Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 102 JASMINE PLOT N0 15 SECTOR 44 SEAWOODS WEST 400706 THANE MAHARASHTRA 400706 | THANE | MAHARASHTRA | 400706 | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
25 Apr 2025, 11:00 amClosed
Manager SRC-OS
Hindustan Shipyard Limited Gandhigram SR Complex Visakhapatnam 530 005
Overhauling of Pumps at various locations on INS JAMUNA
2025_HSL_97195_1
20 / 22040 / 078 / Pumps / 2025-26
Open Limited
Miscellaneous Services
Service
30 days
HSL Visakhapatnam
Please refer Tender documents.
8 documents required · 8 mandatory
₹840
Yes
HSL
₹50,000
Yes
5 May 2025
18 Apr 2025
25 Apr 2025
18 Apr 2025
25 Apr 2025
18 Apr 2025
Amount
OVERHAULING TO BE CARRIED OUT ON TURNKEY BASIS.AS PER ANNEXUR: OVERHAULING OF VARIOUS PUMPS ON INS JAMUNA WO.N0:22040 DL NOS : 20004,20006,20006.03,20016,20016.03,20016.04,20026, 20026.01,20026.02,20031,20035,20071,20137,20180,20233,20239 20254,20266,20267,20268,20271,20273,20286,20301,20302.
OVERHAULING OF MAIN ENGINE S/BY FRESHWATER (F/W) PP, MAKE- M/s BE PUMP, MODEL -MA1022KKBC, MAINTOP- 45000.OVERHAULING TO BE CARRIED AS PER ANNEXURE -A
OVERHAULING OF REF CONDENSER PPs.REF CONDENSER PP, M/s SPX FLOW KGEC 16-3,
OVERHAUL FRESH WATER PUMP CAPACITY - 6.5 TPH MAKE - SPX FLOW, MODEL - KGEFC 16-3.OVERHAULING TO BE CARRIED OUT AS PER ANNEXURE-A
OVERHAULING OF MAIN ENGINE LUB OIL HAND PUMP AND SUBOPTIMAL PERFORMANCE HAS BEEN OBSERVED. HAND PUMP TO BE REPAIRED.SPARES REQUIRED FOR OVERHAULING TO BE ARRANGED BY VENDOR.
OVERHAUL BILGE PUMP AS PER ANNEXURE -A ATTACHED.BILGE PUMP CAPACITY - 6.5 TPH MAKE - SPX FLOW, MODEL - KGEFC 16-3.
HIGH ATTENUATION OBSERVED ON BOTH GB ST/BY LO PUMP MOUNTS, RENEWAL OF GEAR BOX SV MOUNT TO BE UNDERTAKEN.SV MOUNTS TO BE PROCURED OF MAKE : RESISTOFLEX.PROCUREMENT OF MOUNTS AND INSTALLATION IS UNDER VENDOR SCOPE.
OVERHAULING OF BOTH MAIN ENGINE LO STAND BY PUMP VIEW LOW DISCHARGE PRESSURE.OVERHAULING TO BE CARRIED OUT AS PER ANNEXURE-A ATTACHED.
RENEW SV MOUNTS OF FIRMAIN PUMP .SV MOUNTS MAKE : RESISTOFLEX,PROCURE AND FITMENT OF SV MOUNTS REQUIRED IS UNDER VENDOR SCOPE.
OVERHAULING OF MAIN ENGINE S/BY FRESH WATER PUMP MAKE- BE PUMPS, CAPACITY - 80 TPH.OVERHAULING TO BE CARRIED OUT AS PER ANNEXURE -A ATTACHED.
PERFORMANCE OF AC CONDECSER PUMP 1, OBSERVED SUBOPTIMAL, PUMP TO BE OVERHAULED AND PERFORMANCE TRIALS TO BE UNDERTAKEN.OVERHAULING TO BE DONE AS PER ANNEXURE-A.CAPACITY : 20TPH
RENEWAL OF IMPELLER FOR FIRE MAIN PUMPS.SCOPE INVOLVES IMPELLER TO BE DIE CASTED,MACHINED AND DYNAMIC BALANCING TO BE CARRIED OUT UNDER VENDOR SCOPE.MAT :BRASS/BRONZE.
OVERHAULING OF STANDBY GEAR BOX LUB OIL PUMP. (MAINTOP- 31200). , MAKE - GEW, MODEL MV 2/35, CAPACITY - 10 TPH.OVERHAULING TO BE CARRIED OUT AS PER ANNEXURE-A
RENEWAL OF IMPELLER FOR FRESH WATER PUMPS ..SCOPE INVOLVESIMPELLER TO BE DIE CASTED,MACHINED AND DYNAMIC BALANCING TO BE CARRIED OUT UNDER VENDOR SCOPE.MAT :BRASS/BRONZE
RENEWAL OF IMPELLER FOR BILGE PUMPS.SCOPOE INVOLVES IMPELLER TO BE DIE CASTED,MACHINED AND DYNAMIC BALANCING TO BE CARRIED OUT UNDER VENDOR SCOPE .MAT :BRASS/BRONZE
RENEWAL OF IMPELLER FOR AC SEA WATER PUMPS.SCOPOE INVOLVES IMPELLER TO BE DIE CASTED,MACHINED AND DYNAMIC BALANCING TO BE CARRIED OUT UNDER VENDOR SCOPE..MAT :BRASS/BRONZE
RENEWAL OF IMPELLER FOR REF SEA WATER PUMPS.SCOPE INVOLVES IMPELLER TO BE DIE CASTED,MACHINED AND DYNAMIC BALANCING TO BE CARRIED OUT UNDER VENDOR SCOPE.MAT :BRASS/BRONZE
SR4- CARRY OUT FUNCTIONAL TEST OF RELIEF VV. RESET TO SPECIFIED LIFTING PRESSURE. PRESSURE RANGE - 22 BAR
OVERHAULING OF STANDBY GEAR BOX RELIEF VV. RESET TO SPECIFIED LIFTING PRESSURE. PRESSURE RANGE - 22 BAR.SPARES REQUIRED FOR OVERHAULING TO BE ARRANGED BY VENDOR.
OVERHAUL S/BY FUEL OIL TRANSFER PP. (MAINTOP- 31200) CAPACITY - 28 TPH.OVERHAULING TO BE CARRIED OUT AS PER THE ANNEXURE-A.FUEL OIL TRANSFER (FOT) PUMP, MAKE- M/s ROYSON, MODEL- RGB 8, MAINTOP - 31200
SR4- CARRY OUT FUNCTIONAL TEST OF RELIEF VV. RESET TO SPECIFIED LIFTING PRESSURE. PRESSURE RANGE 5 BAR.
OVERHAULING OF FUEL OIL TRANSFER PUMP RELIEF VALVE. RESET TO SPECIFIED LIFTING PRESSURE. PRESSURE RANGE - 22 BAR.SPARES REQUIRED FOR OVERHAULING TO BE ARRANGED BY VENDOR.
RENEW THE SV MOUNT OF FUEL OIL TRANSFER PUMP.MAKE :RESISTOFLEX.TO BE PROCURED BY VENDOR THROUGH AUTHORISED DEALERS OF RESISTOFLEX.
OVERHAULING OF FIRE MAIN PUMPS AS PER ANNEXURE-A CAPACITY - 100 TPH, MAKE - SPX FLOW, MODEL - CELVZ 65-250.
PROCURE SUPPLY AND RENEWAL OF LUB OIL PRIMING PUMP/ ,WORKINGPRESSURE 5-8 BAR
NASS Engineering Services Pvt Ltd (BID ID -416147)
Marine Blue Technology Pvt. Ltd. (BID ID -416154)
SHRI GURUDATTA ENGINEERING WORKS (BID ID -416167)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Restricted Tender
This is a Open Limited tender. Documents are accessible only to bidders authorized by the issuing authority on the government portal.
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .