Tender Value
₹66.9 L
EMD Value
₹67,000
Closing Date
7 Aug 2026, 6:00 pmClosed
Executive Engineer, R&B Division, Bhuj
Structural Repair Work for River Bridge on Pandhro - Narayan Sarovar Road Ch. 28/600 To 28/800
329517
34 For 2026-27
Open
Repair and Maintenance
Works
Kutch
10 documents required · 10 mandatory
₹2,400
Executive Engineer, R and B Division, Bhuj
₹67,000
31 Jul 2026
31 Jul 2026
31 Jul 2026
7 Aug 2026
31 Jul 2026
Name of work :-
Structural Repair Work for River Bridge on Pandhro - Narayan Sarovar Road
Bill of Quantity
Memorandum showing items of works to be carried out.
It. Qty. Item of work Estimated Rates Unit Total amount according
It. Qty. Item of work Estimated Rates Unit Total amount according
No. Estimated In Figures In Words
to estimated Quantities
1 0.12 Clearing and grubbing road land 28455.09 Rupees Twenty Hectares
including uprooting rank Eight
vegetation, grass bushes, shrubs, Thousand Four
sapling and trees girth up to 300 Hundred Fifty
mm removal of stumps of trees cut Five And Paise
earlier and disposal of Nine Only
unserviceable materials (C) By
mechanical means in area of light
2 292.50 Scaffolding: - Providing, erecting 460.56 Rupees Four Sqm
and dismantling safe H frame and Hundred Sixty
/ pipe scaffolding including And Paise Fifty
working platform for external area Six Only
of bridge pier to facilitate all works
etc. completed, Measurement for
payment shall be considered as per
detailed specification. (Property of
contractor, and repetitions will be
paid per pier) A) up to 10.0 mt
3 495.00 Shuttering: Providing, erecting and 890.82 Rupees Eight Sqm
removing proper, safe and leak Hundred
proof shuttering using Plywood, Ninety And
steel plate to facilitate any type of Paise Eighty
concrete repair work etc. as Two Only
directed by Engineer in charge.
4 157.78 Excavation for foundation in sand, 511.11 Rupees Five Cum
gravel, clay soft soils and murrum Hundred
etc. including shoring, strutting Eleven And
dewatering as necessary and Paise Eleven
disposing of the excavated stuff as Only
directed.(A) Depth upto 3.0 M. and
lead upto 100m for 10 Cuml (for
Pier Jacketing Purposes & Boulder
It. Qty. Item of work Estimated Rates Unit Total amount according
It. Qty. Item of work Estimated Rates Unit Total amount according
No. Estimated to estimated Quantities
but may be In Figures In Words
5 210.38 Boulder apron laid in wire crates - 1477.63 Rupees One Cum
Providing and laying of boulder Thousand Four
apron laid in wire crates made with Hundred
4mm dia GI wire conforming to IS: Seventy Seven
280 & IS:4826 in 100mm x 100mm And Paise Sixty
mesh (weaved diagonally) including Three Only
10% extra for laps and joints laid
with stone boulders weighing not
less than 40 kg each. - around
6 213.00 Rust Removal & Steel Protection:- 838.30 Rupees Eight Sqm
Cleaning as directed & specified all Hundred Thirty
corrosion / rust / scales from Eight And
reinforcement bars using rust Paise Thirty
remover Reebaklens RR of Fosroc Only
make or Rust clean of BASF or
equivalent of leaving to dry for
mins & washing surface with fresh
water as required to exposed
reinforcement bars complete as
specified also providing & applying
inhibition coats/system to exposed
reinforcement bars after drying &
also new bars after cleaning &
removing scales and rust
completely as specified. Two
component inhibitors Concresive
ZRI equivalent material of BASF
make as approved by engineer shall
be used as per manufacturers
specification in two coats including
all labour tools tackles, necessary
surface preparation & necessary
protection after & during repair
7 213.00 Epoxy bonding agent of new 548.43 Rupees Five Sqm
concrete to old concrete. The Hundred Forty
applied bond agent should possess Eight And
min properties as below: Shear Paise Forty
Strength - @ 7 days 20N/mm2 Three Only
Flexural Strength - @ 7 days
N/mm2 Compressive Strength - @
7 days 50N/mm2 (The new repair
mortar/concrete should be applied
within overlay time of epoxy
bonding agent mentioned as per
manufacturer's datasheets)
It. Qty. Item of work Estimated Rates Unit Total amount according
It. Qty. Item of work Estimated Rates Unit Total amount according
No. Estimated to estimated Quantities
but may be In Figures In Words
8 232.00 Patching of damaged concrete 2177.78 Rupees Two Sqm
surface with polymer concrete and Thousand One
curing compounds, intiator and Hundred
promoter, available in present Seventy Seven
formulations, to be applied as per And Paise
instructions of manufacturer and Seventy Eight
as approved by the engineer. Only
9 855.00 Providing and inserting nipples 541.36 Rupees Five Each
with approved fixing compound Hundred Forty
after drilling holes for grouting as One And Paise
per Technical specifications Thirty Six Only
including subsequent
cutting/removal and sealing of the
hole as necessary of nipples after
completion of grouting with
10 1923.75 Sealing of cracks/porous concrete 794.87 Rupees Seven Kg.
by injection process through Hundred
nipples/Grouting complete as per Ninety Four
Technical specification. And Paise
11 240.00 Carbon Fiber Laminates for 3941.02 Only
Rupees Three Rmt
structural strengthening - Thousand Nine
Providing and applying 5mm thick Hundred Forty
and 105 mm wide Carbon Fiber One And Paise
Pultruded Laminate strips Two Only
RELinforce C Lam 105/5 of RIL
make or equivalent to the prepared
substrate using thixotropic epoxy
adhesive. The FRP laminate used
shall be of zero degree
unidirectional fibres having (1)
Volumetric fiber content of >65%
(2) Tensile strength of 1500 MPa (3)
Tensile modulus of 160 GPa. (4)
Compressive strain to failure %
shall be 0.8. The thixotropic epoxy
bonding adhesive shall be applied
at 2-3 mm thickness for adhering
the laminate to the substrate.
(1) The adhesion of the entire
system (Laminate and adhesive
combined) with concrete shall be >
1.5 - 2 MPa with concrete failure as
per ASTM D 4541. (2) The adhesive
used shall have tensile modulus >
4100 Mpa (ASTM D638) (3) Tensile
Strength > 50 MPa (ASTM D790).
Note : Surface to be rendered using
epoxy putty like RELinforce EP
12 34.00 Providing G.I. 100mm diameter 536.03 Rupees Five Each
waterspouts including necessary Hundred Thirty
iron gratings as per drawings. Six And Paise
It. Qty. Item of work Estimated Rates Unit Total amount according
It. Qty. Item of work Estimated Rates Unit Total amount according
No. Estimated to estimated Quantities
but may be In Figures In Words
13 173.25 Providing and casting in situ- 5746.90 Rupees Five Cum
controlled cement concrete M-300 Thousand
for RCC Jacketing around Piers as Seven Hundred
per drawings including where Forty Six And
necessary, laying vibrating, curing Paise Ninety
and finishing complete. (B) Height Only
from 0.0 to 10.0 M. (1) Piers (2)
14 5.20 Providing and laying in position FE 73858.69 Rupees MT
550D TMT bar reinforcement Seventy Three
including cutting, bending, hooking Thousand
and tying complete as per detailed Eight Hundred
drawings for the following. (A) Piers Fifty Eight And
(B) Abutments (C) R.C.C. Returns Paise Sixty
(for Pier Jacketing Purposes) Nine Only
15 240.00 Shear connectors:- Drilling holes 367.64 Rupees Three Nos
into existing concrete substrate for Hundred Sixty
anchoring of new anchoring rebars Seven And
with 12/16 mm dia shear Paise Sixty
connectors at 1.5 m c/c as per Four Only
drawing and for additional rebar
provision in repair area and fixing
with chemical anchor lokfix of
Fosroc make / Master flow 935 of
BASF make / Hilti Hy200 /
Fischer. Drilling hole diameter:
mm larger to rebar dia drilling
depth: min 10 times the rebar dia
including cleaning, cutting,
fabricating, chemical, tools, tackles
etc. completed as directed by EIC..
Material: - chemical anchor lokfix
E77 of Fosroc make / Master flow
935 of BASF make / Hilti Hy200 /
Fischer or equivalent. (a) 12mm
It. Qty. Item of work Estimated Rates Unit Total amount according
It. Qty. Item of work Estimated Rates Unit Total amount according
No. Estimated to estimated Quantities
but may be In Figures In Words
16 240.00 Shear connectors:- Drilling holes 550.45 Rupees Five Nos
into existing concrete substrate for Hundred Fifty
anchoring of new anchoring rebars And Paise
with 12/16 mm dia shear Forty Five Only
connectors at 1.5 m c/c as per
drawing and for additional rebar
provision in repair area and fixing
with chemical anchor lokfix of
Fosroc make / Master flow 935 of
BASF make / Hilti Hy200 /
Fischer. Drilling hole diameter:
mm larger to rebar dia drilling
depth: min 10 times the rebar dia
including cleaning, cutting,
fabricating, chemical, tools, tackles
etc. completed as directed by EIC..
Material: - chemical anchor lokfix
E77 of Fosroc make / Master flow
935 of BASF make / Hilti Hy200 /
Fischer or equivalent. (c) 16mm
17 1484.00 Painting Two Coats on New 88.20 Rupees Eighty Sqm
Concrete Surfaces (Painting two Eight And
coats after filling the surface with Paise Twenty
synthetic enamel paint in all Only
shades on new plastered concrete
18 15.59 Providing fusion bonded 10162.62 Rupees Ten MT
Epoxy coating not less than Thousand One
175 micron thickness and up to Hundred Sixty
300 micron to reinforcement Two And Paise
bars as per IS-13620- Sixty Two Only
1993/ASTM-775 M
including testing of coating at
plant and all taxes. (A) 10mm to
19 96.00 Supplying and fixing cat eye 375.72 Rupees Three Nos
(Stimsonite) made out from Acrilo Hundred
beautile sterine injuction high Seventy Five
compressed molding with reflector And Paise
made of MMC (prismatic type of Seventy Two
size 12cm x 6cm x 2.5cm) provided Only
with bituminous adhesive 100g.
with each unit for fixing. (High
Intensity grade)
It. Qty. Item of work Estimated Rates Unit Total amount according
It. Qty. Item of work Estimated Rates Unit Total amount according
No. Estimated to estimated Quantities
but may be In Figures In Words
20 4.00 Hazard Marker Sign :-Providing and 3666.30 Rupees Three Nos
fixing sign boards made out of 2.0 Thousand Six
mm aluminium sheet/4 mm ACP Hundred Sixty
(Aluminium composite Panel); size Six And Paise
90x30 cms. Rectangular as per Thirty Only
design of IRC-67-2012.Pre treated
with phosphating process & acid
etching coated with one coat of
epoxy primer and two coats of best
quality epoxy paint; reflectorised
with Micro Prismatic Grade retro
reflective sheeting of Type-11 as per
ASTM D-4956 and latest M.O.S.T.
Specifications;1.8mtr long stand
post of 75 x 75 x 6mm/65NB
Circular MS Pipe as required and
frame fabricated from suitable size
iron angle of 35 x 35 x 3 mm;
painted with best quality epoxy
coatings in black and white bends.
The details of symbol foreach board
shall be as per the instruction of
engineer in charge. The fixing at
site shall be in 1:2:4 CC block of
size 45 x 45 x 60 Cms. for each leg.
including excavation, curing etc.
complete under the supervision of
engineer in charge. A warranty for
10 years for the Retro reflective
It. Qty. Item of work Estimated Rates Unit Total amount according
It. Qty. Item of work Estimated Rates Unit Total amount according
No. Estimated to estimated Quantities
but may be In Figures In Words
21 4.00 Cautionary Warning Sign :- 5077.27 Rupees Five Nos
Providing and fixing sign boards Thousand
made out of 2mm aluminium sheet Seventy Seven
/ 4mm ACP (Aluminium composite And Paise
Panel); size 90 x 90 x 90cms. Twenty Seven
equilateral triangle as per design of Only
IRC-67-2012. Pre treated with
phosphating process & acid
etching; coated with one coat of
epoxy primer and two coats of best
quality epoxy paint ;reflectorized
with Micro Prismatic Grade retro
reflective sheeting of Type-11 as per
ASTM D-4956 and latest M.O.S.T.
Specifications; 3.6mtr long stand
post of 75 x 75 x 6mm / 65NB
Circular MS Pipe as required and
frame fabricated from suitable size
iron angle of 35 x 35 x 3mm;
painted with best quality epoxy
coatings in black and white bends.
The details of symbol for each
board shall be as per the
instruction of engineer in charge.
The fixing at site shall be in 1:2:4
CC block of size 45 x 45 x 60 Cms.
for each leg. including excavation,
curing etc. complete under the
supervision of engineer in charge. A
Rupees Sixty Six Lakh(s) Eighty Seven Thousand Six Hundred Ninety Seven And Paise Ninety
*Estimated amount *Estimated amount
Put to tender Rs……………………… Put to tender Rs………………………
Deduct : ………% below Add : ………% above
Net Rs……………………… Net Rs………………………
In words ……………………………… In words ………………………………
*(please strike out whichever is not applicable)
Note-1 All works shall be carried out as per Public Works Department Handbook and other specifications of
Division or as directed.
Note-3 Rates quoted include clearance of site (prior commencement of work and its close) in all respects and
hold good for work under all conditions, site, moisture, weather etc.
Note-5 Testing Charges for the quality of material shall be recovered as per SBD
Note-8 pnMU VG[ BF6 lJEFU4 ;lRJF,I4 UF\WLGUZGF 9ZFJ S|DF\So V[DPV[DPVFZPv !!Z___vZ_!#vK4 TFP!q)qZ__$ YL
ZFHI ;ZSFZGF AF\WSFD DF8[ J5ZFTF UF{6vBlGHGL ZMI<8L ;FNL DF8L VG[ ;MO8 DMZD 5Z ZMI<8L ,FU] 50X[P
Note-9 Labour Cess shall be recovered as per SBD
Note-10 Quantity of items may reduce or increase as per work execution.
Note-11 p5ZMST SFD SM.56 SFZ6;Z D\H]Z q GFD\H]Z SZJFGL ;œF ;CL SZGFZ VlWSFZLGL VAFlWT ZC[X[P
It. Qty. Item of work Estimated Rates Unit Total amount according
It. Qty. Item of work Estimated Rates Unit Total amount according
No. Estimated to estimated Quantities
but may be In Figures In Words
Note-13 In RCC items where there is change of grade mix or change as per actual mix design the difference of
cement consumption shall be deducted from rate of original item at the rate of star rate mentioned in
tender. However for Increase in quantity of cement no additional payment shall be made.
Note-14 For earthquake resistance provision the work shall be carried out as per the instruction of Engineer in-
Note-16 CM8DL1F %,Fg8 VG[ 5[JZYL YTF 0FDZGF SFDM AFAT[ ;ZSFZzLGF DFP VG[ DP lJEFU4 UF\WLGUZGF 5lZ5+
G\PV[;V[RVFZq!5(&qVF.ALq!*)s&fv;4 TFPZ_q!q_* VG[ 5ZL5+ S|DF\SP5ZRq!_qZ_!5q55q;L4 TFP_$q!!q!5
D]HA VG];ZJFG]\ ZC[X[P
Note-17 U]HZFT ;ZSFZzLGF DFPDPlJEFUGF 5lZ5+ S|DF\So VFZHLV[Gq&_Z__&qs#5fv; YL NFB, YI[, XZTMP
1) 5_DLDLYL JW] 0FDZ SFDGL ;\I]ST HF0F. sALPV[;PHLP4 ALPALPV[DP l;JFIf CMI T[JF Z:TFGF SFDDF\ NZ Z5_DLP NL9
V[S S|M; ;[SXG 5Z 0FDZSFDGL 5CM/F. VG];FZ A[ YL RFZ SMZ ;[d5, .HFZNFZ[ 5MTFGF SMZ S8L\U DXLG J0[ ;\A\lWT
GFIA SFI"5F,S .HG[ZzLGL CFHZLDF\ D[/JL VF5JFGF ZC[X[ VG[ VF ;[d5, ;L, SZL DFgI ,[AMZ[8ZL DFZOT YLSG[;4
0[g;L8L TYF AL8]DLG; Sg8[\8GF 5lZ1F6 SZFJL 5lZ6FD[ D[/JJFGF ZC[X[P ;\TMQFSFZS 5lZ6FDM VFjIF ;]WL 0FDZ SFDGL
R]SJJF5F+ ZSDGF 5@ ZSD JLYC[<0 ZFBJFDF\ VFJX[4 H[ ZSD ;\TMQFSFZS 5lZ6FDM D?IF AFN H K]8L SZFX[P 5Z\T]
;\TMQFSFZS 5lZ6FDM GlC\ D[/JJFGF lS:;FVMDF\ SZFZGL VgI XZTM VG];FZ SFI"JFCL Y. XSX[P
2) ~FP!__ ,FB S[ T[YL JW] ZSDGF SZFZ C[9/GF SFD 5Z .HFZNFZ[ O],8F.D SJM,LOF.0 V[gHLGLIZ lGI]ST SZJFGM ZC[X[ H[
V\U[ SFDGF JS"VM0"Z D?I[ lNGv!5 DF\ SFI"5F,S .HG[ZzLGL HF6 C[9/4 GFIA SFI"5F,S .HG[ZzLG[ lGO]S .HG[ZGF GFD4
SJM,LOLS[XG4 DFS"XL84 ;8L"OLS[84 S,Z OM8MU|FO4 lGI]lSTGF C]SD JU[Z[ lJUT ZH] SZJFGL ZC[X[ TYF SFD 5Z CFHZ YIF
V\U[GM ZL5M8" VF5JFGM ZC[X[4 H[ VG];FZ SZFZ C[9/GF SFD 5Z SJM,LOF.0 .HG[ZGL p5ZMST XZT D]HA lGI]lST YFI
TYF :Y/ 5Z BZ[BZ SFDULZL G ;\EF/[ tIF\ ;]WLGF ;DIUF/F T[DH SFD RF,] ZC[ T[ ;DI NZdIFG lGI]S SZ[, .HG[Z
SFDULZL ;\EF/X[ GlC\ T[ ;DIUF/F DF8[ ~FP!54___qv 5|lTDF; ,[B[ lA,DF\YL S5FT SZJFDF\ VFJX4 H[ GMG ZLO\0[A,
Signature of Contractor Executive Engineer
R&B Division, Bhuj
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Additional Instructions.pdf
Bridge Booklet(1).pdf
Bridge Booklet(2).pdf
BOQ.pdf
Detailed Specifications.pdf
GR.pdf
SBD Book.pdf
ROAD WORK Booklet - 1.pdf
ROAD WORK Booklet - 2.pdf
Spe. Index.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .