Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44,100Accepted-Finance BHAGWATI NAGAR JAMMU | L1 | Accepted-Finance Submitted relevant documents | |
| 2 | L2₹44,786+₹686 (1.56%)Accepted-Finance | L2 | Accepted-Finance Submitted relevant documents | |
| 3 | L3₹45,374+₹1,274 (2.89%)Accepted-Finance 25 PRATAP COMPLEX GULAB SINGH MARG JAMMU | L3 | Accepted-Finance Submitted relevant documents |
Tender Value
Refer Docs
EMD Value
₹1,000
Closing Date
23 Nov 2020, 2:00 pmClosed
Executive Engineer
Mechanical Irrigation Division Jammu
Repair to 63 KVA electric transformer along with allied works at LIS Chung
2020_IFC_108900_1
MID/J/e-NIT/2020-21/63
Open Tender
Repair and Maintenance Services
Lump-sum
10 days
Chung
Repair to 63 KVA electric transformer along with allied works at LIS Chung
7 documents required · 7 mandatory
₹200
Executive Engineer MID
₹1,000
Yes
jammu
21 Dec 2020
11 Nov 2020
25 Nov 2020
11 Nov 2020
23 Nov 2020
17 Nov 2020
11 Nov 2020 - 23 Nov 2020
13 Nov 2020
Amount
Disconnecting the 63 KVA electric transformer installed at LIS Chung from input and output connection, lowering the transformer from the bed and then loading in mechanical transport by using by using manual labour, chain pulley block and other tools and tackles, shifting to work shop for repairs. Dismantling of the 63 KVA transformer at workshop by way of extracting out the damaged HV coils & LV coils, damaged insulator, rubber gasket, copper nuts and bolts. Complete rewinding of HV legs-03 no. & reconditioning of all the LV legs- 03 no. with a specific wire of appropriate rating. Providing and fitting of new insulator, rubber gasket, new copper nuts and bolts. Lowering of the coils inside the sump of the transformer. Refitting of the top cover. Filling of T-oil after dehydration and filtration and topping up by 70 litres T-oil. Testing the continuity of each phase and putting the transformer on no-load till the required meggar value is obtained. Shifting the repaired electric transformer back to site of installation, unloading and installing the electric transformer on transformer bed with the help of chain pulley block and skilled manual labour, connecting of HT and LT supply by P/F of thimbles to cables of appropriate rating/size. The job includes the cost of material, labour charges loading and unloading, to & fro carriage, installation and testing complete at LIS Chung.
Rebate on Old Parts
M/S RAGHUNATH MECHANICAL AND ELECTRICAL ENGINEERING WORKS
NATIONAL ELECTRO-MECH COMPANY
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .