Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical MARINE CORPORATION OF INDIA PROP ANAND SHIP CARE INSTITUTE PVT LTD 25 9 14 MARINE TOWERS RAJAVARI VEEDHI VISAKHAPATNAM | Rejected-Technical Submitted experience documents is beyond 3 year period and which is not line with CSL tender conditions. Hence, your offer is technically not accepted. |
| 4 | Rejected-Technical C 111 STATION PLAZA STATION ROAD STATION ROAD BHANDUP W MUMBAI 400078 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400078 | Rejected-Technical Submitted experience documents is beyond 3 year period and which is not line with CSL tender conditions. Hence, your offer is technically not accepted. |
Tender Value
Refer Docs
Closing Date
28 Jun 2024, 12:00 pmClosed
DEPUTY GENERAL MANGER, SRM
Ship Repair Materials Department Cochin Shipyard Limited Kochi-682015 Kerala, India
TURNKEY JOBS OF HVAC FOR NAVY VESSELS
2024_CSL_198728_1
CSL/SRM3/ADV080-081
Open Tender
Marine Services
Turn-key
180 days
Cochin
Please refer the tender documents
2 documents required · 2 mandatory
₹0
Exempted
22 Jul 2024
19 Jun 2024
29 Jun 2024
19 Jun 2024
28 Jun 2024
19 Jun 2024
19 Jun 2024 - 27 Jun 2024
Amount
Scope 1 - Turnkey Job of HVAC - (RM.0788)
VENTILATION SYSTEM VARIOUS PLACES UNDERTAKE FOLLOWING ON VENTILATION SYSTEMS : -
CARRYOUT CHEMICAL CLEANING OF INTERNAL SURFACES OF ALL TRUNKINGS. (300 MTR) (MAT - AL/GI SHEET, 22 GUAGE) (DIA - 12 INCH X 18 INCH) (Service cost)
CARRYOUT CHEMICAL CLEANING OF INTERNAL SURFACES OF ALL TRUNKINGS. (300 MTR) (MAT - AL/GI SHEET, 22 GUAGE) (DIA - 12 INCH X 18 INCH) (Material cost)
REPLACE GREASE FILTERS INSIDE EXHAUST TRUNKING (Service cost)
REPLACE GREASE FILTERS INSIDE EXHAUST TRUNKING (Material cost)
RENEW AIR FILTER ELEMENTS / PADS. (Service cost)
RENEW AIR FILTER ELEMENTS / PADS. (Material cost)
SURVEY, REPAIR/ RENEW / MANUFACTURE DAMAGED TRUNCKING WITH FIRST CONNECTIONS AND INTERCONNECTING CANVAS CANOPY AS PER SAMPLE (150 MTR, MAT - AL SHEET, DIA 12 INCH X 18 INCH) CANOPY MAT - CANVAS (Service cost)
SURVEY, REPAIR/ RENEW / MANUFACTURE DAMAGED TRUNCKING WITH FIRST CONNECTIONS AND INTERCONNECTING CANVAS CANOPY AS PER SAMPLE (150 MTR, MAT - AL SHEET, DIA 12 INCH X 18 INCH) CANOPY MAT - CANVAS (Material cost)
CARRYOUT TRIALS OF A/C & VENTILATION SYSTEM TO ENSURE SATISFACTORY PERFORMANCE NOTE: PRE-REFIT TRIALS TO BE PROPOSED / CONDUCTED PRIOR TO START OF REFIT TO ASCERTAIN THE PERFORMANCE OF SYSTEM. PRE AND POST REFIT TRIALS TO BE WITNESSED BY HITU. (Service cost)
CARRYOUT TRIALS OF A/C & VENTILATION SYSTEM TO ENSURE SATISFACTORY PERFORMANCE NOTE: PRE-REFIT TRIALS TO BE PROPOSED / CONDUCTED PRIOR TO START OF REFIT TO ASCERTAIN THE PERFORMANCE OF SYSTEM. PRE AND POST REFIT TRIALS TO BE WITNESSED BY HITU. (Material cost)
PREWETTING SYSTEM VARIOUS PLACES
OVERHAUL, STRIP AND REFIT STATION SCHEMATIC SECTION SYSTEM AND ASSOCIATED VALVES. (Service cost)
OVERHAUL, STRIP AND REFIT STATION SCHEMATIC SECTION SYSTEM AND ASSOCIATED VALVES. (Material cost)
RENEW NOZZLE AND ADJUSTABLE PLUGS. ENSURE THAT PARONITE GASKETS OR AS PER OEM TECHINAL MANUAL ARE FITTED (QTY - 100 NO, MAT - BRASS, SIZE- 30MM) (Service cost)
RENEW NOZZLE AND ADJUSTABLE PLUGS. ENSURE THAT PARONITE GASKETS OR AS PER OEM TECHINAL MANUAL ARE FITTED (QTY - 100 NO, MAT - BRASS, SIZE- 30MM) (Material cost)
RENEW AND REFIT ALL DECK TELESCOPIC SPRINKLER HEADS. (QTY - 20 NO) (Service cost)
RENEW AND REFIT ALL DECK TELESCOPIC SPRINKLER HEADS. (QTY - 20 NO) (Material cost)
NOTE: I) TEST PIPE LINES HYDRAULICALLY AT A PRESSURE OF 10 KG/SQ.CM. II) INSPECT PROTECTIVE VALVES BY PRESSURE 16 KG/SQ.CM (FOR DEEPAK DESIGN PRESSURE - 13 BAR AND WORKING PRESSURE - 10 BAR). Pipe size - 20 mm, length -100 mtrs approx, Valves(screw down) qty 02, nozzles - 40 approx. (Service cost)
NOTE: I) TEST PIPE LINES HYDRAULICALLY AT A PRESSURE OF 10 KG/SQ.CM. II) INSPECT PROTECTIVE VALVES BY PRESSURE 16 KG/SQ.CM (FOR DEEPAK DESIGN PRESSURE - 13 BAR AND WORKING PRESSURE - 10 BAR). Pipe size - 20 mm, length -100 mtrs approx, Valves(screw down) qty 02, nozzles - 40 approx. (Material cost)
A/C CONDENSATE SYSTEM - VARIOUS PLACES UNDERTAKE ROUTINES OF AC CONDENSATE SYSTEM AS FOLLOWS: -
REPLACE AND RESET SAFETY VALVES. (Service cost)
REPLACE AND RESET SAFETY VALVES. (Material cost)
OVERHAUL AND REFIT ALL OF SYSTEM VALVES. (Service cost)
OVERHAUL AND REFIT ALL OF SYSTEM VALVES. (Material cost)
REPLACE AND CALIBRATE PRESSURE GAUGES (SUCTION AND DISCHARGE QTY 07) VIEW GAUGE MALFUNCTIONING. (Service cost)
REPLACE AND CALIBRATE PRESSURE GAUGES (SUCTION AND DISCHARGE QTY 07) VIEW GAUGE MALFUNCTIONING. (Material cost)
RENEW, REPAINT COATING OF AC CONDENSATE TANK (Service cost)
RENEW, REPAINT COATING OF AC CONDENSATE TANK (Material cost)
UNDERTAKE DR, OVERHAUL AND PROVE REMOTE OPERATION OF CONDENSATE PUMP Simple remote operating panel (MCR) for operation of AC condensate pump (FER) (Service cost)
UNDERTAKE DR, OVERHAUL AND PROVE REMOTE OPERATION OF CONDENSATE PUMP Simple remote operating panel (MCR) for operation of AC condensate pump (FER) (Material cost)
AUTO CUT IN / CUT OUT DFECTIVE. TO BE REFURBISHED BY REPLACING LEVEL SENSORS, CABLING ETC. OFFER TRIALS OF SYSTEM (Service cost)
AUTO CUT IN / CUT OUT DFECTIVE. TO BE REFURBISHED BY REPLACING LEVEL SENSORS, CABLING ETC. OFFER TRIALS OF SYSTEM (Material cost)
PACKAGE A/C PLANT (MAKE VOLTAS, CAPACITY - 4 TR) VARIOUS PLACES UNDERTAKE ROUTINES ON ALL 07 PACKAGE Acs AS FOLLOWS (MAKE VOLTAS, CAPACITY - 4 TR) : -
REMOVE PACKAGE AC UNIT FOR COMPLETE OVERHAUL. GAUGE PARTS. RENEW PARTS AS NECESSARY. REPLACE IF DEFECTIVE FOR ALL AC'S (Service cost
REMOVE PACKAGE AC UNIT FOR COMPLETE OVERHAUL. GAUGE PARTS. RENEW PARTS AS NECESSARY. REPLACE IF DEFECTIVE FOR ALL AC'S (Material cost)
REPLACE AND CALIBRATE ALL PRESSURE AND TEMPERATURE GAUGES.(QTY-07 EACH) VIEW MALFUNCTIONING. (Service cost)
REPLACE AND CALIBRATE ALL PRESSURE AND TEMPERATURE GAUGES.(QTY-07 EACH) VIEW MALFUNCTIONING. (Material cost)
REPLACE AND CALIBRATE EXPANSION VALVEs. (Service cost)
REPLACE AND CALIBRATE EXPANSION VALVEs. (Service cost)
UNDERTAKE RENEWAL, CHEMICAL CLEANING AND PRESSURE TEST EVAPORATORS AND CONDESORS VIEW EXISTING ITEMS CORRODED AND LEAKING. (Service cost)
UNDERTAKE RENEWAL, CHEMICAL CLEANING AND PRESSURE TEST EVAPORATORS AND CONDESORS VIEW EXISTING ITEMS CORRODED AND LEAKING. (Material cost)
REPLACE FREON DUMPING SYSTEM GOOSENECK FROM SLEEVE AND RENEW GASKET. (Service cost)
REPLACE FREON DUMPING SYSTEM GOOSENECK FROM SLEEVE AND RENEW GASKET. (Material cost)
REPLACE AND REFIT GAS SYSTEM VALVES FOR ALL AC'S (Service cost)
REPLACE AND REFIT GAS SYSTEM VALVES FOR ALL AC'S (Material cost)
REFIT SEA WATER INLET/OUTLET VALVES. REPLACE IF DEFECTIVE FOR ALL AC'S (Service cost)
REFIT SEA WATER INLET/OUTLET VALVES. REPLACE IF DEFECTIVE FOR ALL AC'S (Material cost)
REPLACE HERMETICALLY SEALED COMPRESSOR UNITS VIEW DEFECTIVE AND UNDERTAKE TRIALS (Service cost)
REPLACE HERMETICALLY SEALED COMPRESSOR UNITS VIEW DEFECTIVE AND UNDERTAKE TRIALS (Material cost)
AC PLANT NOT TRIPPING DURING PROTECTION CHECKS. REPLACE AND UNDERTAKE CALIBRATION CHECKS OF CUTOUTS (A) LP CUT OUT (B) TEMP CUTOUT (C) HP CUTOUT, RANGE 270 PSI. (Service cost)
AC PLANT NOT TRIPPING DURING PROTECTION CHECKS. REPLACE AND UNDERTAKE CALIBRATION CHECKS OF CUTOUTS (A) LP CUT OUT (B) TEMP CUTOUT (C) HP CUTOUT, RANGE 270 PSI. (Material cost)
PROVISION REMOTE STARTING FROM MCR OF ALL ACs. (Service cost)
PROVISION REMOTE STARTING FROM MCR OF ALL ACs. (Material cost)
MARINISED AC - WHEEL HOUSE, CHART ROOM, OPS ROOM AND LYNX BARBETTE
MARINISED AC WHEEL HOUSE, CHART ROOM, OPS ROOM AND LYNX BARBETTE INSSTALL NEW MARININSED ACs ALONG WITH ASSOCIATED SYSTEM SW PIPES, VALVELS IN OPS ROOM, WHEEL HOUSE, CHART ROOM AND LYNX BARBETTE. (QTY - 04 NO, CAPACITY - 02 TR, MAKE - VOLTAS EQUIVALENT) (Service cost)
MARINISED AC WHEEL HOUSE, CHART ROOM, OPS ROOM AND LYNX BARBETTE INSSTALL NEW MARININSED ACs ALONG WITH ASSOCIATED SYSTEM SW PIPES, VALVELS IN OPS ROOM, WHEEL HOUSE, CHART ROOM AND LYNX BARBETTE. (QTY - 04 NO, CAPACITY - 02 TR, MAKE - VOLTAS EQUIVALENT) (Material cost)
Scope 2 - Turnkey Job of HVAC - (RM.0789)
VENTILATION SYSTEM - VARIOUS PLACES UNDERTAKE FOLLOWING ON VENTILATION
CARRYOUT CHEMICAL CLEANING OF INTERNAL SURFACES OF ALL TRUNKINGS. (300 MTR) (MAT - AL/GI SHEET, 22 GUAGE) (DIA - 12 INCH X 18 INCH) (Service cost)
CARRYOUT CHEMICAL CLEANING OF INTERNAL SURFACES OF ALL TRUNKINGS. (300 MTR) (MAT - AL/GI SHEET, 22 GUAGE) (DIA - 12 INCH X 18 INCH) (Material cost)
REPLCE GREASE FILTERS INSIDE EXHAUST TRUNKING (Service cost)
REPLCE GREASE FILTERS INSIDE EXHAUST TRUNKING (Material cost)
REPLACE(WITH NEW) AIR FILTER ELEMENTS / PADS. (Service cost)
REPLACE(WITH NEW) AIR FILTER ELEMENTS / PADS. (Material cost)
SURVEY, RENEW DAMAGED TRUNCKING WITH FIRST CONNECTIONS AND INTERCONNECTING CANVAS CANOPY AS PER SAMPLE (150 MTR, MAT - AL SHEET, DIA 12 INCH X 18 INCH) CANOPY MAT - CANVAS (Service cost)
SURVEY, RENEW DAMAGED TRUNCKING WITH FIRST CONNECTIONS AND INTERCONNECTING CANVAS CANOPY AS PER SAMPLE (150 MTR, MAT - AL SHEET, DIA 12 INCH X 18 INCH) CANOPY MAT - CANVAS (Material cost)
CARRYOUT TRIALS OF A/C & VENTILATION SYSTEM TO ENSURE SATISFACTORY PERFORMANCE NOTE: PRE-REFIT TRIALS TO BE PROPOSED / CONDUCTED PRIOR TO START OF REFIT TO ASCERTAIN THE PERFORMANCE OF SYSTEM. PRE AND POST REFIT TRIALS TO BE WITNESSED BY HITU. (Service cost)
CARRYOUT TRIALS OF A/C & VENTILATION SYSTEM TO ENSURE SATISFACTORY PERFORMANCE NOTE: PRE-REFIT TRIALS TO BE PROPOSED / CONDUCTED PRIOR TO START OF REFIT TO ASCERTAIN THE PERFORMANCE OF SYSTEM. PRE AND POST REFIT TRIALS TO BE WITNESSED BY HITU. (Material cost)
PREWETTING SYSTEM - VARIOUS PLACES
OVERHAUL, STRIP AND REFIT STATION SCHEMATIC SECTION SYSTEM AND ASSOCIATED VALVES. (Service cost)
OVERHAUL, STRIP AND REFIT STATION SCHEMATIC SECTION SYSTEM AND ASSOCIATED VALVES. (Material cost)
RENEW NOZZLE AND ADJUSTABLE PLUGS. ENSURE THAT PARONITE GASKETS OR AS PER OEM TECHINAL MANUAL ARE FITTED (QTY - 100 NO, MAT - BRASS, SIZE- 30MM) (Service cost)
RENEW NOZZLE AND ADJUSTABLE PLUGS. ENSURE THAT PARONITE GASKETS OR AS PER OEM TECHINAL MANUAL ARE FITTED (QTY - 100 NO, MAT - BRASS, SIZE- 30MM) (Material cost)
RENEW AND REFIT ALL DECK TELESCOPIC SPRINKLER HEADS. (QTY - 20 NO) (Service cost)
RENEW AND REFIT ALL DECK TELESCOPIC SPRINKLER HEADS. (QTY - 20 NO) (Material cost)
NOTE: I) TEST PIPE LINES HYDRAULICALLY AT A PRESSURE OF 10 KG/SQ.CM. II) INSPECT PROTECTIVE VALVES BY PRESSURE 16 KG/SQ.CM (FOR DEEPAK DESIGN PRESSURE - 13 BAR AND WORKING PRESSURE - 10 BAR). Pipe size - 20 mm, length -100 mtrs approx, Valves(screw down) qty 02, nozzles - 40 approx. (Service cost)
NOTE: I) TEST PIPE LINES HYDRAULICALLY AT A PRESSURE OF 10 KG/SQ.CM. II) INSPECT PROTECTIVE VALVES BY PRESSURE 16 KG/SQ.CM (FOR DEEPAK DESIGN PRESSURE - 13 BAR AND WORKING PRESSURE - 10 BAR). Pipe size - 20 mm, length -100 mtrs approx, Valves(screw down) qty 02, nozzles - 40 approx. (Material cost)
A/C CONDENSATE SYSTEM - VARIOUS PLACES UNDERTAKE ROUTINES OF AC CONDENSATE SYSTEM AS FOLLOWS: -
REPLACE AND RESET SAFETY VALVES. (Service cost)
REPLACE AND RESET SAFETY VALVES. (Material cost)
OVERHAUL AND REFIT ALL OF SYSTEM VALVES. (Service cost)
OVERHAUL AND REFIT ALL OF SYSTEM VALVES. (Material cost)
REPLACE AND CALIBRATE PRESSURE GAUGES (SUCTION AND DISCHARGE QTY 07) VIEW GAUGE MALFUNCTIONING. (Service cost)
REPLACE AND CALIBRATE PRESSURE GAUGES (SUCTION AND DISCHARGE QTY 07) VIEW GAUGE MALFUNCTIONING. (Material cost)
RENEW, REPAINT COATING OF AC CONDENSATE TANK (Service cost)
RENEW, REPAINT COATING OF AC CONDENSATE TANK (Material cost)
UNDERTAKE DR, OVERHAUL AND PROVE REMOTE OPERATION OF CONDENSATE PUMP (Service cost)
UNDERTAKE DR, OVERHAUL AND PROVE REMOTE OPERATION OF CONDENSATE PUMP (Material cost)
AUTO CUT IN / CUT OUT DFECTIVE. TO BE REFURBISHED BY REPLACING LEVEL SENSORS, CABLING ETC. OFFER TRIALS OF SYSTEM (Service cost)
AUTO CUT IN / CUT OUT DFECTIVE. TO BE REFURBISHED BY REPLACING LEVEL SENSORS, CABLING ETC. OFFER TRIALS OF SYSTEM (Material cost)
UNDERTAKE OVERHAUL/ ROUTINES ON ALL 07 PACKAGE Acs AS FOLLOWS (MAKE VOLTAS, CAPACITY - 4 TR) : -
REMOVE PACKAGE AC UNIT FOR COMPLETE OVERHAUL. GAUGE PARTS. RENEW PARTS AS NECESSARY. REPLACE IF DEFECTIVE FOR ALL AC'S (Service cost)
REMOVE PACKAGE AC UNIT FOR COMPLETE OVERHAUL. GAUGE PARTS. RENEW PARTS AS NECESSARY. REPLACE IF DEFECTIVE FOR ALL AC'S (Material cost)
REPLACE AND CALIBRATE ALL PRESSURE AND TEMPERATURE GAUGES.(QTY-07 EACH) VIEW MALFUNCTIONING. (Service cost)
REPLACE AND CALIBRATE ALL PRESSURE AND TEMPERATURE GAUGES.(QTY-07 EACH) VIEW MALFUNCTIONING. (Material cost)
REPLACE AND CALIBRATE EXPANSION VALVE. (Service cost)
REPLACE AND CALIBRATE EXPANSION VALVE. (Material cost)
UNDERTAKE RENEWAL, CHEMICAL CLEANING AND PRESSURE TEST EVAPORATORS AND CONDESORS VIEW EXISTING ITEMS CORRODED AND LEAKING. (Service cost)
UNDERTAKE RENEWAL, CHEMICAL CLEANING AND PRESSURE TEST EVAPORATORS AND CONDESORS VIEW EXISTING ITEMS CORRODED AND LEAKING. (Material cost)
REPLACE FREON DUMPING SYSTEM GOOSENECK FROM SLEEVE AND RENEW GASKET. (Service cost)
REPLACE FREON DUMPING SYSTEM GOOSENECK FROM SLEEVE AND RENEW GASKET. (Material cost)
REPLACE AND REFIT GAS SYSTEM VALVES FOR ALL AC'S (Service cost)
REPLACE AND REFIT GAS SYSTEM VALVES FOR ALL AC'S (Material cost)
REFIT SEA WATER INLET/OUTLET VALVES. REPLACE IF DEFECTIVE FOR ALL AC'S (Service cost)
REFIT SEA WATER INLET/OUTLET VALVES. REPLACE IF DEFECTIVE FOR ALL AC'S (Material cost)
REPLACE HERMETICALLY SEALED COMPRESSOR UNITS VIEW DEFECTIVE AND UNDERTAKE TRIALS (Service cost)
REPLACE HERMETICALLY SEALED COMPRESSOR UNITS VIEW DEFECTIVE AND UNDERTAKE TRIALS (Material cost)
AC PLANT NOT TRIPPING DURING PROTECTION CHECKS. REPLACE AND UNDERTAKE CALIBRATION CHECKS OF CUTOUTS (A) LP CUT OUT (B) TEMP CUTOUT (C) HP CUTOUT, RANGE 270 PSI. (Service cost)
AC PLANT NOT TRIPPING DURING PROTECTION CHECKS. REPLACE AND UNDERTAKE CALIBRATION CHECKS OF CUTOUTS (A) LP CUT OUT (B) TEMP CUTOUT (C) HP CUTOUT, RANGE 270 PSI. (Material cost)
REMOTE STARTING FROM MCR OF ALL AC IN VIEW OF NEW AC NOT HAVE PROVISION. (Service cost)
REMOTE STARTING FROM MCR OF ALL AC IN VIEW OF NEW AC NOT HAVE PROVISION. (Material cost)
MARINISED AC WHEEL HOUSE, CHART ROOM, OPS ROOM AND LYNX BARBETTE
MARINISED AC WHEEL HOUSE, CHART ROOM, OPS ROOM AND LYNX BARBETTE INSTALL NEW MARININSED ACs ALONG WITH ASSOCIATED SYSTEM SW PIPES, VALVELS IN OPS ROOM, WHEEL HOUSE, CHART ROOM AND LYNX BARBETTE. (QTY - 04 NO, CAPACITY - 02 TR, MAKE - VOLTAS EQUIVALLENT) (Service cost)
MARINISED AC WHEEL HOUSE, CHART ROOM, OPS ROOM AND LYNX BARBETTE INSTALL NEW MARININSED ACs ALONG WITH ASSOCIATED SYSTEM SW PIPES, VALVELS IN OPS ROOM, WHEEL HOUSE, CHART ROOM AND LYNX BARBETTE. (QTY - 04 NO, CAPACITY - 02 TR, MAKE - VOLTAS EQUIVALLENT) (Material cost)
UBS REFRIGERATION COMPANY
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .