Loading…
Loading…
Tender Value
₹5.4 L
EMD Value
₹13,500
Closing Date
2 Jul 2026, 5:00 pmClosed
Divisional Forest Officer, Palakkad
Kallekulangara
Improvement work of Roof Truss work at Kulappully section under Ottapalam Range during 2026-27
2026_FD_857117_1
KFDDO/37765-2026/DFOPKD/D
Open Tender
Civil Works - Others
Item Wise
120 days
Kulappully
Please refer tender notice
8 documents required · 8 mandatory
₹1,100
Yes
₹13,500
Yes
23 Jun 2026
23 Jun 2026
4 Jul 2026
23 Jun 2026
2 Jul 2026
23 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Improvement work of Roof Truss work at Kulappully Section under Ottappalam Range | |||||
| 1.01 | 2.31
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and
saplings of girth up to 30 cm measured at a height of 1 m above ground level and
removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | cum | - | - |
| 1.02 | 2.6.1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)
including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5
m, as directed by Engineer-in-charge.All kinds of soil | 1 | Cum | - | - |
| 1.03 | 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means
in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),
including dressing of sides and ramming of bottoms, lift up to 1.5 m, including
getting out the excavated soil and disposal of surplus excavated soil as directed,
within a lead of 50 m.All kinds of soil | 0.2 | kg | - | - |
| 1.04 | 4.1.8
Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4
coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm
nominal size derived from natural sources) | 1 | kg | - | - |
| 1.05 | 60.7.1
DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry
with good quality blasted rubble including packing to compactness to lines and levels
cost and conveyance of all materials labour charges etc. complete as per direction of
Departmental officers at site | - | cum | 1 | - |
| 1.06 | 7.1.1
Random rubble masonry with hard stone in foundation and plinth including levelling
up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate
20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse
sand) | 1 | sqm | - | - |
| 1.07 | 2.25
Filling available excavated earth (excluding rock) in trenches, plinth, sides of
foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited
layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 1 | sqm | 1 | ₹1 |
| 1.08 | 5.9.6
Centering and shuttering including strutting, etc. and removal of form for:Columns,
Pillars, Piers, Abutments, Posts and Struts | 1 | Mtr | 1 | ₹1 |
| 1.09 | 5.9.5
Centering and shuttering including strutting, etc. and removal of form for:Lintels,
beams, plinth beams, girders bressumers and cantilevers | - | mtr | 1 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.75 MB
priliminaryagreement.pdf
Tender Documents • 0.24 MB
SCHEDULE.pdf
Tender Documents • 0.79 MB
ePayment.pdf
Other Document • 0.01 MB
BOQ_1448804.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .