Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 38 22 39 PLOT NO C11 SRI TOWER ROAD NO 10 INDUSTRIAL ESTATE INDUSTRIAL ESTATE KANCHARAPALEM VISAKHAPATNAM VISAKHAPATNAM ANDHRA PRADESH 530007 | VISAKHAPATANAM | ANDHRA PRADESH | 530007 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 22 1 48 1 CHENGALARAOPETA BEACH ROAD VISAKHAPATNAM ANDHRA PRADESH 530001 | VISAKHAPATANAM | ANDHRA PRADESH | 530001 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
7 Feb 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
M(SRC-COM)
HSL GANDHIGRAM VISAKHAPATNAM
Overhauling of Auxilary engines for MV Viswa vijeta
2022_HSL_88839_1
20/ 22002 /Auxilary Engines/ 204 /2021-22
Open Tender
Miscellaneous Services
Turn-key
20 days
Hindustan Shipyard Ltd, Visakhapatnam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Exempted
10 Feb 2022
31 Jan 2022
7 Feb 2022
31 Jan 2022
7 Feb 2022
31 Jan 2022
120 days
Amount
E21027 ITEM : AUXILIARY ENGINE TYPE / CAPACITY / DETAILS : MAKE : DIAHATSU DIESEL ENGINE CO.LTD., TYPE:VERTICAL WATER COOLING DIRECT INJECTION TYPE 4 CYCLE DIESEL ENGINE MODEL:5 DK-20,NO. OF CYLINDERS-05(IN LINE) CYLINDER BORE X STROKE:200 X 300 MM RATED OUT PUT:660 KW,RATED SPEED: 900 RPM
NOTE: THE ENTIRE JOB IS A TURNKEY JOB,THE SPARES REQUIRED FOR THE JOB TO BE ARRANGED BY THE VENDOR(Except the ship supplied spares)
FOLLOWING WORKS TO BE CARRIED OUT ON AUX ENGINE;PRORATA COST TO BE APPLICABLE FOR NOS
ALL UNIT CYLINDER HEADS TO BE REMOVED.ALL MOUNTINGS,INLET V/V,EXH VALVE TO O'HAUL, PRESSUE TEST AS PER MAKER INSTRUCTION ( SPARE SHIP SUPPLY) . OVERHALED CYLINDER HEAD TO BE FITTED BACK ON ENGINE
ALL PISTONS TO BE WITHDRRAWN, OVERAHULED AND CALIBRATED AND FITTED BACK IN THE ENGINE . .PISTON AND LINER TO BE CLEANED TO CALIBERATE.
LINERS TO BE WITHDRAWN, OVERHAULED AND FITTED BACK ON ENGINE COOLING SPACES TO CLEAN.LINERS TO BE FITTED BACK WITH NEW O-RING(SHIP'S SUPPLY), ALL UNITS TO BE COMPLETELY BOXED BACK.
CRANK SHAFT DEFLECTION FOR THREE ENGINES TO BE TAKEN BEFORE DISMANTLING AND AFTER ASSEMBLING.ALL READINGS TO BE SUBMITTED.
ALL FUEL INJECTION PUMPS TO REMOVE FROM PLACE; TRANSPORT TO VENDORS WORKSHOP; DISMANTLE COMPLETELY AND OVERHAUL. ALL DAMAGED; WORNOUT PARTS TO REPLACE WITH NEW SPARES (SHIP'S SUPPLY). ALL FUEL INJECTION PUMPS TO ASSEMBLE WITH NEW SEAL RINGS & GASKETS; TRANSPORT TO SHIP,FIT IN PLACE AND ALL CONNECTIONS TO BE MADE.SATISFACTORY ENGINE TRIALS TO BE GIVEN ON NO LOAD AND ON MAXIMUM RATED LOAD.
ALL FUEL; EXHAUST AND INLET CAMS TO EXAMINE. FOR REPLACING ONE OR MORE CAMS; COMPLETE CAM SHAFT WILL REQUIRE TO BE WITHDRAWN; AFTER REMOVING DRIVE GEAR AND BEARINGS. QUOTE FOR INSPECTION OF CAMS AND RENEWAL OF TWO CAMS ON ONE ENGINE
ALL CYLINDER HEADS TO BE CHEMICALLY CLEANED THOROUGHLY ON COOLING WATER SIDE TO REMOVE ALL SCALES AND TO BE PRESSURE TESTED TO 4 BAR
AUX. ENGINE LUB OIL COOLERS AND JACKET COOLERS TO REMOVE FROM PLACE; TUBES(FRESH WATER & OIL SIDE) TO BE CHEMICALLY CLEANED; GASKET TO BE CHECKED.ALL TUBES TO BE CHECKED FOR ANY ABNORMALITY. COOLER TO BE BOXED BACK AND TESTED FOR ANY LEAKAGE.
AIR COOLERS TO REMOVE FROM PLACE; DISMANTLED BY OPENING COVERS; ELEMENT TO BE CHEMICALLY CLEANED FR 24 HRS IN STEAMMED CHEMICAL BATH. ELEMENT TO BE CLEANED WITH WATER.ELEMENT TO BE BOXED BACK & COMPLETE ASSEMBLY OF COOLER TO BE PRESSURE
ALL CRANK PIN BEARING, MAIN BEARING , THRUST BEARING CLEARANCE TO BE RECORDED BEFORE OPENING AND AFTER BOX BACK. ALL AE THREE CONNECTING ROD CRANK PIN BOLTS TO BE RENEWED (SHIP SUPPLY).CRANK PIN BEARING TO SURVEY.CRANKS PINS AND CONNECTING ROD BIG END TO BE GAUGED FOR OVALITY.AFTER COMPLITION OF SURVEY BEARING TO BE FITTED BACK IN PLACE. QUOTE FOR ONE ENGINE AS ONE SET
AUX ENGINES ATTACH LO PUMP & HT PUMP OVERHAUL & FIT BACK. NEW FOUNDATION BOLTS TO BE FITTED. (TWO PPS PER ENGINE IS ONE SET)
ALL THREE A/E TACHOMETER TO CHECK AND CALIBERATE.
ALL THREE AUX.ENGINE ALARMS AND TRIPS TO CHECK AND ADUST AS PER OPERATORS MANUAL SETTINGS BY OEM
ALL THREE A/E GOVERNORS TO BE OVERHAULED. SPARES VENDOR SCOPE
ALL THREE A/E FLYWHEEL RIM GEARS TO BE RENEWED AND ALIGNED PROPERLY WITH AIR MOTOR AND ALTERNATOR . SPARE SHIP SUPPLY .
SATISFACTORY TRIAL TO BE SHOWN TO ELO/SUPDT. USING SHIPS LOAD DURING SEA TRIAL.
TO O'HAUL MAIN STARTING VALVE,STARTING MOTOR,EMERGENCY STARTING VALVE,STOP CYLINDER AND OVER SPEED DEVICE.
Sri Balaji Marine and Civil Engg Works
Asha Engineering Works
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .