| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.2 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹16.2 L+₹372.25 (0.02%)Rejected-Finance GRAM POST KARMI KAPKOT DISTRICT BAGESHWAR | BAGESHWAR | UTTARAKHAND | 263619 | L2 | Rejected-Finance Rejected | |
| 3 | L3₹16.2 L+₹453 (0.03%)Rejected-Finance NEAR TELEPHONE EXCHANGE TALLI BAZAR KAPKOTE BAZAR BAGESHWAR DISTRICT BAGESHWAR KAPKOTE BAGESHWAR PIN 263632 | BAGESHWAR | UTTARAKHAND | 263632 | L3 | Rejected-Finance Rejected |
Tender Value
₹16.2 L
EMD Value
₹49,000
Closing Date
22 Feb 2024, 3:00 pmClosed
Superintending Engineer
Superintending Engineer EDC Ranikhet
Construction of new HT and LT line and substation for electrification of village Jatoli C.M. Ghosna under EDD Bageshwar
2024_UPCL9_69217_1
EDC(R)-54/2023-24
Open Tender
Electrical Works
Item Wise
90 days
Bageshwar
as per tender document
2 documents required · 2 mandatory
₹1,180
Executive Engineer
₹49,000
9 Dec 2024
9 Feb 2024
23 Feb 2024
9 Feb 2024
22 Feb 2024
9 Feb 2024
Amount
NON-CENTRALIZED MATERIAL (Supply)
E-clamp for 11 KV
Stay clamp for SP-23 Single end
Stay clamp for SP-23 Double end
Holding clamp for SP-23 without N/B
LT Clamp with N&B ST pole SP-21
LT Clamp with N&B ST pole SP-10
Earth wire clamp for SP-10 with N/B
Stay clamp for SP-21 with Nut & Bolt
Stay clamp for SP-10 with Nut & Bolt
Earth wire clamp for SP-23 with N/B
Earth wire clamp for SP-21 with N/B
PG clamp Rabbit to Rabbit
Shackle Insulator 100x115 mm with N&B
Stay Insulator 65x90 mm
LT spacer single phase three wire
Spacer 3 Phase 4 wire
Bracing clamp Top for SP-23 with N/B
Bracing clamp Bottom for SP-23 with N/B
11 KV Fuse set
MS clamp with N&B for Suspension Clamp
TPMO LT DB Holding Clamp for SP-23 with N&B
AL. Crimping Typer Lugs 70 Sq.mm
LABOUR PART
Chemical Earthing
Erection of Earthing Rod
Fabrication of Steel
excavation of PIT for Stay Set
Erection of LT Stay Set
Erection of 11 KV Stay Set
Grouting of Stay Set
Excavation of PIT for Pole
Erection of Single SP-10 Pole
Erection of Single SP-21 Pole
Erection of Single SP-23 Pole
Erection of SP-23 Double Pole
Grouting of Pole
Muffing of Pole
Painting of SP-10 Pole
Painting of SP-21/23 Pole
Laying of LT PVC Cables (Upto 150 Sqmm)
Inst. Of 25 KVA DTR on Pole Structure
Fixing of TPMO
Fixing of Fuse Set
Fixing of Lightning Arrestor
Laying of rabbit Conductor in HT line
Laying of 3P 4W LT line (Weaserl)
Laying of 1P 2W LT line (Weaserl)
Guarding of LT/11 KV line
Lopping & Chopping of tree Branches
Const. Inst of Danger Board/Number Plate
Cartage SP-10 Pole, 21-50 KM
Cartage SP-10 Pole, 100-150 KM
Cartage SP-21/23 Pole, 21-50 KM
Cartage SP-21/23 Pole, 100-150 KM
Cartage of petty material 21-50 Km
Cartage of petty material 100-150 Km
Cartage of 16/25 KVA DTr, 21-50 Km
Cartage of 16/25 KVA DTr, 100-150 Km
Headload cartage SP-10 Pole(1-3 Km)
Headload cartage SP-21/23 Pole(1-3 Km)
Headload Cartage of material (1-3Km)
Headload Cartage of 25 KVA DTR (0-1Km)
maa bhagwati electricals
G P ENTERPRISES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .