Loading…
Loading…
Tender Value
₹1.0 Cr
EMD Value
₹2.5 L
Closing Date
29 May 2026, 5:00 pmClosed
Executive Engineer, CD, PWD, Khatima (U.S. Nagar)
Office of The Executive Engineer, C.D., P.W.D., Khatima (U.S. Nagar)
Renewal of Khatima Chhinki Biriya Jhankat motor road by SDBC Under Renewal 2026-27
2026_pwd_95521_1
EE TN 872/5AC Date 13-05-2026(01)
Open Tender
Civil Works - Roads
Item Rate
270 days
Khatima
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
Head 0059018000600 and GST no- 05AAAGL0113J1ZW
₹2.5 L
16 May 2026
16 May 2026
30 May 2026
16 May 2026
29 May 2026
16 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Tack coat using VG-10 grade bitumen Over dry and hungry bituminous surfaces @0.40 kg/sqm. | - | Sqm | 23.6 | - |
| 2 | Bituminous Macadam Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Bitumen VG-30 @ 3.3% of the weight of mix has been used for analysis purpose. The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD) | - | cum | 8,440.9 | - |
| 3 | Providing and laying Semi Dense Bituminous Concrete with the use of batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specificationclause No. 508 complete in all respects. Grading II - 10mm using VG - 30 bitumen (bituminous binder @ 5 % of
mix) | - | cum | 10,265.6 | - |
| 4 | Maintenance of Earhen shoulder (stripping of excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903 | - | Sqm | 14.5 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.61 MB
BOQ_112937.xls
BOQ • 0.25 MB
Corrigendum27052026.pdf
PDF • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .