| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹89.2 LAccepted-AOC | L1 | Accepted-AOC LOWEST BID | |
| 2 | Rejected-Technical UTTARAKHAND UT | CHAMOLI | UTTARAKHAND | 246435 | - | Rejected-Technical see attachment |
Tender Value
₹94.2 L
EMD Value
₹1.9 L
Closing Date
17 Dec 2022, 5:00 pmClosed
Superitending Engineer
SE UTTARAKHAND JAL SANSTHAN CIRCLE-GOPESHWAR
Supply, Laying and Jointing of G.I. Pipe line (m), FHTC and other appurtenant works of Phase II Gumad Water supply scheme in block Tharali of District chamoli under Jal jeewan mission FY 2022-23
2022_UKJS_52283_2
404/e-tender notice/2022-23 Date 02-12-2022
Open Tender
Civil Works - Water Works
Item Wise
150 days
Gopeshwar
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
Executive Engineer UJS
₹1.9 L
Gopeshwar
29 Aug 2023
3 Dec 2022
19 Dec 2022
3 Dec 2022
17 Dec 2022
5 Dec 2022
5 Dec 2022
Supply, Laying & Jointing of G.I. Pipe line (m), FHTC and other appurtenant works of Phase II Gumad Water supply scheme in block Karanprayag is of District chamoli under Jal jeewan mission FY 2022-23. All rates shall be included all types of taxes and G.S.T.
Construction of steel intake chamber haing (0.6mx0.6mx0.6m) size at taing point for collection o water in including supply of all materials,labour,T&P etc.
Construction of RCC Roughening filter cum screening chamber near by tapping point for following sources in different zones under existing wate supply scheme, for collection of water including supply of all materials, labour, T&P etc.
Construction of Break Pressure Tank of Size ( 1.0mx 1.0mx1.0m) including supply of all materials, labour, T&P etc. Complete.
Supply of all materials, labour, T&P etc and Construction of R.C.C. Sump/CWR of following capacities (KL) with M.S ladder outside of the tank, M.S.M.H cover with locking arrangement , supply and fixing sluice valves, pipe pieces (including cost of materials) flooring 0.60 M wide apron, Painting with approved water proofing (apex) / enamal paint, testing filling water for testing purpose etc. including supply of vertical pipes and specials, assuming bearing capacity as 8MT/M2. 35.00 KL
Supply and fixing of FRP Coated MS Bucket type chlorinator of 25 Litre capacity with chorination arrangments
Providing of all materials, carting from site store to site of work, laying & jointing of G.I. Medium screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc.) in trenches with its cutting, threading and testing of pipe line etc complete. (GI medium quality (As per marked G.I. Pipe conforming to is 1239)) 20.00 mm
Dismantaling of following dia screwed & Socketed GI pipes, Specials and fitting including taking out of dismantaled GI pipe & specials from tranches and stacking them properly within 50.00 mtr but exluding the cost of earth work 40.00 mm
Relaying of dimantled G.I. Pipe in true allingment in trenches including supply of all material, labour, T&P etc. complete. 40. 00 mm
Hight head cast iron sir valves 15 mm (T.P.-10 kg/Sqcm)
20 mm (T.P.-10 kg/Sqcm)
Excavation of earth for pipe line in following strata lift upto 1.5m. Lead upto 30m. Including refilling,watering,ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m. Fromtrenches including supply of labour,T&P.etc complete.Assuming that 60% pipe line is laid in trenches ,it is estimated that 75% exavation will be in soil mixed with shingle,bajri&boulders and rest 25%will be in soft rock (a) Soil mixed with boulder and bajri
(b) Soft rock/Medium rock
Supply of all materials,labours,T&P etc and construct wheel valve chamber as per type design complete (A) Wheel valve Chamber 0.60x0.60
(B) Wheel valve Chamber 0.90x0.90
Supply of all materials, labour, T&P etc and making ferrule connection to provide FHTC to the consumers under JJM complete (assuming average 30.00m length for a single connection) (As per household survey)
Provision for cutting of CC Khharinja
Reinstalment of Khharinja CC kharrinja
RR Stone Masonary with 1;6 cement and sand mortar along the laid in dry for pipe line for proper comletion of work
RR stone masonary laid in dry for pipe line
Cartage of Material
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .