Loading…
Loading…
Tender Value
₹10.2 L
EMD Value
₹5,200
Closing Date
12 May 2026, 10:30 amClosed
Dr NTTPS
SE CHP DR NTTPS
Fabrication & replacement of worn out liner and mother plates, deck/sealing sheets in various chutes & conveyors, in vibrating feeders and hoppers of Wagon Tipplers 1-4, stringers supports & fabrication, reconditioning & refixing of sump pumps as and when required during the period from 01-04-2026 or from the date of commencement of work to 30-09-2026 in M-I(Conveyors) Sub-Divn.,-MM (CHP)/Stage-I&II/ Dr. NTTPS
930074
E-38/26-27 CE/OM/DrNTTPS(SE/OM/CHP)
OPEN - NCB
Annual maintenance works
KRISHNA
8 documents required · 8 mandatory
₹362
₹5,200
27 May 2026
6 May 2026
6 May 2026
Fabrication of liner and mother plates, deck/sealing sheets, stringers supports in various chutes & conveyors for M-I(conveyors)
Fabrication of liner and mother plates for VF chutes, hopper liner-plates, hopper grid pieces, rail table platform of Wagon Tipplers 1 to 4 of M-I (Conveyors) by using 6/8/10/12/20 mm thick MS/SS
Erection of liner and mother plates, deck/sealing sheets, stringers supports in various chutes & conveyors, for M-I(conveyors)
Erection of liner and mother plates for VF chutes, hopper liner-plates, hopper grid pieces, rail table platform of Wagon Tipplers 1 to 4 of M-I (Conveyors) by using 6/8/10/12/20 mm thick MS/SS plates
Removal of worn-out liner and mother plates, deck/sealing sheets, stringers supports in various chutes & conveyors, for M-I(conveyors)
Removal of worn-out liner and mother plates for VF chutes, hopper liner-plates, hopper grid pieces, rail table platform of Wagon Tipplers 1 to 4 of M-I (Conveyors) by using 6/8/10/12/20 mm thick MS/SS plates
Labour charges for fabrication of bracket assembly for sump pumps at head/tail end and middle of 1A/B,1C/D,2A1/B1 and 6A/B conveyors
Labour charges for reconditioning of impeller casing of sump pump by turning of the given impeller casing to make uniform surface and fabrication of cast iron bush assembly to suit in the impeller casing including Material and machining charges.
Labour charges for removal, servicing, re fixing and erection of sump pumps at head/tail end and middle of 1A/B,1C/D, 2A1/B1 and 6A/B conveyors
Note:1. The firm has to quote their acceptable % excess/less on the above mentioned total amount for carrying out the subject work as & when required during the year 2026-27 as per the scope of work attached to this schedule
2. The statutory appliances EPF , ESI shall be reimbursed subject to production of proof of acquittances and limited to the rates & rules applicable from time to time.GST will be paid extra as per the rates & rules applicable from time to time.
3.If any deviation in quoting the tender by the tenderer will be liable for rejection
4. The standard field quality plan should be enclosed to the tender enquiry by incorporating the clause that ”the contractor should submit the FQP duly signed along with the tender schedule
5. FQP shall be approved by QC wing
6. The contractor should engage sufficient man power for completion of the work within time as instructed by the Engineer In charge without fail or else necessary action will be initiated
CE/O&M/Dr.NTTPS
stage.html
html • 0.01 MB
aoc.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.01 MB
General Conditions- E procurement -2026-27.pdf
TENDER_DOCUMENT • 10.25 MB
Notice.doc
TENDER_DOCUMENT • 0.06 MB
Schedula.xlsx
TENDER_DOCUMENT • 0.67 MB
specification.doc
TENDER_DOCUMENT • 0.12 MB
undertaking.docx
TENDER_DOCUMENT • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .