Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹3.5 L
Closing Date
9 Jul 2026, 5:00 pmDue tomorrow
Executive Engineer
Erection Division, Roorkee
Making Ramp 3 Nos for Temporary Steel truss Foot Bridge No. 1,2 and 3 for Kumbh Mela-2027 at Har ki Pauri Haridwar..
2026_IRDCE_96981_1
05/Nivida/2026-2027 dated 25.06.2026 (Lot No.02)
Open Tender
Miscellaneous Services
30 days
Har KI Pauri
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
Through E Challan Only
₹3.5 L
25 Jun 2026
25 Jun 2026
10 Jul 2026
27 Jun 2026
9 Jul 2026
3 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Making Ramp 3 Nos for Temporary Steel truss Foot Bridge No. 1,2 & 3 for Kumbh mela 2027 at Har ki Pauri Haridwar. | |||||
| 1.01 | Gravel/Soil-Aggregate Base (Table 400.2) Grading A Construction of gravel/soil-aggregate base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller to achieve the desired density, complete as per Technical Specifications Clause 402 for construction of Ramp of Temporary bridge no. 1,2 & 3 at Har ki Pauri, Haridwar for Kumbh Mela 2027 (Ramp 03 No.each size 65m long x 4 m width). | - | cum | 1,723.6 | - |
| 1.02 | Steel work welded in built up sections/ framed work. including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. As required in railings for Ramp of Temporary bridge no. 1,2 & 3 at Har ki Pauri, Haridwar for Kumbh Mela 2027. | - | kg | 138.05 | - |
| 1.03 | Providing & laying of Empty cement bag filled with local sand & tightened using sutli & carriage upto site including prepairing sub grade before placing in position also including supply of material, labour & T&P. | - | Nos | 17.5 | - |
| 1.04 | Hiring of hydraulic excavator 0.90/1.00 cum (1nos x 15days x 8hrs) for preparing of ramp base/Approach road and Dismaintling of 3 nos Ramp each 60 mtr long made up of gravel/Soil- Aggregate Base and M.S railing after completion of Kumbh Mela 2027, including all cost of material, labour, Scaffolding and T&P. | - | hrs | 1,020 | - |
| 1.05 | Labour for dismantling, Loading , Unloading and Stacking etc. as per direction of Engineer-In-Charge | - | Job | 3,34,722 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
SBDRamp.pdf
Tender Documents • 2.44 MB
Drawing.pdf
Other Document • 0.75 MB
BOQ_114550.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid