Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-AOC A CLASS GOVT CONTRACTOR V P O TANEHAR TEHSIL DHARAMPUR DISTT MANDI | ₹1.4 L Quoted ₹1.2 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹1.3 LRejected-AOC V AMB P O TEHSIL JAWALAMUKHI DISTT KANGRA H P | KANGRA | HIMACHAL PRADESH | 175013 | ₹1.3 L | L2 | Rejected-AOC Being L2 |
| 3 | L3₹1.3 LRejected-AOC VILL CHANDPUR P O KHOUDA SUB TEHSIL TIHRA DISTT MANDI | MANDI | HIMACHAL PRADESH | 175001 | ₹1.3 L | L3 | Rejected-AOC Being L3 |
Updated dates
Tender Value
₹1.5 L
EMD Value
₹1,483
Closing Date
30 Mar 2026, 11:00 amClosed
Sr. XEN
ED HPSEBL DHARAMPUR
Tender for restoration of 33 KV HT line Bahari to Makriri feeder damaged due to heavy rain fall on dated 30.06.2025 01.07.2025 in (E)Section Sidhpur UESD HPSEBL Dharampur
2026_HPSEB_131996_1
148/2025-26
Open Tender
Supply and Erection
60 days
Dharampur
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
₹1,483
16 Apr 2026
20 Mar 2026
30 Mar 2026
20 Mar 2026
30 Mar 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1(Erection/Labour Part HT Line ) | |||||
| 1.01 | Erection of S/T pole 9 mtr long,(Double pole structure) with RCC muff Including digging of pit of size 1.10x0.75x1.50, drilling of holes in poles, X-bracing set, X-arms, Fixing of insulators, X-arms, X- bracing set, fixing of barbed wire, Danger plate, filling of pit & ramming and painting of pole complete in all respects(C.C. 1:3:6 for muffing will be provided by the contractor). | 1 | No. | - | - |
| 1.02 | Erection of HT earthing set comprising digging of pit, fixing of GI wire to the earth system,and filling of pit complete in all respects. | 2 | No. | - | - |
| 1.03 | Erection of stay set HT line, comprising digging of pit, fixing of stay rod, filling of pit, Nozzeling and tightining complete in all respects. | 8 | No. | - | - |
| 1.04 | Sagging of conductor 1 KM single GI wire, , comprising laying of Conductor, stringing & sagging, binding with insulator complete in all respects. | - | km | - | - |
| 1.05 | Erection of H T line with ACSR 6/1/4.72 (100 mm²) mm such as stringing, tensioning and sagging,jointing and fastening . | 1.14 | km | - | - |
| 1.06 | Mannual carriage of complete Material of H T line from road side to site of work | 1 | Job | - | - |
| 1.07 | Transportation Charges for complete Material of H T line | 1 | Job | - | - |
| 2(Supply Part HT Line) | |||||
| 2.01 | Muffs (2000mm) with concerete filling | 2 | No. | - | - |
stage.html
html • 0.05 MB
technical_195189.pdf
techsummary_195189.pdf
finance_195189.pdf
BOQ Comparative Chart
xlsx
finsummary_195189.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
Tendernotice_2.pdf
PDF • 0.53 MB
BOQ_195189.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid