger
Kit-Repair
Kit-Repair
Single Cylinder Head Install Kit
Single Cylinder Head Install Kit
Lock-Retainer
Guide-Valve
Valve-Exhaust
Valve-Exhaust
Spring
FUEL SAPERATOR MAKE ALFA LAVAL
Rotocoil AS
FUEL SAPERATOR MAKE ALFA LAVAL
FUEL SAPERATOR MAKE ALFA LAVAL
Seal-Valve Stem
FUEL SAPERATOR MAKE ALFA LAVAL
FUEL SAPERATOR MAKE ALFA LAVAL
FUEL SAPERATOR MAKE ALFA LAVAL
Washer
Insert-Valve Seat
Plate Spacer
Screen AS-Suction
Spring-Lifter Guide
Cap AS
Ring-Retaining
Receptacle AS-Connector
Receptacle AS-Connector
Retainer-Spring
Spring-Injector
FUEL SAPERATOR MAKE ALFA LAVAL
FUEL SAPERATOR MAKE ALFA LAVAL
Harness AS-Wiring
Button
FUEL SAPERATOR MAKE ALFA LAVAL
FUEL SAPERATOR MAKE ALFA LAVAL
Screw-Adjusting
Bushing
Socket-Arm
Seal-O-Ring
FUEL SAPERATOR MAKE ALFA LAVAL
Clamp AS
Seal-O-Ring
FUEL SAPERATOR MAKE ALFA LAVAL
FUEL SAPERATOR MAKE ALFA LAVAL
FUEL SAPERATOR MAKE ALFA LAVAL
FUEL SAPERATOR MAKE ALFA LAVAL
FUEL SAPERATOR MAKE ALFA LAVAL
Washer-Spring
Seal-O-Ring
Seal-O-Ring
Seal-O-Ring
Plate Spacer
Dowel-Hollow
FUEL SAPERATOR MAKE ALFA LAVAL
FUEL SAPERATOR MAKE ALFA LAVAL
FUEL SAPERATOR MAKE ALFA LAVAL
FUEL SAPERATOR MAKE ALFA LAVAL
FUEL SAPERATOR MAKE ALFA LAVAL
Seal-O-Ring
Plate Spacer
FUEL SAPERATOR MAKE ALFA LAVAL
Seal-O-Ring
FUEL SAPERATOR MAKE ALFA LAVAL
Collar
Liner
Plate AS
FUEL SAPERATOR MAKE ALFA LAVAL
Collar
Liner
Rod AS-Zinc
Retainer
FUEL SAPERATOR MAKE ALFA LAVAL
Rod AS-Zinc
Rod AS-Zinc
Regulator-Temperature
Seal-Lip Type
Seal-Lip Type
Gasket-Housing Cover
Filter Element-Fuel
FUEL SAPERATOR MAKE ALFA LAVAL
FUEL SAPERATOR MAKE ALFA LAVAL
FUEL SAPERATOR MAKE ALFA LAVAL
FUEL SAPERATOR MAKE ALFA LAVAL
Seal-Ring
Grommet
Tube AS
Seal-O-Ring
FUEL SAPERATOR MAKE ALFA LAVAL
Valve-Check
Connector-Port
MAIN ENGINES MAKE-CATERPILLAR MODEL -3512
MAIN ENGINES MAKE-CATERPILLAR MODEL -3512
MAIN ENGINES MAKE-CATERPILLAR MODEL -3512
Seal-Rectangular
FUEL SAPERATOR MAKE ALFA LAVAL
Injector GP-Fuel
FUEL SAPERATOR MAKE ALFA LAVAL
Seal-O-Ring
FUEL SAPERATOR MAKE ALFA LAVAL
Pump AS-Fuel Priming
FUEL SAPERATOR MAKE ALFA LAVAL
Seal-O-Ring
Kit-Repair
Pump GP-Fuel Transfer
FUEL SAPERATOR MAKE ALFA LAVAL
FUEL SAPERATOR MAKE ALFA LAVAL
FUEL SAPERATOR MAKE ALFA LAVAL
FUEL SAPERATOR MAKE ALFA LAVAL
FUEL SAPERATOR MAKE ALFA LAVAL
FUEL SAPERATOR MAKE ALFA LAVAL
Breather AS
Seal-O-Ring
Retainer-Spring
Hose-Tee
Filter Element AS-Engine Oil
Kit-Repair
Liner-Rotor
Seal-O-Ring
Clamp AS
FUEL SAPERATOR MAKE ALFA LAVAL
FUEL SAPERATOR MAKE ALFA LAVAL
FUEL SAPERATOR MAKE ALFA LAVAL
Valve-Bypass
Damper-Bolt
Shaft AS-Pump
Spool-Pressure Relief
Shaft AS-Pump Drive
After Cooler Kit
Oil Cooler Kit
Turbo Kit
Fuel Injector Kit
Water Pump Rebuild Kit
Water Pump Rebuild Kit
Water Pump Install Kit
Kit-Repair
Seal-O-Ring
12v Heavy Duty Battery
CAT DEO CI4 208 LTR
Seal-O-Ring
Seal-O-Ring
Seal-O-Ring
Sensor Speed
Planger
Starting Motor
Starting Motor
Valve Relay
Valve Kit
Valve Kit
Valve Relay
Control Gp Monitor
Harness As Control
Harness As Control
Control Gp Monitor
Adapter As
Control Gp Monitor
CLAMP,T BOLT
SEAL,O RING
HOSE,PLAIN
HOSE,PLAIN
HOSE,FLEXIBLE
VALVOLINE PREMIUM BLUE 7800 PLUS 1/20 LTR
ELEMENT,LUB OIL FILTER
KIT,HX40 TURBO REPAIR
ELEMENT,AIR CLEANER
Harness As Control
Harness As Control
HOSE,ELBOW
HOSE,FLEXIBLE
HOSE,HUMP
GASKET,SEA WATER PUMP
Control Gp Monitor
Control Gp Monitor
SEAL,RECTANGULAR RING
SEAL,ROCKER LEVER COVER
SEAL,INJECTOR
Valve Kit
DRAINCOCK
WASHER,SEALING
Control Gp Monitor
FILTER,FUEL
KIT,HX40 TURBO REPAIR
Control Gp Monitor
GASKET,INT MANIFOLD COVER
CLAMP,HOSE
Harness As Control
PLUG,ZINC ELECTRODE
RESISTOR,CORROSION
SEPARATOR,FUEL WATER
CAP,FILLER
GASKET,CONNECTION
COOLANT,EG 50:50 PREMIXED 50 LT DRUM
GAUGE,SIGHT
MANIFOLD,FUEL
ROD,PUSH
ROD,PUSH
ROD,PUSH
ROD,PUSH
ROD,PUSH
ROD,PUSH
CLAMP,V BAND
DAMPER,VIBRATION
INJECTOR
TAPPET,VALVE
TUBE,INJECTOR FUEL SUPPLY
TUBE,FUEL DRAIN
TENSIONER,BELT
KIT,WATER PUMP
MAIN SEAL
KIT,WATER PUMP
HYDRAULIC OIL FILTER
CONTROL RELAY
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.07 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
RFPSARTHINR25.pdf
Tender Documents • 0.48 MB
BOQ_834181.xls
BOQ • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .