| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 CrAccepted-AOC C 85 SECTOR 63 NOIDA GAUTAM BUDDHA NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹4.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹4.6 Cr+₹45.6 L (11.1%)Rejected-AOC 16 12A SWAMIJI ROAD NEAR SABUJ SANGHA KOLKATA WEST BENGAL 700060 | KOLKATA | WEST BENGAL | 700060 | ₹4.6 Cr+₹45.6 L (11.1%) | L2 | Rejected-AOC L2 |
| 3 | L3₹4.7 Cr+₹61.5 L (15.0%)Rejected-AOC 17 6 FLAT NO 06 SAROJ MANSION BUILDING 6TH STREET NANDANAM EXTENSION NANDANAM CHENNAI TAMIL NADU 600035 | CHENNAI | TAMIL NADU | 600035 | ₹4.7 Cr+₹61.5 L (15.0%) | L3 | Rejected-AOC L3 |
Tender Value
₹4.4 Cr
EMD Value
₹8.8 L
Closing Date
10 Oct 2020, 3:30 pmClosed
GM,SgTPP
Office of the General Manager Administrative building SgTPP 742237
AMC Boiler and auxiliary system Stage I 2x300 MW SgTPP
2020_WBPDC_295350_1
WBPDCL/SGTPP/NIT/E1398/20-21
Open Tender
Support/Maintenance Service
Lump-sum
730 days
Sagardighi Thermal Power Project
As per NIT
3 documents required · 3 mandatory
₹0
₹8.8 L
Yes
SgTPP
4 Dec 2020
7 Sept 2020
14 Oct 2020
7 Sept 2020
10 Oct 2020
7 Sept 2020
16 Sept 2020
Annual maintenance contract of Boiler & Auxiliary system Stage I , 2 x 300 MW , SgTPP.
Mandatory job : Maint. contract of boiler & Aux. System
Coal mill overhauling as per scope of work in annexure 2A including the supply of all consumables, manpower, T&P, measuring instruments, Scaffolding etc.
Coal mill mini overhauling as per scope of work in annexure 2B including the supply of all consumables, manpower, T&P, measuring instruments, Scaffolding etc.
Gear Box Replacement as per annexure 2C including the supply of all consumables, manpower, T&P, measuring instruments, Scaffolding etc.
Feeder overhauling as per annexure 2D
Additional tyre servicing
Cleaning, stacking, loading, carriage over pucca road and unloading at destination(within 5 km lead) of ash and coal mill rejects from rejection conveyor tunnel and surroundings with the scope of supply of manpower, Tools and tackles, conveying vehicle (like tractor) with operator and fuel.
All SADC internal checking in all corner of Boiler ,dismantling/freeness checking, replacement of bush /bearing,repairing of erosion ,coupling with power cylinder operation and complete box up of all doors of secondary air duct with gasket and necessary scaffolding
HFO/LDO/Air nozzle/Coal nozzle system tilting checking by opening the boiler door,reach rod adjustment /cleaning/replacement (wherever needed) necessary full welding ,door repairing with necessary scaffolding and complete box up of doors,Scrap removal & checking of operation
Coal nozzle tip,oil nozzle tip,airnozzle tip,checking by opening Boiler door at bottom hopper with necessary scaffolding in furnace necessary rectification ,with all kinds of allied jobs,angle of burner tilting adjustment and complete boxup
Sky climber fitting in the Boiler & dismantling for burner check up & operation during burner checking
Repalcement of damaged coal compartment assembly with all associted work.(without scaffolding)
CCP bend dismantling, replacement, welding,pipe alignment,with hanger support adjustment with necessary scaffolding and removal of scrap from site to scrap yard .
CCP straight pipe dismantling, replacement, welding,pipe alignment,with hanger support adjustment with necessary scaffolding and removal of scrap from site to scrap yard.
Replacement of Seal air fan with new bearing ,bearing housing,coupling, impeller , shaft bearing cooling water line modification after removal of old Seal air fan
Duct Repairing
Replacement of APH(Model : Model : LAP10320/3883) Guide Bearing assy. with all associated work.
Replacement of APH(Model : LAP10320/3883) Support Bearing assy. with all associted work.
Gear Box of APH (Model : LAP10320/3883) replacement along with all associated work (Time: 02days).
Water Wall Tube Joint without scaffolding
Economiser Coil/LTSH bottom bank/Steam Cooled Wall Joint without scaffolding
Roof Tube Joint without scaffolding
Spacer Tube Joint without scaffolding
LTSH and Eco. Hanger Tube per joint
Screen Tube Joint without scaffolding per joint
All Reheater Joint with scaffolding (except Wall Reheater and Medium Reheater where extra payment will be made for any scaffolding beyond 6 m Horizontal and 6 m Vertical) per joint
LTSH middle / top bank / wall reheater joint without scaffolding per joint
Other Superheater Joint excluding LTSH with scaffolding upto 6 m Vertical and 6 m Horizontal per joint
Division Panel without scaffolding per joint
Stress Relieving
Radiography
Vertical scaffolding for approaching Furnace/ Roof Tube/ Wall Reheater/ MRH/ Platen/ Division panel (Per 06 Meter Vertical)
Horizontal scaffolding for approaching Medium & Wall RH/ Platen SH/ Divisional Panel/ SCW/ Roof Tubes/ Furnace (Total to exceed 10 m in each case)/ Per 6 Meter Horizontal
Removal, Fabrication and Fitting of Guard Tube and Guard Plate per piece
Build up in eroded Tubes as found to be necessary per sq. inch.
Economiser coil lifting , repairing, fitting & jointing with proper alignment per coil
LTSH coil pulling , inspection, proper alignment of coil & panel with clit and support welding per coil
Membrane strip / skin casing welding per meter
Second pass scaffolding Per 6 Meter Horizontal/Vertical
TECHNO ENGINEERING
Brothers Engineering And Erectors Limited
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .