Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹95.7 LAdmitted-Finance TEHRI G | DEHRADUN | UTTARAKHAND | 248008 | ₹95.7 L | L1 | Admitted-Finance |
| 2 | L2₹98.3 L+₹2.6 L (2.72%)Admitted-Finance | ₹98.3 L+₹2.6 L (2.72%) | L2 | Admitted-Finance |
| 3 | L3₹1.2 Cr+₹19.4 L (20.3%)Admitted-Finance NAINBAG | DEHRADUN | UTTARAKHAND | 248001 | ₹1.2 Cr+₹19.4 L (20.3%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MS SHYAM SINGH L3 | Sunil Joshi Electrical Contractor L1 | Semwal Electrical Engineering Company L2 |
|---|---|---|---|---|---|---|
| 1.00Electrical Items : | ||||||
| 2.00 | E- CLAMP | 326 | NOS | 84,760 ₹84,760 Lowest | 87,368 ₹87,368 | 94,540 ₹94,540 |
| 3.00 | STAY CLAMP FOR SP-21 WITH NUT & BOLT | 110 | NOS | 28,600 ₹28,600 | 27,390 ₹27,390 Lowest | 28,600 ₹28,600 |
| 4.00 | STAY CLAMP FOR SP-23 WITH NUT & BOLT | 202 | NOS | 53,530 ₹53,530 | 50,500 ₹50,500 Lowest | 52,520 ₹52,520 |
| 5.00 | SUSPENSION CLAMP WITH EYE HOOK | 290 | NOS | 1,45,000 ₹1,45,000 | 1,30,500 ₹1,30,500 Lowest | 1,31,950 ₹1,31,950 |
| 6.00 | PP & CLAMP WITH N&B ST POLE SP-23 | 134 | NOS | 73,700 ₹73,700 | 53,600 ₹53,600 Lowest | 54,940 ₹54,940 |
| 7.00 | Dead End Clamp with I Hook | 180 | NOS | 1,00,800 ₹1,00,800 | 81,000 ₹81,000 Lowest | 81,900 ₹81,900 |
| 8.00 | STAY INSULATOR | 350 | NOS | 10,850 ₹10,850 | 10,500 ₹10,500 Lowest | 10,850 ₹10,850 |
| 9.00 | LT BUSHING BUS BAR ARRANGEMENT 100 kVA | 84 | NOS | 11,760 ₹11,760 | 10,668 ₹10,668 Lowest | 10,920 ₹10,920 |
| 10.00 | Danger Board With Clamp N&B | 70 | NOS | 17,500 ₹17,500 | 13,860 ₹13,860 Lowest | 16,450 ₹16,450 |
Tender Value
Refer Docs
EMD Value
₹2.0 L
Closing Date
17 Mar 2025, 2:00 pmClosed
SE
EDC TEHRI
Increasing capacity of DTR (16 KVA to 25 KVA) and line strengthening work of 11 KV and LT line in different villages of Gaza Section under EDD Tehri .
2025_UPCL4_81178_1
77/EDCT/2024-25
Open Tender
Miscellaneous Services
Item Wise
90 days
Gaza
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Yes
EE TEST
₹2.0 L
Yes
17 Apr 2025
7 Mar 2025
18 Mar 2025
7 Mar 2025
17 Mar 2025
7 Mar 2025
Electrical Items :
E- CLAMP
STAY CLAMP FOR SP-21 WITH NUT & BOLT
STAY CLAMP FOR SP-23 WITH NUT & BOLT
SUSPENSION CLAMP WITH EYE HOOK
PP & CLAMP WITH N&B ST POLE SP-23
Dead End Clamp with I Hook
STAY INSULATOR
LT BUSHING BUS BAR ARRANGEMENT 100 kVA
Danger Board With Clamp N&B
Piercing Connector 35 Sq.mm-35Sq.mm
INSULATED PIERCING CONNECTOR 16-35 SQ.MM
STAY SET GI 16X1800MM-D
STAY WIRE GI 7/3.15MM 7/10SWG-D
EARTHING ROD MS 20X2500MM-D
GI WIRE 5MM/6 SWG -D
LT (Unarm.) XLPE Insulated cable 1x70mm²
LT XLPE Cable 1x35 sqmm
LT XLPE Cable 1x25 sqmm
CABLE AL 4X25 SQ. mm PVC
LT AB Cable 3x35+1x25 sqmm
LT XLPE AB CABLE 1CX16+25 SQ.MM.
LT DISTRIBUTION BOX 1 PHASE
LT DISTRUBITON BOX 3 PHASE
LT Fuse Set With Fuse Wire
AL. CRIMPING TYPE LUGS 70 SQ.mm
Al. Lugs 50 sq. mm.
LABOUR ( SERVICE)
ERECTION OF EARTHING ROD
FABRICATION OF STEEL
EXCAVATION OF PIT FOR STAY SET
ERECTION OF LT STAY SET
ERECTION OF 11 KV STAY SET
GROUTING OF STAY SET
EXCAVATION OF PIT FOR POLE
ERECTION OF SINGLE SP-21 POLE
ERECTION OF SINGLE SP-23 POLE
ERECTION OF SP-23 DOUBLE POLE
GROUTING OF POLE
DISMANTLING OF SP-21/SP-23 SINGLE POLE
DISMANTLING OF SP-23 DOUBLE POLE
DISMANTLING OF 16 KVA DTR
INST. OF 25 KVA DTR ON POLE STRUCTURE
FIXING OF TPMO
FIXING OF FUSE SET
FIXING OF LIGHTNING ARRESTOR
FIXING OF LT FUSE SET
LAYING OF WEASEL CONDUCTOR IN HT LINE
LOPPING & CHOPPINGOF TREE BRANCHES
CARTAGE SP-21/23 POLE, 51-70 KM
CARTAGE OF PETTY MATERIAL,51-70 KM
CARTAGE OF 16/25 KVA DTR, 51-70 KM
HEADLOAD CARTAGE SP-21/23 POLE(0-1 KM)
HEADLOAD CARTAGE SP-21/23 POLE(1-3 KM)
HEADLOAD CARTAGE OF MATERIAL(0-1 KM)
HEADLOAD CARTAGE OF MATERIAL(1-3 KM)
HEADLOAD CARTAGE OF 16 KVA DTR(0-1 KM)
HEADLOAD CARTAGE OF 16 KVA DTR(1-3 KM)
HEADLOAD CARTAGE OF 25 KVA DTR(0-1 KM)
HEADLOAD CARTAGE OF 25 KVA DTR(1-3 KM)
DISCONNECTION & RECONNECTION OF CONsumer
LAYING OF LT AB CABLE 3X35+1X25 SQMM
Installation of LT DB 1 Ph for LT AB
Installation of LT DB 3 Ph for LT AB Cab
INST. OF DANGER BOARD/NUMBER PLATE
Laying of AB Cable 1x16+25 mm
BACK CARTAGE OF PETTY MATERIAL,71-100 KM
Chemical Earthing of T/F
BACK HEAD LOAD CART. OF PETTY MAT. 0-1KM
BACK HEAD LOAD CART. OF PETTY MAT. 1-3KM
DISMANTLING OF LT XLPE CABLE 1CX16+25
Semwal Electrical Engineering Company (BID ID -366695)
MS SHYAM SINGH (BID ID -367046)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .