Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.4 CrAccepted-AOC | ₹21.4 Cr | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹24.2 CrRejected-AOC XI 769 BETHAL PADAMUGAL KAKKANAD THRIKKAKARA ERNAKULAM | KAKKANAD | ERNAKULAM | KERALA | ₹24.2 Cr | L2 | Rejected-AOC L2 bidder |
| 3 | L3₹24.4 CrRejected-AOC | ₹24.4 Cr | L3 | Rejected-AOC L3 bidder |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not qualified as per PQ criteria |
Tender Value
₹22.8 Cr
EMD Value
₹5 L
Closing Date
25 Jul 2024, 5:00 pmClosed
CEO Technopark
Park Centre building, Technopark Phase 1 Campus
Civil works for the Design, Supply, Fabrication and Erection of Prefabricated structure for IT Office building
2023_ETPK_629481_2
ETPK/PH1/180/2023-24
Open Tender
Civil Works - Buildings
210 days
Technopark Phase 1 Campus
As mentioned in Bid1 document
7 documents required · 7 mandatory
₹17,700
₹5 L
Park Centre building, Technopark Phase 1 Campus
23 Nov 2024
15 Jun 2024
26 Jul 2024
16 Jun 2024
25 Jul 2024
28 Jun 2024
28 Jun 2024
Amount
CIVIL WORKS FOR THE DESIGN, SUPPLY, FABRICATION AND ERECTION OF PREFABRICATED STRUCTURE FOR IT OFFICE BUILDING (as per the scope of work, Tender specifications and technical specifications etc as mentioned under this tender docuent with a minimum builtup area of 50,000.00 sqft which includes the following): Site preparatory works: Includes all works such as Clearing jungle including uprooting of rank vegetation, grass etc. felling trees of girth varying from 30cm and beyond 240cm for clearing the worksite, making the ground suitable for foundation works. RCC Substructure works: Includes all works such as Setting out the building, setbacks, footing points etc. Earth work in excavation by mechanical/ manual means over areas/ foundation trenches/ surface excavation for the proposed foundation as per the structural designs. Banking excavated earth in layers if required. RCC works for foundation and plinth beams including base PCC, shuttering, reinforcement steel works etc. Filling with available excavated earth and/or contractor's own earth (excluding rock) in trenches, plinth, sides & inside of foundations, in the balance work site for achieving the desired FGL etc. Providing damp proof course and pre-constructional anti termite treament etc. Works upto and including a height of topmost roof slab including stair head room: Includes all works such as Structural steel works: Fabrication, supply and erection of structural steel members such as main columns, all primary beams, secondary members, joint connections, stiffners, deck sheet roofing, canopy etc. and cladding as per the approved structural design and drawings. RCC and Masonry works: All RCC and masonry works necessary for toilet blocks, lift shafts, service ducts etc which includes PCC, RCC, shuttering, steel reinforcement works, blockwork and plastering. Flooring, Finishing, Roofing and Joinery works: Includes all works such as all Flooring works, Finishing works such as internal and external painting, wherever applicable, including primer, putty works, wall cladding, texture painting etc. Roofing works including waterproofing etc. All joinery works including fabrication, supply, installation and fixing of doors, windows, ventilators, fixed glazing etc. Structural glazing/ Curtain Wall with Aluminium Composite Panel Cladding. Providing Access roads, drainage and landscaping works: Includes all works such as Providing access roads with required gradient, provision for parking area as per norms, constructing drainage system for proper disposal of storm and waste water, provision for cable trenches, landscaping works etc. The rate is inclusive of the entire scope of works covered under the milestones mentioned in the bid document. The rate is inclusive of all material charge, labour, transportation for all lead and lift, scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc, complete all as per the direction of engineer in charge.
FT INFRASTRUCTURES PRIVATE LIMITED
M/s Crescent Construction Company
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid