Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3240.8 CrAdmitted-Finance | ₹3240.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹3460.6 Cr+₹219.8 Cr (6.78%)Admitted-Finance PLOT NO 21 INSTITUTIONAL AREA SECTOR 44 GURUGRAM HARYANA 122002 | GURUGRAM | HARYANA | 122002 | ₹3460.6 Cr+₹219.8 Cr (6.78%) | L2 | Admitted-Finance |
| 3 | L3₹3642.7 Cr+₹401.9 Cr (12.4%)Admitted-Finance | ₹3642.7 Cr+₹401.9 Cr (12.4%) | L3 | Admitted-Finance |
| 4 | L4₹3830.9 Cr+₹590.2 Cr (18.2%)Admitted-Finance 1 11 252 1B BEHIND SHOPPERS STOP BEGUMPET HYDERABAD 500016 | HYDERABAD | HYDERABAD | TELANGANA | 500016 | ₹3830.9 Cr+₹590.2 Cr (18.2%) | L4 | Admitted-Finance |
| 5 | L5₹4217.9 Cr+₹977.2 Cr (30.2%)Admitted-Finance | ₹4217.9 Cr+₹977.2 Cr (30.2%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Linkwell Telesystems Pvt Ltd L4 | HPL Electric & Power Limited L6 | Genus Power Infrastructures Limited L7 | Gridcrest Technologies Pvt Ltd L1 | Adani Energy Solutions Limited L10 | KIMBAL PRIVATE LIMITED L3 | NCC LIMITED L8 | Secure Meters Limited L9 | ALLIED ENGINEERING WORKS LIMITED L5 | Infinite Computer Solutions (India) Limited L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Supply, Configuration, Testing, Calibration & Operationalization (excluding physical installation) of Smart Meters along with accessories under Phase II, inclusive of 7 years OEM warranty (from date of commissioning). | |||||||||||||
| 1.10 | 1 Phase Whole Current Smart Meter (with Net-Metering) LT Meter: 5 – 30 A | 32,50,000 | Nos | 8,06,55,57,500 ₹8,06,55,57,500 | 6,99,80,62,500 ₹6,99,80,62,500 | 7,03,62,50,000 ₹7,03,62,50,000 | 6,32,49,22,500 ₹6,32,49,22,500 | 13,61,10,00,000 ₹13,61,10,00,000 | 7,05,25,00,000 ₹7,05,25,00,000 | 9,33,48,77,500 ₹9,33,48,77,500 | 14,13,75,00,000 ₹14,13,75,00,000 | 7,47,50,00,000 ₹7,47,50,00,000 | 5,92,24,10,000 ₹5,92,24,10,000 Lowest |
| 1.20 | 3 Phase Whole Current Smart Meter (with Net-Metering) LT Meter: 10 – 60 A | 16,80,000 | Nos | 6,44,44,29,600 ₹6,44,44,29,600 | 5,72,06,52,000 ₹5,72,06,52,000 | 5,77,92,00,000 ₹5,77,92,00,000 | 5,12,40,00,000 ₹5,12,40,00,000 Lowest | 9,85,32,00,000 ₹9,85,32,00,000 | 5,62,80,00,000 ₹5,62,80,00,000 | 7,07,66,80,800 ₹7,07,66,80,800 | 10,66,80,00,000 ₹10,66,80,00,000 | 5,49,36,00,000 ₹5,49,36,00,000 | 5,13,82,96,800 ₹5,13,82,96,800 |
| 1.30 | 3 Phase LT-CT operated Smart Meter (with Net-Metering) -/5A, Accuracy class 0.5S | 70,000 | Nos | 26,54,09,900 ₹26,54,09,900 | 23,46,68,700 ₹23,46,68,700 | 26,25,00,000 ₹26,25,00,000 | 22,05,00,000 ₹22,05,00,000 | 43,19,00,000 ₹43,19,00,000 | 23,45,00,000 ₹23,45,00,000 | 31,75,80,900 ₹31,75,80,900 | 45,50,00,000 ₹45,50,00,000 | 27,13,20,000 ₹27,13,20,000 | 21,40,95,700 ₹21,40,95,700 Lowest |
| 2.00Communication Network Infrastructure & Connectivity for the project area, including Supply of all hardware equipment and integrated software components/ associated accessories required for the successful establishment and operation of communication network inclusive of 7 years OEM warranty (from date of commissioning). | |||||||||||||
| 2.10 | Planning, Supply, Setup, Testing and Commissioning of RF Communication Network Infrastructure & Connectivity consisting of DCU/Gateways etc. (inclusive of 7 years OEM warranty) as required for the successful establishment of connectivity for all Smart Meters feasible as per design proposed by bidder. | 1 | LS | 12,84,62,167 ₹12,84,62,167 Lowest | - | 13,21,18,500 ₹13,21,18,500 | - | - | 76,40,16,862.07 ₹76,40,16,862.07 | 41,12,94,758.83 ₹41,12,94,758.83 | - | - | 1,34,43,73,333.33 ₹1,34,43,73,333.33 |
| 3.00Unified Head End System software (HES), NMS and other software | |||||||||||||
| 3.10 | Supply, installation, integration, testing and commissioning of HES, NMS and other related software applications, including perpetual licenses for Operating Systems, Database and Applications with 1 year warranty, for 50,00,000 users/ consumers/ smart meters | 1 | LS | 6,60,61,720 ₹6,60,61,720 | 13,31,64,146.52 ₹13,31,64,146.52 | 6,00,00,000 ₹6,00,00,000 | 18,50,00,000 ₹18,50,00,000 | 22,50,00,000 ₹22,50,00,000 | 10,00,000 ₹10,00,000 Lowest | 44,47,77,452.74 ₹44,47,77,452.74 | 1,50,00,000 ₹1,50,00,000 | 2,00,00,000 ₹2,00,00,000 | 25,71,83,360 ₹25,71,83,360 |
| 3.20 | Configuration, customization, business process/ systems integration with existing MDMS and any other Legacy Utility Applications, Ticketing tool, Consumer Portal, development of Analytics Reports, SLA dashboard etc. as necessary for successful operation of this project | 1 | LS | 3,10,49,008 ₹3,10,49,008 | 1,66,45,518.36 ₹1,66,45,518.36 | 4,00,00,000 ₹4,00,00,000 | 1,10,00,000 ₹1,10,00,000 | 13,50,00,000 ₹13,50,00,000 | 10,00,000 ₹10,00,000 Lowest | 21,61,40,551.96 ₹21,61,40,551.96 | 1,96,00,000 ₹1,96,00,000 | 1,00,00,000 ₹1,00,00,000 | 12,85,91,680 ₹12,85,91,680 |
| 3.30 | Design, Development & Deployment of allied IT applications as required by KSEBL for performance monitoring & execution of entire project.(Meter & SIM inventory Management, Smart Meter Installation & Consumer Indexing (WFM), SLA monitoring tool, etc.) | 1 | LS | 3,17,09,626 ₹3,17,09,626 | 2,66,32,829.34 ₹2,66,32,829.34 | 50,00,000 ₹50,00,000 | 11,76,000 ₹11,76,000 | 15,30,00,000 ₹15,30,00,000 | 10,00,000 ₹10,00,000 Lowest | 14,68,08,957.35 ₹14,68,08,957.35 | 36,00,000 ₹36,00,000 | 1,00,00,000 ₹1,00,00,000 | 12,85,91,680 ₹12,85,91,680 |
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
11 May 2026, 5:00 pmClosed
Chief Engineer IT CR and CAPs
office of the chief engineer IT CR and CAPs Vydyuthi Bhavanam Pattom Trivandrum
m Integration Operation and Maintenance of Smart Meters and allied software and communication infrastructure as part of AMI Project in KSEBL Phase II
2026_KSEB_828557_1
CEIT/SM-Phase II/KSEBL/2025-26/05 dated 17-01-2026
Open Tender
Miscellaneous Services
Supply and Service
2880 days
Kerala
please refer tender document
5 documents required · 5 mandatory
₹17,700
Yes
₹5 L
Yes
Vydyuthi Bhavanam Trivandrum
5 Sept 2026
5 Feb 2026
15 May 2026
5 Feb 2026
11 May 2026
16 Mar 2026
25 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Supply, Configuration, Testing, Calibration & Operationalization (excluding physical installation) of Smart Meters along with accessories under Phase II, inclusive of 7 years OEM warranty (from date of commissioning). | |||||
| 1.1 | 1 Phase Whole Current Smart Meter (with Net-Metering) LT Meter: 5 – 30 A | 32,50,000 | Nos | - | - |
| 1.2 | 3 Phase Whole Current Smart Meter (with Net-Metering) LT Meter: 10 – 60 A | 16,80,000 | Nos | - | - |
| 1.3 | 3 Phase LT-CT operated Smart Meter (with Net-Metering) -/5A, Accuracy class 0.5S | 70,000 | Nos | - | - |
| 2Communication Network Infrastructure & Connectivity for the project area, including Supply of all hardware equipment and integrated software components/ associated accessories required for the successful establishment and operation of communication network inclusive of 7 years OEM warranty (from date of commissioning). | |||||
| 2.1 | Planning, Supply, Setup, Testing and Commissioning of RF Communication Network Infrastructure & Connectivity consisting of DCU/Gateways etc. (inclusive of 7 years OEM warranty) as required for the successful establishment of connectivity for all Smart Meters feasible as per design proposed by bidder. | 1 | LS | - | - |
| 3Unified Head End System software (HES), NMS and other software | |||||
| 3.1 | Supply, installation, integration, testing and commissioning of HES, NMS and other related software applications, including perpetual licenses for Operating Systems, Database and Applications with 1 year warranty, for 50,00,000 users/ consumers/ smart meters | 1 | LS | - | - |
| 3.2 | Configuration, customization, business process/ systems integration with existing MDMS and any other Legacy Utility Applications, Ticketing tool, Consumer Portal, development of Analytics Reports, SLA dashboard etc. as necessary for successful operation of this project | 1 | LS | - | - |
| 3.3 | Design, Development & Deployment of allied IT applications as required by KSEBL for performance monitoring & execution of entire project.(Meter & SIM inventory Management, Smart Meter Installation & Consumer Indexing (WFM), SLA monitoring tool, etc.) | 1 | LS | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.52 MB
RFP.pdf
Tender Documents • 3.63 MB
BOQ_1402242.xls
BOQ • 0.41 MB
Corrigendum11.pdf
PDF • 0.17 MB
Corrigendum10.pdf
PDF • 0.16 MB
Corrigendum9.pdf
PDF • 0.23 MB
Corrigendum8.pdf
PDF • 0.15 MB
Corrigendum7.pdf
PDF • 0.19 MB
Corrigendum6.pdf
PDF • 0.14 MB
Corrigendum5.pdf
PDF • 0.19 MB
Corrigendum3.pdf
PDF • 0.15 MB
corrigendum2.pdf
PDF • 0.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .