Loading…
Loading…
Tender Value
₹24.2 L
EMD Value
₹48,315
Closing Date
20 Aug 2026, 3:00 pmClosed
Executive Engineer
O/o The EE, mohanpur Division, PWD(R and B)
Development of road from Shalbagan Bazar to CPWD office gate during the year 2026-27/SH- Grouting, Carpeting, Seal Coat etc.(L-0.785km)
2026_CEPWD_75737_1
14/DNIT/EE/MNP/PWD(r n b)/2026-27
Open Tender
Repair and Maintenance Services
Percentage
Mohanpur
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
₹48,315
20 Aug 2026
12 Aug 2026
20 Aug 2026
12 Aug 2026
20 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Maintenance of Earth Shoulder (stripping excess soil).
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawing and MoRD technical specification Clause 1903. | 1,570 | Sqm | 19.1 | ₹29,987 |
| 2 | "Patch repairing/ Maintenance of bituminous surface road using Jhama brick aggregate & Viscocity Graded bitumen (VG-30)
Repairing pot-holes and making up small depressions with ramming or power rolling after removal/ disposal of disintegrated materials within a lead of 50 m, cutting pot holes to regular shapes with vertical edges and levelling the bottom, cleaning the same with compressed air or any other appropriate method including screening, cleaning of aggregates; and filling up with with jhama chips using bitumen of VG-30 @ 54 kg per m3 of loose volume of jhama brick chips, after applying tack coat of bitumen on sides and bottom @ 0.75 kg/ sqm and finishing the top of repaired surface levelled with adjoining area in proper grade and camber including spreading of sand @ 0.006 cum/ sqm of prepared road surface as per direction of the Engineer-in-Charge and all as per MoRD technical specification Clauses 1900, 502, 503 and 504." | 1 | Cum | 11,274.6 | ₹11,263.33 |
| 3 | "Tack coat using hot straight run bitumen of grade VG-30 on Bituminous surface.
Providing and applying tack coat using hot straight run bitumen of grade VG-30, including heating the bitumen, spraying the bitumen, cleaning and preparing the existing road surface as per Specification: On bituminous surface @0.50kg/sqm. " | 4,317.5 | Sqm | 41 | ₹1,77,017.5 |
| 4 | "25 mm thick Open-Graded Premix Carpet using Bituminous (Viscosity grade/modified bitumen) binder
Providing, laying and rolling of open-graded premix carpet of 25 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using Viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base , including mixing in a suitable plant, laying and rolling with a three wheel 80 - 100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 508.
A) By mechanical means.
I) Bitumen VG-30" | 4,317.5 | Sqm | 404 | ₹17,44,270 |
| 5 | "Seal Coat
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 510.
A) By manual means.
I) Type D (premix with fine sand)
a) Bitumen (60/70 Grade) VG-30 | 4,317.5 | Sqm | 77.1 | ₹3,32,879.25 |
stage.html
html • 0.01 MB
finance_77097.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_77097.xls
BOQ • 0.34 MB
d.pdf
Tender Documents • 2.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .