Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74.6 LAccepted-Finance 27TH TO 32ND FLOOR TOWER 3 INDIABULLS FINANCE CENTRE SENAPATI BAPAT MARG ELPHINSTONE ROAD WEST | ₹74.6 L | L1 | Accepted-Finance L1 bidder |
| 2 | L2₹98.7 L+₹24.1 L (32.2%)Accepted-Finance 323 333 THIRD FLOOR BLOCK F INTERNATIONAL TRADE TOWER NEHRU PLACE NEHRU PLACE NEW DELHI SOUTH DELHI DELHI 110019 UDYAM DL 08 0051265 | SOUTH EAST DELHI | DELHI | 110019 | ₹98.7 L+₹24.1 L (32.2%) | L2 | Accepted-Finance L2 bidder |
Tender Value
Refer Docs
EMD Value
₹1.9 L
Closing Date
24 May 2024, 3:30 pmClosed
SE CANDP 2
SE CANDP 2 PTCUL Dehradun
Appointment of consulting firm for Advisory support of Consultant for preparation and approval of Multi Year Tariff and Business Plan for the control period FY 2025-26 to FY 2027-2028 of PTCUL and SLDC separately
2024_PTCU4_71125_1
PTCUL/CandP-II/ARR-11/2023-24
Open Tender
Consultancy
Item Rate
1278 days
Dehradun
Please refer Tender documents.
6 documents required · 6 mandatory
₹5,900
MD PTCUL
₹1.9 L
Dehradun
29 Nov 2024
8 Mar 2024
25 May 2024
8 Mar 2024
24 May 2024
28 Mar 2024
21 Mar 2024
Amount
Tariff Petition (ARR) for the control period FY 2025-26 to FY 2027-2028 of PTCUL (Assignment – A):-
Preparation of draft Business Plan for the control period FY 2025-26 to FY 2027–28 of PTCUL for approval by the BoD/ Audit Committee/Audit Committee of PTCUL including presentation before the BoD/ Audit Committee/ Audit.
Preparation of final Business Plan for the control period FY 2025-26 to FY 2027–28 of PTCUL after incorporation of amendments as may be desired by the BoD/ Audit Committee/ Audit Committee .
Preparation of draft MYT Petition of PTCUL for determination of ARR/Tariff for each year of control period along with review of control period ending on 31.03.2025 and true-up of previous year (FY 2023-24) as provided in the Regulation for approval of the BoD/ Audit Committee of PTCUL including presentation before the BoD/ Audit Committee of PTCUL.
Preparation of final MYT Petition of PTCUL for determination of ARR/Tariff for each year of control period along with review of control period ending on 31.03.2025 and true-up of previous year (FY 2023-24) as provided in the Regulation after incorporation of desired amendments, if any, as may be directed by the BoD/ Audit Committee of PTCUL
Preparation of draft Annual Performance Review (APR) and ARR/ Tariff Petition of PTCUL for second year (FY 2026-27) of control period alongwith true-up of previous Financial year for approval by the BoD including presentation before the BoD.
Preparation of Final Annual Performance Review (APR) and ARR/ Tariff Petition of PTCUL for second year (FY 2026-27) of control period alongwith true-up of previous Financial year after incorporation of desired changes, if any, as may be directed by the Board.
Preparation of draft Annual Performance Review (APR) and ARR Tariff Petition of PTCUL for third year (FY 2027-28) of control period alongwith true-up of previous Financial year for approval by the BoD including presentation before the BoD.
Preparation of final Annual Performance Review (APR) and ARR Tariff Petition of PTCUL for third year (FY 2027-28) of control period alongwith true-up of previous Financial year after incorporation of desired changes, if any, as may be directed by the Board.
Analysis of the final Tariff approval by the Commission for the control period of:- FY 2025-26, FY 2026-27 and FY 2027-28, Along with presentation before the BOD/ AUDIT COMMITTEE/ PTCUL, if desired by PTCUL
If Required, subsequently drafting and to finalise Review Petitions/ Appeals for each year of control period i.e.:- FY 2025-26, FY 2026-27 and FY 2027-28, Before Hon’ble UERC/APTEL/Courts, PTCUL shall file Review Petitions/ Appeals through its advocate (if desired by PTCUL).
Tariff Petition (ARR) for the control period FY 2025-26 to FY 2027-2028 of SLDC (Assignment -B)
Preparation of draft Business Plan for the control period FY 2025-26 to FY 2027–28 of SLDC for approval by the BoD/ Audit Committee/Audit Committee of PTCUL including presentation before the BoD/ Audit Committee/ Audit Committee.
Preparation of final Business Plan for the control period FY 2025-26 to FY 2027–28 of SLDC after incorporation of amendments as may be desired by the BoD/ Audit Committee/ Audit Committee.
Preparation of draft MYT Petition of SLDC for determination of ARR/Tariff for each year of control period along with review of control period ending on 31.03.2025 and true-up of previous year (FY 2023-24) as provided in the Regulation for approval of the BoD/ Audit Committee of PTCUL including presentation before the BoD/ Audit Committee of PTCUL.
Preparation of final MYT Petition of SLDC for determination of ARR/Tariff for each year of control period along with review of control period ending on 31.03.2025 and true-up of previous year (FY 2023-24) as provided in the Regulation after incorporation of desired amendments, if any, as may be directed by the BoD/ Audit Committee of PTCUL.
Preparation of draft Annual Performance Review (APR) and ARR/ Tariff Petition of SLDC for second year (FY 2026-27) of control period alongwith true-up of previous Financial year for approval by the BoD including presentation before the BoD.
Preparation of Final Annual Performance Review (APR) and ARR/ Tariff Petition of SLDC for second year (FY 2026-27) of control period alongwith true-up of previous Financial year after incorporation of desired changes, if any, as may be directed by the Board.
Preparation of draft Annual Performance Review (APR) and ARR Tariff Petition of SLDC for third year (FY 2027-28) of control period alongwith true-up of previous Financial year for approval by the BoD including presentation before the BoD.
Preparation of final Annual Performance Review (APR) and ARR Tariff Petition of SLDC for third year (FY 2027-28) of control period alongwith true-up of previous Financial year after incorporation of desired changes, if any, as may be directed by the Board.
Analysis of the final Tariff approval by the Commission for the control period of:- FY 2025-26, FY 2026-27 and FY 2027-28, Along with presentation before the BOD/ AUDIT COMMITTEE/ PTCUL, if desired by PTCUL.
If Required, subsequently drafting and to finalise Review Petitions/ Appeals for each year of control period i.e.:- FY 2025-26, FY 2026-27 and FY 2027-28, Before Hon’ble UERC/APTEL/Courts, PTCUL shall file Review Petitions/ Appeals through its advocate (if desired by PTCUL).
Preparation/Presentation of write up incorporating, the expert Professional advice regarding the pros and cons of the recent UERC Regulations, amendments (Assignment - C)
Preparation/presentation of write up incorporating the expert professional advice regarding the pros and cons of the draft Regulations/recent UERC Regulations/ Amendments, etc. and its applicability in the interest of the Corporation, as required from time to time before the higher authorities of PTCUL for FY 2025-26, FY 2026-27 & FY 2027-28
MERCADOS ENERGY MARKETS INDIA PRIVATE LIMITED
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .