| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.5 CrAccepted-AOC BATHINDA | ₹2.5 Cr | 1 | Accepted-AOC awarded |
| 2 | 2₹2.7 Cr+₹18.5 L (7.43%)Rejected-Finance 121004 | ₹2.7 Cr+₹18.5 L (7.43%) | 2 | Rejected-Finance high bidder |
| Sl No | Description | Qty | Unit | PANKAJ KUMAR CONTRACTOR L2 | GARG CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods | 1 | Cum | 81.12 ₹81.12 Lowest | 81.12 ₹81.12 Lowest |
| 2.00 | Earthwork Undressed with combined Lead upto 15 mtr. including Breaking of clods. | 1 | Cum | 114.83 ₹114.83 Lowest | 114.83 ₹114.83 Lowest |
| 3.00 | Dressing of New Earthwork | 1 | Sqm | 1.3 ₹1.3 Lowest | 1.3 ₹1.3 Lowest |
| 4.00 | Earthwork Filling in 0.152 mtr. layers in foundation, including ramming, watering and consolidation under bed. | 1 | Cum | 147.49 ₹147.49 Lowest | 147.49 ₹147.49 Lowest |
| 5.00 | Re-handling of earthwork recently executed | 1 | Cum | 65 ₹65 | 64.9 ₹64.9 Lowest |
| 6.00 | Dag belling single kassi stroke minimum 7.5 cm depth. | 1 | Km | 850 ₹850 | 848.07 ₹848.07 Lowest |
| 7.00 | Dressing of Bed and preparation of sub grade for lining. CSR item no 19.1 | 1 | Sqm | 12 ₹12 | 11.35 ₹11.35 Lowest |
| 8.00 | Dismentalling Of Brick Work ( As per CSR item NO. 8.5 (b)) | 1 | Cum | 195 ₹195 | 191.74 ₹191.74 Lowest |
| 9.00 | 1st Class burnt Brick work laid in csm1:6 in foundation & Plinth | 1 | Cum | 7,800 ₹7,800 | 7,700 ₹7,700 Lowest |
| 10.00 | 10mm thick Cement Plaster 1:4 ( for side walls ) | 1 | Sqm | 210 ₹210 | 200 ₹200 Lowest |
Tender Value
₹3.0 Cr
EMD Value
₹6.1 L
Closing Date
6 Apr 2026, 9:00 amClosed
Executive Engineer
Faridkot Canal And Ground Water Division
Laying U/G Pipeline and water courses for the outlet Rd 116032/L of Kokri Disty
2026_WR_163753_1
Laying U/G Pipeline and water courses for the outlet Rd 116032/L of Kokri Distyty
Open Tender
Repair and Maintenance Services
Item Rate
60 days
JAGROAN
Pre Qualification Details
2 documents required · 2 mandatory
₹2,000
Yes
₹6.1 L
Yes
Faridkot
11 May 2026
16 Mar 2026
6 Apr 2026
16 Mar 2026
6 Apr 2026
16 Mar 2026
30 Mar 2026
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: Faridkot Canal Division, Faridkot
Name of Work: Laying Underground Pipe Line & Watercourse for outlet RD 116032/L of Kokri Disty.
Contract No: 01639-250059
Name of the Bidder/ Bidding Firm / Company :
Sl. No. C.S.R Item No./Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods Cum Excess(+) Full Conversion INR
Earthwork Undressed with combined Lead upto 15 mtr. including Breaking of clods. Cum Excess(+) Full Conversion INR
Dressing of New Earthwork Sqm Excess(+) Full Conversion INR
Earthwork Filling in 0.152 mtr. layers in foundation, including ramming, watering and consolidation under bed. Cum Excess(+) Full Conversion INR
Re-handling of earthwork recently executed Cum Excess(+) Full Conversion INR
Dag belling single kassi stroke minimum 7.5 cm depth. Km Excess(+) Full Conversion INR
Dressing of Bed and preparation of sub grade for lining. CSR item no 19.1 Sqm Excess(+) Full Conversion INR
Dismentalling Of Brick Work ( As per CSR item NO. 8.5 (b)) Cum Excess(+) Full Conversion INR
1st Class burnt Brick work laid in csm1:6 in foundation & Plinth Cum Excess(+) Full Conversion INR
10mm thick Cement Plaster 1:4 ( for side walls ) Sqm Excess(+) Full Conversion INR
10mm thick Cement Plaster 1:4 ( for Floors& Top ) Sqm Excess(+) Full Conversion INR
Supply & laying Dry Brick Bats Cum Excess(+) Full Conversion INR
Centering and shuttering for faces of concrete Sqm Excess(+) Full Conversion INR
RCC 1:2:4 mixing with stone ballast or shingle mixing by mechanical means using concrete mixer volumetric type Cum Excess(+) Full Conversion INR
Cold twisted deformed (ribbed/ tor steel) Bars Fe 500 grade as per IS 1786-1985 for R.C.C. works, where not included in the complete rate of R.C.C. including bending, binding, and placing in position complete. Qtl Excess(+) Full Conversion INR
Fixing of RCC Frame in Nakka No Excess(+) Full Conversion INR
Providing lowering & jointing 500 mm dia precast concrete NP-2 plain end pipes and collar with reinforcement in trenches & laying same to correct allignment (Complete) as per IS 458-2003. Mtr Excess(+) Full Conversion INR
Excavation by mechanical means(JCB or Hydraulic excavator) in trenches for pipe lines with straight or open cutting in streets or open area including trimming and dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation,watering , including the cost of dewatering of rain water, diversion for traffic, night signals. providing & fixing caution boards, crossing over trenches for access to the houses, watching, fencing, etc. and removal of surplus soil out side/inside the town involving lead upto 15 meter complete in all respect. Upto 1.5 meter cum Excess(+) Full Conversion INR
Excavation by mechanical means(JCB or Hydraulic excavator) in trenches for pipe lines with straight or open cutting in streets or open area including trimming and dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation,watering , including the cost of dewatering of rain water, diversion for traffic, night signals. providing & fixing caution boards, crossing over trenches for access to the houses, watching, fencing, etc. and removal of surplus soil out side/inside the town involving lead upto 15 meter complete in all respect. . from 1.5 to 2.25 mtr depth cum Excess(+) Full Conversion INR
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. cum Excess(+) Full Conversion INR
Cement Conc. 1:4:8 with brick ballast, mixing by manual means. cum Excess(+) Full Conversion INR
Cement Conc. 1:2:4 with stone ballast or shingle mixing by manual means. cum Excess(+) Full Conversion INR
Lowering & jointing 500 mm dia precast concrete NP-2 plain end pipes and collar with reinforcement in trenches & laying same to correct allignment (Complete) as per IS 458-2003. m Excess(+) Full Conversion INR
Lowering & jointing 150 mm dia precast concrete NP-2 plain end pipes and collar with reinforcement in trenches & laying same to correct allignment (Complete) as per IS 458-2003. m Excess(+) Full Conversion INR
Providing orange colour safety footrest of minimum 6mm thick plastic encapsulated as per IS:10910 on 12mm dia steel bar confirming to IS: 1786 having minimun cross section as 23mm x 25mm and over all minimum length 263mm and width as 165mm with minimum 112mm space between protruted legs having 2mm tread on top surface by ribbing or chequering besides necessary and adequate anchoring projections on tail length on 138 mm as per standard drawing and suitable to with stand the bend test and chemical resistance test as per specification and having manufacturer's permanent identification mark to be visible even after fixing, including fixing in manholes with 230x150x75cm cement concrete block 1:2:4 (1 cement: 2 sand: 4 stone aggragate) complete as per design Nos Excess(+) Full Conversion INR
Providing and fixing of Alfa valve of 500 mm dia to correct allignment (Complete). Nos Excess(+) Full Conversion INR
Wrought iron & Mild steel ladders, framed grills, gratings etc. with ends of bars riveted or molded forged framed window guards, barred iron doors stair case iron railing etc. including cost of bolts and nuts, screws, welding rod complete fixing in position Qtl Excess(+) Full Conversion INR
Providing and fixing of Assembly/appurtments consisting of a Alfa Valve and operating arrangement in main Pipe Line Complete in all Respect. Nos Excess(+) Full Conversion INR
1st Class burnt Brick work laid in csm1:5 in foundation & Plinth Cum Excess(+) Full Conversion INR
Providing lowering & jointing 450 mm dia precast concrete NP-2 plain end pipes and collar with reinforcement in trenches & laying same to correct allignment (Complete) as per IS 458-2003. Mtr Excess(+) Full Conversion INR
Any other Item Nos Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Tendernotice_2.pdf
PDF • 0.63 MB
BOQ_331591.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .