Loading…
Loading…
Tender Value
₹82.5 L
EMD Value
₹1.6 L
Closing Date
11 Jul 2026, 4:00 pm2d left
Executive Engineer I-FC Division Kargil
Executive Engineer I-FC Division Kargil
Construction of H/W supply channel Gongyur khul and Yukyur Khul RD (0-500) mtr under the project Remodeling of Yukyur / Gongyur Khul Namsuru (Under CAPEX)
2026_PWD_19138_3
e-Tender 11 of 2026-27/INFC Kargil
Open Tender
Civil Works - Canal
120 days
Kargil
Please refer Tender documents.
4 documents required · 4 mandatory
₹830
Payable To Executive Engineer I-FC Division Kargil
₹1.6 L
1 Jul 2026
1 Jul 2026
13 Jul 2026
1 Jul 2026
11 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by manual means over areas (exceeding 30cm in depth ,1.5m in weadth as well as 10 sqm on plan ) including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5m ,as directed by Engineer -in-charge | |||||
| 1.01 | All Kind of soil 50% | 300.7 | Cum | 442.26 | ₹1,32,987.58 |
| 1.02 | Ordinary Rock 30% | 180.42 | Cum | 701.63 | ₹1,26,588.08 |
| 1.03 | Hard Rock (R.B) 20% | 120.28 | Cum | 932.01 | ₹1,12,102.16 |
| 2Earth work in excavation by manual means in foundation trench or drains (not exceeding 1.5m in weadth or 10 sqm on plan )including dressing of sides and ramming of bottoms ,lift upto 1.5m ,including getting out the excavated soil and disposal of surplus excavated soil as directed ,within a lead of 50m | |||||
| 2.01 | All Kind of soil 70% | 683.27 | Cum | 430 | ₹2,93,806.1 |
| 2.02 | Ordinary Rock 20% | 195.22 | Cum | 793.22 | ₹1,54,852.41 |
| 2.03 | Hard Rock (R.B) 10% | 97.61 | Cum | 985.88 | ₹96,231.75 |
| 3 | Dumping /Filling of stones in horizontal level excluding cost of stone | 130 | Cum | 266.17 | ₹34,602.1 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:3:6 (1 cement: 3 coarse sand : 6 graded stone aggregate 20mm nominal size | 306.4 | Cum | 6,080.38 | ₹18,63,028.43 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_45601.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid