Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.1 LAccepted-AOC | L1 | Accepted-AOC ADMITTED | |
| 2 | L2₹25.5 L+₹1.3 L (5.57%)Rejected-Finance OPEN MARKET BAURARI NEW TEHRI | TEHRI GARHWAL | UTTARAKHAND | 248008 | L2 | Rejected-Finance NOT ADMITTED | |
| 3 | L3₹25.9 L+₹1.7 L (7.25%)Rejected-Finance VILLAGE DIKHOLGAON CHAMBA TEHRI GARHWAL | CHAMBA | HIMACHAL PRADESH | 176207 | L3 | Rejected-Finance NOT ADMITTED |
Tender Value
Refer Docs
EMD Value
₹74,000
Closing Date
7 Mar 2024, 1:00 pmClosed
SE
EDC Tehri
Increasing capacity of 25 KVA to 63 KVA DTRs and construction of associated HT and LT line at village Jakhna, Toli and Tingarh in Chamiyala Section of Bhilangna Block under EDD Tehri (T.G.)
2024_UPCL4_70621_1
77/EDCT/2023-24
Open Tender
Miscellaneous Services
Item Wise
90 days
Bhilangna
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
Yes
EE TEST
₹74,000
Yes
30 Sept 2024
29 Feb 2024
7 Mar 2024
29 Feb 2024
7 Mar 2024
29 Feb 2024
Electrical Items :
Holding Clamp J-I hook for AB cable
STAY CLAMP FOR SP-21 WITH NUT & BOLT
STAY CLAMP FOR SP-10 WITH NUT & BOLT
DEAD END CLAMPS WITH I HOOK AND N/B INS
Susp. Clamp With I Hook (Ins.),Clamp,N&B
Piercing Connector 16-16sqmm
Head shrink type end caps for LT ABC
Piercing Connector 70 Sq.mm-70Sq.mm
INSULATED PIERCING CONNECTOR 50-50 SQ.MM
LConnecting Cable ABC to DB 1x25mm²
LT AB Cable 3x70+1x50 sqmm
LT XLPE AB CABLE 1CX16+25 SQ.MM.
LT AB CABLE 3CX50+1X35 SQ.MM
LT DISTRIBUTION BOX 1 PHASE
LT DISTRUBITON BOX 3 PHASE
AL CRIMPING TYPE LUGS 25 SQ.mm
LABOUR (SERVICES)
CHEMICAL EARTHING
ERECTION OF EARTHING ROD
EXCAVATION OF PIT FOR STAY SET
ERECTION OF LT STAY SET
GROUTING OF STAY SET
EXCAVATION OF PIT FOR POLE
ERECTION OF SINGLE SP-10 POLE
ERECTION OF SINGLE SP-21 POLE
GROUTING OF POLE
DISMANTLING OF SP-10 SINGLE POLE
DISMANTLING OF SP-21/SP-23 SINGLE POLE
DISMANTLING OF LT LINE 1 P 2 W(WEASEL)
DISMANTLING OF LT LINE 3 P 4 W(WEASEL)
DISMANTLING OF 25 KVA DTR
INST. OF 63 KVA DTR ON POLE STRUCTURE
FIXING OF TPMO
FIXING OF LIGHTNING ARRESTOR
LOPPING & CHOPPINGOF TREE BRANCHES
CARTAGE SP-10 POLE, 150-200KM
CARTAGE SP-21/23 POLE, 150-200KM
CARTAGE OF PETTY MATERIAL,150-200KM
CARTAGE OF 16/25 KVA DTR, 100-150KM
CARTAGE OF 63 KVA DTR, 150-200KM
HEADLOAD CARTAGE SP-10 POLE(0-1 KM)
HEADLOAD CARTAGE SP-21/23 POLE(0-1 KM)
HEADLOAD CARTAGE OF MATERIAL(0-1 KM)
HEADLOAD CARTAGE OF 25 KVA DTR(0-1 KM)
HEADLOAD CARTAGE OF 63 KVA DTR(0-1 KM)
DISCONNECTION & RECONNECTION OF CONsumer
LAYING OF LT AB CABLE 3X70+1X50 SQMM
Installation of LT DB 1 Ph for LT AB
Installation of LT DB 3 Ph for LT AB Cab
Laying of AB Cable 1x16+25 mm
Fixing of heat Shrink Cap for AB Cable
BACK CARTAGE OF PETTY MATERIAL,100-150KM
BACK HEAD LOAD CART. OF PETTY MAT. 0-1KM
LAYING OF LT AB CABLE 3CX50+1X35
M/s R R Associates
MS POWER DESIGN
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .