Loading…
Loading…
Tender Value
₹55.5 L
EMD Value
₹1.1 L
Closing Date
8 Jul 2026, 4:00 pm
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer I-FC Division Kargil
Executive Engineer I-FC Division Kargil
Restoration/construction of water reservoir tank at Mohallah Doks Choskore under Project Revival of existing Rzings/Ponds for District Kargil
2026_PWD_19101_5
e-Tender 10 of 2026-27/INFC Kargil
Open Tender
Civil Works - Canal
120 days
Kargil
Please refer Tender documents.
4 documents required · 4 mandatory
₹560
Payable To Executive Engineer I-FC Division Kargil
₹1.1 L
22 Jun 2026
22 Jun 2026
9 Jul 2026
22 Jun 2026
8 Jul 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by manual means in foundation trench or drains (not exceeding 1.5m in weadth or 10 sqm on plan )including dressing of sides and ramming of bottoms ,lift upto 1.5m ,including getting out the excavated soil and disposal of surplus excavated soil as directed ,within a lead of 50m | |||||
| 1.01 | All Kind of soil 80% | 201.6 | Cum | 431.41 | ₹86,972.26 |
| 1.02 | Ordinary Rock 20% | 50.4 | Cum | 953.68 | ₹48,065.47 |
| 2 | Dumping /Filling of stones in horizontal level including cost of stone | 84 | Cum | 922.14 | ₹77,459.76 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:3:6 (1 cement: 3 coarse sand (zone-III) derioved from natural sources: 6 graded stone aggregate 20mm nominal size derived from natural sources) (Crushed) | 105.87 | Cum | 6,392.04 | ₹6,76,725.27 |
| 4 | Reinforced cement concrete work in wall’s (any thickness) including attached pilasters, buttresses plinth and string courses, fillets columns, pillars piers, abutments, post and struts etc up to floor 5 level excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement 1.5 course sand and 3 graded crushed stone agg. 20mm nominal size. (crushed) | 96 | Cum | 10,742.59 | ₹10,31,288.64 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached
pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,
abutments, posts and struts etc. above plinth level up to floor five level,
excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm
nominal size) (Crushed) | 140 | Cum | 9,247.71 | ₹12,94,679.4 |
| 6 | Reinforcement for RCC works including straightening ,cutting,bending placing in position and binding and all complete.Hot Rolled deformed bars. | 14,061.3 | KG | 103.27 | ₹14,52,110.45 |
| 7Centering and shuttering including strutting, propping etc. and removal form for:-charge | |||||
| 8 | Walls (any thickness) including attached pilasters buttresses, plinth and string course etc. | 421.2 | Sqm | 614.86 | ₹2,58,979.03 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_45526.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid