SOU BRIDGE
18 conditions · 4 needing a document upload
Financial Eligibility Criteria: as per Clause 10.2 ofPart-I ofIRSGCC-2022 and as per Railway BoardAdvance correction slipNo.1 dated 14-07-2022 Thetenderer must have minimumaverage annualcontractual turnover of V/N or "V" whichever isless:where V= Advertised value of the tender in croresof RupeesN= Number of years prescribed forcompletion of work for whichbids have beeninvited. The average annual contractualturnovershall be calculated as an average of "totalcontractual payments"in the previous threefinancial years, as per the audited balancesheet.However, in case balance sheet of the previous yearis yetto be prepared/ audited, the audited balancesheet of the fourthprevious year shall be consideredfor calculating average annualcontractual turnover.The tenderers shall submit requisiteinformation asper Annexure-F (Annexure-VIB of GCC), alongwithcopies of Audited Balance Sheets duly certifiedby the CharteredAccountant/ Certificate fromChartered Account duly supportedby Audit balanceSheet
Financial Eligibility Criteria: As per Clause 10.2 ofIRSGCC- 2022(As per Advanced Correction slip No,1dated. 14.07.2022 to GCC-2022) and the same ismentioned in Para No.10.2 page no. 15 ofthistender document. Tenderer should attach Selfattested/Digitally signed copy of Certificate showingminimum averageannual contractual turnover asper Annexure VIB of IRSGCC- 2022(As per AdvancedCorrection slip No,1 dated. 14.07.2022 to GCC-2022) in Annexure - "F"Page-32 of MasterDocument 1 attachedto the tender
B-VI (E) : Any Civil Engineering work excluding zonal works (HQ Lr No W.148/P/SNW/2025 dated 02.12.2025)
Technical Eligibility Criteria: as per Clause 10.1 ofPart-I ofIRSGCC-2022 (a) The tenderer must havesuccessfully completedor substantially completedany one of the following categories ofwork(s) duringlast 07 (seven) years, ending last day ofmonthprevious to the one in which tender is invited:(i) Three similarworks each costing not less than theamount equal to 30% ofadvertised value of thetender, or (ii) Two similar works eachcosting notless than the amount equal to 40% ofadvertisedvalue of the tender, or (iii) One similarwork costing not less thanthe amount equal to 60%of advertised value of the tender
(b) (1) In case of tenders for composite works (e.g.worksinvolving more than one distinct component,such as CivilEngineering works, S&T works,Electrical works, OHE works etc.and in the case ofmajor bridges substructure, superstructureetc.),tenderer must have successfully completed orsubstantiallycompleted any one of the followingcategories of work(s) duringlast 07 (seven) years,ending last day of month previous to theone inwhich tender is invited: (i) Three similar workseachcosting not less than the amount equal to 30%of advertisedvalue of each component of tender, or(ii) Two similar works eachcosting not less than theamount equal to 40% of advertisedvalue of eachcomponent of tender, or (iii) One similar workeachcosting not less than the amount equal to@10<37@of advertisedvalue of each component of tender.Note for b(1): Separatecompleted works ofminimum required values shall also beconsideredfor fulfilment of technical eligibility criteriafordifferent components. (b)(2) In such cases, whatconstitutes acomponent in a composite work shallbe clearly predefined withestimated tender cost ofit, as part of the tender documentswithout anyambiguity. (b) (3) To evaluate the technicaleligibilityof tenderer, only components of work asstipulated in tenderdocuments for evaluation oftechnical eligibility, shall beconsidered. The scopeof work covered in other remainingcomponentsshall be either executed by tenderer himself if 1.1.1 hehaswork experience as mentioned in clause 7 of theStandardGeneral Conditions of Contractor throughsubcontractor fulfillingthe requirements as perclause 7 of the Standard GeneralConditions ofContract or jointly i.e., partly himself andremainingthrough subcontractor, with priorapproval of Chief Engineer inwriting. However, ifrequired in tender documents by way ofSpecialConditions, a formal agreement duly notarized,legallyenforceable in the court of law, shall beexecuted by the maincontractor with thesubcontractor for the component(s) ofworkproposed to be executed by thesubcontractor(s), and shall besubmitted along withthe offer for considering subletting of thatscope ofwork towards fulfillment of technical eligibilitySuchsubcontractor must fulfil technical eligibilitycriteria as follows:The subcontractor shall havesuccessfully completed at least onework similar towork proposed for subcontract, costing not lessthan35% value of work to be sub-let, in last 5 years,ending lastday of month previous to the one inwhich tender is invitedthrough a works contract.Note: for subletting of work costing upto Rs 50 lakh,no previous work experience of subcontractorshallbe asked for by the Railway. In case afteraward of contract orduring execution of work itbecomes necessary for contractor tochangesubcontractor, the same shall be donewithsubcontractor(s) fulfilling the requirements asper clause 7 of theStandard General Conditions ofContract, with prior approval ofChief Engineer inwriting
Note for Item 10.1 of IRSGCC-2022: Workexperience certificatefrom private individual shallnot be considered. However, inaddition to workexperience certificates issued by anyGovt.Organization, work experience certificateissued by Public listedcompany having averageannual turnover of Rs 500 crore andabove in last 3financial years excluding the current financialyear,listed on National Stock Exchange or BombayStockExchange, incorporated/registered at least 5years prior to thedate of closing of tender, shallalso be considered provided thework 1.1.2 experiencecertificate has been issued by a personauthorizedby the Public listed company to issue suchcertificates.In case tenderer submits workexperience certificate issued bypublic listedcompany, the tenderer shall also submit alongwithwork experience certificate, the relevant copyof work order, billof quantities, bill wise details ofpayment received duly certifiedby CharteredAccountant, TDS certificates for allpaymentsreceived and copy of final/last bill paid bycompany in support ofabove work experiencecertificate
Instructions to Tenderers and Conditions of Tender:Tenders arerefer Annexure-I, Tender Form (SecondSheet) Part-I of IRSGCC-2022 is mentioned frompage No. 11 - 26 of Master Document -1attached tothe tender
18 conditions · 6 needing a document upload
Please enter the percentage of local contentin thematerial being offered. Please enter 0for fully importeditems, and 100 for fullyindigenous items. The definitionandcalculation of local content shall be inaccordancewith the Make in India policy asincorporated in thetender conditions
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tender value is including escalation of (-)15% (minusfifteen percent ) on CPWD DSRrates. Tenderer shouldnote this beforequoting the rates
The original Bank Guarantee (in lieu of BidSecurity)should be delivered in person to theofficial nominated(i.e. OS/Tenders/Engg) /BZA Division) as indicated in thetenderdocument before closing date for submissionofbids (i.e. excluding the last date ofsubmission of Bids).
All the instructions furnished in the TechnicalCompliance/ Commercial Compliance /Custom / Undertakings /General Instructionsare only indicative and notexhaustive. Thetenderer shall read the GCC /Tenderdocuments for complete details
The tenderer shall thoroughly go through theentiretender document and strictly adhere tothe instructionand directions given therein
GDR-BZA section : Repairs to badly damaged bed blocks for bridge Nos 542 DN and 586 DN in SSE/W/KVZ section of ADEN/OGL Sub division .
E-07-south-BZA-2026
E-07-south-BZA-2026
Open
Works - General
6 Months
Krishna, Andhra Pradesh
₹0
₹2.0 L
18 May 2026
27 Apr 2026
4 May 2026
24 items across 4 schedules · ₹98,03,294.31 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying Plain Cement Concrete 1:3:6 with graded stone aggregate of 40mm nominal size, in foundation and floors, retaining walls of bridges including mechanical mixing, vibrating, pumping and bailing out water where ever required with all materials and labour complete but excluding the cost of cement and shuttering as per drawings and technical specifications as directed by Engineer. | cum | 14.00 | 2,599.66 | 36,395.24 |
| 2 | Providing and launching in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the Precast Prestressed (Pre- tensioned) concrete girder/slab in contractor's casting yard, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability, complete as per specifications and direction of the Engineer. Note: 1. Payment f o r Shuttering, Cement, Reinforcement, HTS cables including stressing and launching of girder/slab in position shall be made extra under relevant items. However, deduction shall be made in case of slab as per relevant item. 2. For pre-cast item, loading in transport vehicle in casting yard is included and shall not be paid extra. 3. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item. | cum | 63.00 | 2,646.72 | 1,66,743.36 |
| 3 | Up to 5.00 Km | MT | 1575.00 | 119.08 | 1,87,551 |
| 4 | Guniting concrete surface with cement mortar of average thickness 25mm along with wire mesh 50x50x3mm, applied with compressor after cleaning surface and spraying complete including curing as per procedure and technical specifications given under Para 209.3 of IRBM. Rate is excluding the cost of cement which shall be paid extra. | Sqm | 750.00 | 569.39 | 4,27,042.5 |
| 5 | Providing and inserting nipples of size 12 to 20 mm dia. with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary after completion of grouting. | Each | 150.00 | 61.45 | 9,217.5 |
| 6 | Neat Cement Grout with 20% anti shrinkage compound w.r.t. cement. | Kg | 750.00 | 299.06 | 2,24,295 |
| 7 | Cement Sand Mortar (1:1) Grout with 20% anti- shrinkage compound w.r.t. cement. | Kg | 300.00 | 111.82 | 33,546 |
| 8 | Epoxy Grout | Kg | 225.00 | 1,234.54 | 2,77,771.5 |
| 9 | Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement complete as per Technical Specification with average thickness of 10mm including priming coat, mortar plaster and seal coat of epoxy. | Sqm | 80.00 | 941.21 | 75,296.8 |
| 10 | Applying shotcrete mixture of average thickness 40mm over masonry / concrete including removal of defective concrete, raking the mortar in joints, cleaning the surface thoroughly, fixing 50x50x3mm wire mesh over the surface for application of grout mixture comprising cement, sand, coarse aggregate, water, quick setting compound complete as per procedures and specifications given in IRBM Para No 209(3) including curing. Rate is excluding the cost of cement which shall be paid extra. | Sqm | 180.00 | 631.57 | 1,13,682.6 |
| 11 | 20mm thick polymer mortar | Sqm | 300.00 | 1,298.25 | 3,89,475 |
| 12 | Providing cast in situ bridge number plaques as per Railway drawing in cement concrete 1:2:4 mix using 20mm hard stone aggregate embedded in 30mm notch in Bridge parapet coping duly engraving the letter and figures and an arrow indicating the direction of flow and finishing the top exposed surface with cement mortar 1:3, painting letters and figures with two coats of black enamel paint on two coats of white background with all labour, tools, cement, paint etc. with all leads and lifts. | Each | 4.00 | 744.16 | 2,976.64 |
| 13 | 900mm dia. | Metre | 50.00 | 6,556.98 | 3,27,849 |
| 14 | Dewatering of natural or accumulated water from any location. Payment to be done for Horse power of pump multiplied by pumping hours. | HP Hour | 240.00 | 40.58 | 9,739.2 |
| Schedule total | ₹22,81,581.34 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
26.02.2026_RevisedApprovedlistofBrandsandMakes2026withallenclosures.pdf revised approved
ATTACHMENT
29.12.2025-DLPforBridgesRUBROB.PDF
ATTACHMENT
EARTHWORKCONDITIONS07.pdf
ATTACHMENT
GENERALCONDITIONS07.pdf
ATTACHMENT
GENERALCONDITIONSFORPSCSLABS07.pdf
ATTACHMENT
SAFETYPRECAUTIONSTOBETAKENATWORKSITE07.pdf
ATTACHMENT
SNW-2025-Approved.pdf
ATTACHMENT
SPECIALCONDITIONSFORBUILDINGWORKS07.pdf
ATTACHMENT
SPECIFICATIONSOFCONTROLLEDCONCRETE7.pdf
ATTACHMENT
STEELSPECIALCONDITIONS07.pdf
ATTACHMENT
TRDsafetyconditions07.pdf
ATTACHMENT
MasterDocument12026.pdf
ATTACHMENT
MasterDocument22026.pdf
ATTACHMENT
26.02.2026_RevisedApprovedlistofBrandsandMakes2026withallenclosures.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .