Hindustan Shipyard Limited Gandhigram SR Complex Visakhapatnam 530 005
Overhauling of Jet Pumps on DCI DR XX
2021_HSL_88421_1
20/22003/153/2021-22
Open Tender
Miscellaneous Services
Service
25 days
Hindustan Shipyard Ltd
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
Exempted
18 Jan 2022
23 Dec 2021
4 Jan 2022
23 Dec 2021
4 Jan 2022
23 Dec 2021
Amount
JET PUMPS (HORIZONTAL SPLIT-CASING TYPE) - P&S: Both Jet pumps toothed-gear coupling alignment to be checked, axial & radial alignment readings to be taken before removing jet pump from position.Pump to be dismantled, coupling to be removed and overhauled completely. Wear rings, shaft sleeves and Impeller to renew.Both end bearings to renew. During overhauling any defect observed, same to be rectified/repaired/renewed. toothed-gear coupling to be cleaned, inspected & any defects noticed to be rectified. After completion of repairs, pumps to be boxed back with new joints (contractor's supply), pressure tested for 15 bar for no leak..Pump to be fitted in place, proper alignment done and satisfactory trials to be shown to SS. Pump both end seals to be renewed .All consumables (Bearings,shaft sleeves, seals etc) must be supplied by the contractor.
Pitted/holed portions of casings, wear-ring landing/seating area to be weld-build-up with suitable electrodes and line-boring of (top & bottom casings together) wear-ring landing area to be carried out. Contractor has to quote cost for required electrodes for buildup at S.No.5 of BOQ.
Build-up
Line-boring
For Spares, Material: For executing of the above mentioned jobs, Contractor has to procure, supply all items, material and fitted in its place. Contractor has to quote lumpsum cost for materials/spares/consumables for above entire SoW (S.No.1 to 4). The cost of spares quoted by the contractor will be considered "on not exceeding basis of total lumpsum cost mentioned in the BOQ" for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Serial (S.No.5) against third party / OEM invoice.
SHRI GURUDATTA ENGINEERING WORKS
SRI SURYA KALA INDUSTRIES
VENKATESWARA ENGINEERING WORKS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .