Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 10 KIRPAL APARTMENT 44 I P EXTENSION EAST DELHI DELHI 110092 | EAST DELHI | DELHI | 110092 | Admitted-Finance |
| 2 | Not Admitted-Finance | Not Admitted-Finance Others-Bidder was disqualified on account of non submission of relevant experience certificate |
| 3 | Not Admitted-Finance 6 SHASTRI MARKET JALANDHAR JALANDHAR PUNJAB 144001 | JALANDHAR | PUNJAB | 144001 | Not Admitted-Finance Others-submitted experience certificate of the log boom titling the scope of work as SITC of log boom along with a ancillaries civil works at Uri-II however the scope of work in our eNIT include surveying design and manufacturing also |
Tender Value
Refer Docs
Closing Date
26 Aug 2021, 4:00 pmClosed
Executive Engineer
Executive Engineer Generation Division LJHP Gantamulla Bla
Survey Design Engineering Fabrication Supply Installation Testing and Commissioning of HDPE Pipe Debris Barrier Boom with pathway at Headworks Barrage LJHP Gantamulla and maintenance of Barrier for three years from the date of commissioning.
2021_SPDC_130461_1
E NIT No 03 of 2021-22 Dated 12.07.2021
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Barrage LJHP Power House
Please refer Tender documents.
6 documents required · 6 mandatory
₹5,000
Yes
Convener, purchase committee, Directorate of ISM
Exempted
4 Dec 2021
12 Jul 2021
28 Aug 2021
13 Jul 2021
26 Aug 2021
13 Jul 2021
Amount
Survey, Design, Engineering of Pipe Boom Barrier (3 HDPE Pipe Type) at LJHP Barrage along with trash guard (Technical Details need to be mentioned in GTP) and anchoring / hooking arrangement of entire barrier with marine polyester ropes as envisaged in scope of work and GTP (complete in all respects) with provision of pathway and its safety arrangement. The barrier shall be engineered to withstand the massive load created due to massive surface water velocities coupled with heavy surface debris and floating trash, high winds and changing water levels and its Fabrication Approximate Barrier Boom Length is 300 Mtrs (+5%)
Earthwork evacuation by manual means over areas (exceeding 30cm and upto 2.5 mtrs in depth, 3 mtrs in width and 4 mtrs length including disposal of excavated earth upto 10 mtr from cutting edge, disposed earth to be levelled and neatly dressed. Hard Rock (Blasting Prohibited)
Providing and fixing 25mm dia 3.0 mtr long grouted anchor bars and providing of anchoring plates on the existing dividing wall to fix all the anchoring ropes from the downstream side of the boom.
Providing and fixing 25mm dia 1.25 mtrs long anchor bars (as per drawing)
Providing & laying in position cement concrete of specific grade excluding the cost of cantering & shuttering 1:2:4 ( 1 cement:2 Coarse Sand 4 graded stone aggregate 20mm nominal size
Centering and shuttering including strutting, propping etc. and then removal.
Reinforcement for RCC works including straightening, cutting, bending, placing in position and bending all complete Thermo Mechanically Treated bars.
Providing and fixing M25 stainless Steel High Strength Bolt 25 dia and 340mm long (Chemically Grouted)
Necessary hooking / safety protection arrangement for entire barrier to avoid overturning of barrier during massive trash accumulation, flooding or during lowering of Reservoir Level, high surface velocity.
Testing and commissioning of entire debris boom barrier
Supply of fiber boat having capacity of four persons and boat size 5rftX20rft with Ores, life jackets (4 jackets per boat), safety tubes( 4 tubes per boat), rope etc.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .