Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36,297.22Admitted-Finance | ₹36,297.22 | L1 | Admitted-Finance |
| 2 | L2₹36,904.98Admitted-Finance | ₹36,904.98 | L2 | Admitted-Finance |
| 3 | L3₹55,060.20Admitted-Finance SARCH GANDERBAL J K 191131 | GANDERBAL | JAMMU AND KASHMIR | 191131 | ₹55,060.20 | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Disqualified |
| Sl No | Description | Qty | Unit | NEW AHANGER ENGINEERING WORKS L3 | ganie electricals L2 | Abdul Ahad Ganie L1 |
|---|---|---|---|---|---|---|
| 1.00 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as . Including removal of signboard and reinstallation. per direction of Engineer-in-charge | 0.95 | Cum | 200 ₹190 | 1,800 ₹1,710 | 2,000 ₹1,900 |
| 2.00 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : 25 meter beyond 1 m from cutting edge | 1.06 | Cum | 300 ₹318 | 490 ₹519.40 | 490 ₹519.40 |
| 3.00 | Centering and shuttering including strutting, propping etc. and removal of form for: Columns, pillars, piers, abutments, posts and struts | 14.14 | Sqm | 500 ₹7,070 | 190 ₹2,686.60 | 500 ₹7,070 |
| 4.00 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. | 1.7 | Cum | 9,500 ₹16,150 | 7,900 ₹13,430 | 8,200 ₹13,940 |
| 5.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 117.94 | Kg | 130 ₹15,332.20 | 117 ₹13,798.98 | 103 ₹12,147.82 |
| 6.00 | Providing 40x5 mm flat iron hold fast 40 cm long including fixing to frame with 10 mm diameter bolts, nuts and wooden plugs and embeddings in cement concrete block 30x10x15 cm 1:3:6 mix ( 1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | 4 | No | 4,000 ₹16,000 | 1,190 ₹4,760 | 180 ₹720 |
Tender Value
₹45,000
Closing Date
4 Dec 2025, 5:00 pmClosed
Executive Engineer, gen Div USHP-I, Sumbal
Executive Engineer, gen Div USHP-I, Sumbal, Kangan
Repairing of main gate of power house
2025_SPDC_295159_1
GDS/07 of 2025-26
Open Tender
Civil Works
60 days
Sumbal
Cost of tender document
EMD
Valid registration
Valid GST
Similar work experience with completion certificate
No debarment
2 documents required · 2 mandatory
₹100
Yes
Executive Engineer, USHP-I, Sumbal
Yes
22 Dec 2025
14 Nov 2025
6 Dec 2025
14 Nov 2025
4 Dec 2025
14 Nov 2025
Amount
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as . Including removal of signboard and reinstallation. per direction of Engineer-in-charge
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : 25 meter beyond 1 m from cutting edge
Centering and shuttering including strutting, propping etc. and removal of form for: Columns, pillars, piers, abutments, posts and struts
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more.
Providing 40x5 mm flat iron hold fast 40 cm long including fixing to frame with 10 mm diameter bolts, nuts and wooden plugs and embeddings in cement concrete block 30x10x15 cm 1:3:6 mix ( 1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size).
ganie electricals (BID ID -2660241)
NEW AHANGER ENGINEERING WORKS (BID ID -2651181)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.93 MB
BOQ_955104.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid