Tender Value
₹3.7 Cr
EMD Value
₹7.3 L
Closing Date
12 Oct 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
WORKS
15 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; whereV= Advertised value of the tender in crores of RupeesN= Number of years prescribed for completion of work for which bids have been invited.The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover.The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
(a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited:(i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or(ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or(iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender.(b)(1)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited:(i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or(ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or(iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b (1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (2)In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity.(3)To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing.However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfillment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows:The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract.Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway.
Note:Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organization, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates.In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Defination of Similar Work :- Any Indoor or/and Outdoor Electrical Signalling work for provision of RRI/PI/EI/MACLS/Track Circuit/Axle Counter/BPAC/Double Distant/ LC gate interlocking/IBH/Automatic Signalling work/Hot standby with provision of Dual VDU.
20 conditions · 7 needing a document upload
Whether the Standard format of the certificate submitted as per Annexure-V &Aneexure - V(A).
If EMD is not deposited online, please submit the BID SECURITY (Bank Guarantee) asper Annexure-VIA of Tender Document attached.
Whether undertaking for not blacklisted submitted as per Annexure - C
Whether undertaking for employment of railway gazetted engineer or officer submittedas per annexure - D
Constitution of the firm and copies of connected legal documents should be submitted.
Whether Power of Attorney is submitted as per clause No. 15 of tender form (secondsheet).
whether tender form (First sheet) submitted as per Annexure-I of tender document.
Whether Documents required for Technical and Financial Eligibility Criteria submitted.
NOTE: The above check list is not exhaustive. The Tenderer must go through carefullythe entire booklet and submit the tender complying with all the conditions/provisions/instructions mentioned therein irrespective of the fact that they have been highlightedin the check list or not.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
S&T portion of work in connection with proposed ROB/LHS at various LC Gates ML- 341, ML-343, ML-345, ML-349, ML-357, ML-360, ML-362, ML-365, ML-390 & ML-440 under ASTE/PSA.
VSKP-SnT-26-27-WORKS-10~SCOR
VSKP-SnT-26-27-WORKS-10
Open
Works - General
12 Months
Visakhapatnam, Andhra Pradesh
₹0
₹7.3 L
18 Sept 2026
18 Sept 2026
28 Sept 2026
273 items across 6 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 2,30,35,148.7 | ||
| — | 5.00 | — | — | ||
| Installation/Alteration/Phase working, Wiring, testing and commissioning of complete Electronic Interlocking System (Distributed/Centralized Configuration System with Hot Standby feature) including transportation from Consignee's depot to site of work. This includes design of logic as per alteration, execution of labour portion, Interface relay wiring, erection of relay racks, fixing of relays and associated work in relay room, proper fixing of Operator VDU Terminals etc (The Relays for interface relays wiring will be supplied by Railways. The Contractor shall supply all other materials required for installation, wiring, testing and commissioning). NOTE: - 1) Installation & commissioning of Electronic Interlocking is as per Section-H, Chapter-08. 2) If it is phase working, other than initial phase design, supply of application logic required for phase working should be done by the Contractor against this item. 3) The work includes manufacture/ fabrication, supply and installation of SM's console and side table extension as per site requirement and as advised by site Engineer to accommodate VDUs, other S&T equipment and SM's stationary for operation of VDUs and execution of day-to-day work for operation of trains. | — | — | — | 65,73,105 | |
| — | 5.00 | — | — | ||
| Factory acceptance test (FAT) with SCoR officials, Only for Subsequent Phase working not for Initial working. | — | — | — | 35,04,185 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TenderdocROBPSA2.pdf
ATTACHMENT
GCCUpdateduptoACS-12.pdf
ATTACHMENT
jpo_jpo.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .