Loading…
Loading…
Tender Value
₹65.0 L
EMD Value
₹1.9 L
Closing Date
29 Jun 2026, 2:00 pm
Dr. Mohan Chandra Joshi
O/o the Superintending Archaeologist, Archaeological Survey of India, Dehradun Circle, Tyagi Road Dehradun-Uttarakhand-248001
Upgradation of Sculpture Shet and Child Care Room at Group of Temple, Baijnath
2026_ASI_912045_1
D-42/58/2026-Dehradun Circle (Upgradation of Sculpture Shed at Baijnath Uttarakhand
Open Tender
Civil Works
180 days
Baijnath
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.9 L
Yes
Dehradun Circle of A.S.I.
8 Jun 2026
8 Jun 2026
30 Jun 2026
8 Jun 2026
29 Jun 2026
9 Jun 2026
9 Jun 2026 - 9 Jun 2026
9 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Upgradation of Sculpture Shed and Child Care Room at Group of Temple, Baijnath -Uttarakhand. | ||||||
| 1.01 | Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually/ by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-incharge : In cement mortar | 21.8 | cum | - | - | item2 |
| 2 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils asdirected, within a lead of 50 m. Ordinary rock. | 5.83 | cum | - | - | item3 |
| 3 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initiallead, for all leads including all lifts involved. | 13.02 | cum | - | - | item4 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.81 | cum | - | - | item5 |
| 5 | Random rubble masonry with hard stone in foundation and plinth level , including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level and the like. Cement mortar 1:6 (1 cement : 6coarse sand) | 34.19 | cum | - | - | item6 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for massconcrete | 37.39 | M2 | - | - | item7 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts. | 28.77 | M2 | - | - | item8 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform | 61.69 | M2 | - | - | item9 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and enforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 7 | cum | - | - | item10 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
TenderDocumentSculptureShedBaijnath.pdf
Tender Documents • 25.01 MB
BOQ_958524.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid