| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹45.9 LAccepted-AOC | 1 | Accepted-AOC L1 bidder | |
| 2 | 2₹63.9 L+₹6.0 L (10.3%)Rejected-AOC | 2 | Rejected-AOC L2 bidder | |
| 3 | Rejected-Technical H 37 CHAITHANYA AKG NAGAR MURIKKAVU WEST YAKKARA PALAKKAD | PALAKKAD | KERALA | 678001 | - | Rejected-Technical Not submited the required documents mentioned in the tender | |
| 4 | Rejected-Technical | - | Rejected-Technical Not submited the required documents mentioned in the tender |
Tender Value
₹38.7 L
EMD Value
₹50,000
Closing Date
14 Mar 2022, 12:00 pmClosed
CEO Technopark
Park centre building Technopark Phase-I campus Trivandrum - 695581
CONSTRUCTION OF TOE WALL NEAR THE SOLID WASTE MANAGEMENT SHED LOCATED AT THE REAR SIDE OF THEJASWINI BUILDING IN PHASE-I CAMPUS, TRIVANDRUM
2022_ETPK_473640_1
ETPK/PH1/113/2021-22
Open Tender
Civil Works - Others
Item Rate
30 days
Technopark Phase-I Campus Trivandrum
The bidder on their own should have successfully completed Earth Protection works with
geotextile coir mat for soil stabilization during the last five years
6 documents required · 6 mandatory
₹2,950
₹50,000
Park Centre building Technopark
1 Sept 2022
9 Feb 2022
15 Mar 2022
9 Feb 2022
14 Mar 2022
10 Feb 2022
16 Feb 2022
Amount
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared The rate inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed: All Kinds of soil The rate inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. All kinds of soil The rate inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) The rate inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Dry rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 ( 1 cement : 6 coarse sand: 12 graded stone aggregate 20 mm nominal size) including cost of through stone and bond stone. The rate inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) The rate inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo - Mechanically Treated bars of grade Fe-500D or more The rate inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with: Cement mortar 1:6 (1 cement : 6 coarse sand) The rate inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete. The rate inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Supply and fixing of open weave woven coir mat blanket made with fully biodegradable coir fibers to form a strong quilted mat ( minimum mass per unit area 1000gm/sqm including bamboo nail of depth minimum 500mm at 1m C/C spacing as per the technical specifications. The rate inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Grassing with 'Ramacham' grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn free from weeds and fit for moving including supplying good earth if needed .In rows 15 cm apart in either direction The rate inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
PRAMOD.k
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .