Loading…
Loading…
Tender Value
₹9.8 L
EMD Value
₹19,600
Closing Date
9 Oct 2026, 10:00 am5d left
EXECUTIVE ENGINEER HPPWD DIVISION SANGRAH
EXECUTIVE ENGINEER HPPWD DIVISION SANGRAH
R/R damages on Nahan Dadahu Haripurdhar road km.55/0 to 87/0 (SH C/O 900mm dia RCC hume Pipe culvert at RD 74/580,75/210,76/355,76/460,77/900, 78/520 and Unlined drain from Km. 71/00 to 79/00 in essential reaches)
2026_PWD_144797_4
SANGRAH 5258-83 DATED 30.09.2026-2
Open Tender
Civil Works
Percentage
90 days
SANGRAH
Please refer Tender documents.
10 documents required · 10 mandatory
₹350
₹19,600
1 Oct 2026
1 Oct 2026
9 Oct 2026
1 Oct 2026
9 Oct 2026
1 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excatation in soil in hilly area in all depths using manual means as per drawing and technical specification ministry of Rural Development for rural roads August 2004 (Two thousands four) clause 305.1 (three hundred five point one) including setting out, coustruction of shoring and bracing, removal of stumps and other deleterious materials including dressing of sides and bottom and back filling in trenches with excavated suitable materials and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials by all modes of transportations in all leads and lifts at specified places in specified manner, systematically with level consideration to avoiding a diverse effects on environment, trimming filling of uneverness blind age and finishing of the road to specified dimension or as directed by the Engineer-in-charge. any loss to the public or private property during the course of excavation shall be the whole responsibility of the contractor which shall have to be duly compensated by him at his on cost in all cases including haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge. | 5.52 | Per cum | 330.3 | ₹1,823.26 |
| 2 | Excavation in foundation,trenches etc. in earth work in all heights and depths in all kinds of soil, including saturated soil comprising of pick work,jumper work and blasting work both in soft and hard rock with chiselling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soil including dewatering where ever required,setting out to required lines,levels as shown on the drawings and as directed by the Engineer-in-Charge at site, according to the HPPWD specification of 1990-Volume-I, and shorting out useful and un-useful materials and stacking the same in all leads,lifts and transportations of the usefull materials for filling in roadways embankments for grades improvements and levelling to required grades and then disposing of surplus excavated earth in acquired width of road on or approved dumping sites through all modes of transpsportation including head load animal load or mechanical means alongwith its levelling fine dressing and all labour, mechnieries materials,tools,equipments and incidental necessary to complete the work by mechanized means and labouor(if any required).All useful materials such as stone single, aggregate and slates shall be sorted out and stacked along road side to the maximuim possible extends in all leads,lifts through all modes of transportation and all others incidental charges any loss to the public and private properities during the course of execution and disposal of serviceable and un-serviceable materials shall be the absolute responsibility of the contractors and shall have to be duly compensated by him in all respect including haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge. | 175.92 | Per cum | 486.4 | ₹85,567.49 |
| 3 | Providing concrete for plain/reinforced concerete in open foundation complete as per drawings and technical specification clause 802,803,1202 & 1203,PCC Grade CC 1:3.6. 40mm size (One Cement : Three Sand: Six Graded Stone Aggregate ) 40mm (Forty Milimetre) including haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge. | 24.06 | per cum | 5,055.5 | ₹1,21,635.33 |
| 4 | Providing concrete for plain/reinforced concerete in sub structure as perdrawings and technical specification clause 802,803,1202 & 1203,PCC Grade M-15,PCC 1:2.5:5.One Cement : Two Point Five Sand: Five Graded Stone Aggregate ) including haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge. | 76.2 | Per cum | 5,259.7 | ₹4,00,789.14 |
| 5 | Providing and laying reinforced cement concrete pipe NP2 as per design in single row,culverts on first class bedding of granular material in signle row including fixing collar with cement mortar 1:3 but excluding excavation protection works back filling concrete andasonry works in head walls and parapets clause 1106 RCC pipe NP2 900mm dia as per design. | 45 | Per Rmt | 3,110.8 | ₹1,39,986 |
| 6 | Providing and laying flooring laid over cement concrete bedding complete as per drawingspecification clause 1303.including haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge. | 5.88 | Per cum | 4,360.2 | ₹25,637.98 |
| 7 | Construction of unlined surface drain of average cross sectional area 0.40 square metre in soil to specified lines, grades, levels and dimensions excavated materials to be used in embankment with a lift upto 3 m and lead of 50m (Average leas 25m) as per technical specification clause 307. By Mech. means | 6,000 | Per Rmt | 34 | ₹2,04,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.55 MB
SBD.pdf
Tender Documents • 3.68 MB
BOQ_215463.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .