O/O EXECUTIVE OFFICER, CHAMPUA NAC
O/O EXECUTIVE OFFICER, CHAMPUA NAC
Construction of Retaining wall Back side of New Kalyan Mandap at ward no-10 by Champua NAC
2026_ORULB_125162_5
EOCHAMPUANAC-NO-60/2025-26
Open Tender
Civil Works - Others
Percentage
120 days
CHAMPUA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹16,947
Yes
29 Jan 2026
29 Jan 2026
11 Feb 2026
29 Jan 2026
9 Feb 2026
29 Jan 2026
29 Jan 2026 - 6 Feb 2026
Double under reamed pile foundation with R.C.C(1:1.5;3) using 12mm chips including cost of bore holes but excluding cost of rod with all complete (300mm dia & 6m long pile ) As per Direction of Eic
Earth work in excavation of foundation in hard soil or Gravelly soil within 50 m initial lead & 1.50 m initial lift including levelling & dressing the bed & lifting the excavated materials within 50 m lead clear from work site including cost of all labour, T & P, cess etc. all taxes complete .
Filling sand in foundation & plinth well watered & rammed including cost , conveyance to site , royalty , cess etc all taxes of all materials & cost of all labour complete
C.C. ( 1 : 4: 8) using 40 mm size (H.B) metal free from weathered skin & all foreign materials including lowering, laying the concrete, watering and curing etc. and including cost , conveyance to site , royalty , cess etc. all taxes of all materials & cost of all labour complete .
R.C.C. work in M 20 grade of concrete using 20 mm & down graded size hg chips including hoisting & laying the concrete,watering and curing etc.complete to required levels laid in layer including cost,conveyance to site , royalty , cess etc. all taxes of all materials & cost of all labour complete As per Direction of Eic.
Rigid and smooth centering and shuttering for foundation and Plinth bend and footing bases including false works and dismentalingthen after casting including cost of materials complete. A)Pile/Beam
Suplying , fitting & placing in position uncoated HYSD bar reinforcement for RCC work including cutting ,bending ,binding & placing in position including cost & conveyance to site,cess etc. all taxes of MS/ TS Rod & binding wire 18to 20 gauge etc.all complete .
Borrow of excavated Earth for filling away from sites as per the direction of Engg-in-charge.
Supplying all labour , T & P , etc. for preparation of Display Board including painting , writing & fixed in position at proper place & Provision Photto graphs at different stage of execution of the work including cost of all materials, labour cess etc. & cost of all labour complete .
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
DTCN.pdf
Tender Documents • 0.75 MB
BOQ_578109.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .