Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹61.8 LAccepted-AOC | 1 | Accepted-AOC AS PER TENDER | |
| 2 | 2₹73.1 L+₹11.3 L (18.2%)Rejected-AOC GROUND FLOOR NEAR BASIC SCHOOL SHOBHNATHPUR KAHALGAON BHAGALPUR BIHAR BHAGALPUR BIHAR 813203 | BHAGALPUR | BIHAR | 813203 | 2 | Rejected-AOC AS PER TENDER | |
| 3 | 3₹79.2 L+₹17.4 L (28.1%)Rejected-AOC | 3 | Rejected-AOC AS PER TENDER | |
| 4 | 4₹79.7 L+₹17.9 L (29.0%)Rejected-AOC 0 M S PRATIBHA CONSTRUCTION COMPANY MAKHDOOM NAGAR MAKHDOOM NAGAR TANDA AMBEDKAR NAGAR UTTAR PRADESH 224190 | AMBEDKAR NAGAR | UTTAR PRADESH | 224190 | 4 | Rejected-AOC AS PER TENDER | |
| 5 | 5₹85.0 L+₹23.2 L (37.6%)Rejected-AOC | 5 | Rejected-AOC AS PER TENDER |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
28 Sept 2020, 3:00 pmClosed
P.K. SAHOO, DGM(CS),SSC(ER-II)
SSC ER II Talcher Super Thermal Power P.O. DEEPSHIKHA ANGUL 759147
Biennial Maintenance Contract for Application of insulation in Boiler,Turbine and other area at 3 X 250 MW (750 MW) NTPC-BgTPP, at Salakati,Kokrajhar, Assam.
2020_NTPC_41367_1
NTPC/SSC - ER-II(T. Kaniha)/9900208608
Limited
Serv - Others
Service
365 days
BONGAIGAON THERMAL POWER PROJECT
6 documents required · 6 mandatory
₹0
₹1 L
Yes
29 Sept 2020
12 Sept 2020
29 Sept 2020
12 Sept 2020
28 Sept 2020
12 Sept 2020
12 Sept 2020 - 17 Sept 2020
BMC for Insulation works
Safety Compliance
M/S PCK SINGH
LALAN CONSTRUCTION
PRATIBHA CONSTRUCTION COMPANY
CHAMAN ASSOCIATES
vidhu engineering and construction co
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .