| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 CrAdmitted-Finance | ₹5.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.9 Cr+₹22.2 L (3.90%)Admitted-Finance IN FRONT OF MPPEDC OFFICE NEAR AKASHWANI SHAHDOL MP 484001 | SHAHDOL | SHAHDOL | MADHYA PRADESH | 484001 | ₹5.9 Cr+₹22.2 L (3.90%) | L2 | Admitted-Finance |
| 3 | L3₹6.5 Cr+₹86.8 L (15.3%)Admitted-Finance | ₹6.5 Cr+₹86.8 L (15.3%) | L3 | Admitted-Finance |
| 4 | L4₹6.9 Cr+₹1.2 Cr (21.5%)Admitted-Finance SONBHADRA UTTAR PRADESH 231222 INDIA | SONBHADRA | UTTAR PRADESH | 231222 | ₹6.9 Cr+₹1.2 Cr (21.5%) | L4 | Admitted-Finance |
| 5 | L5₹7.0 Cr+₹1.3 Cr (23.0%)Admitted-Finance | ₹7.0 Cr+₹1.3 Cr (23.0%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | BASANT ENGINEERING CO. L1 | Ashish Enterprises L2 | M/S Pahalwan Construction L3 | M/s K.S ENGINEERING L4 | BRILLIANT ELECTRICALS L5 | M/S B. B. KAR L6 | CENU ENGINEERINGWORKS L7 | KRISHNA ENGINEERING WORKS L8 | M.J.ENTERPRISES L9 | TECHNOCARE ENGINEERS L10 | GURUNANAK CONSTRUCTIONS L11 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 10.00O/H & MAINT. OF ST#1 ASH HANDLING SYSTEM | ||||||||||||||
| 10.00 | S/Conveyor(<>)-OH | 3 | NO | - | - | - | - | - | - | - | - | - | - | - |
| 10.00 | C/Grinder(<=210MW#)-OH | 12 | NO | - | - | - | - | - | - | - | - | - | - | - |
| 10.00 | BAH Gate(<=210MW#)-OH | 12 | NO | - | - | - | - | - | - | - | - | - | - | - |
| 10.00 | BA Hopper (SEALPLATE) Repl | 24 | NO | - | - | - | - | - | - | - | - | - | - | - |
| 10.00 | BAH Gate (POWER CYLINDER) OH | 3 | NO | - | - | - | - | - | - | - | - | - | - | - |
| 10.00 | BA Hopper (REFRACTORY) OH | 240 | MT | - | - | - | - | - | - | - | - | - | - | - |
| 10.00 | BA Hopper (NOZZLES) Repair | 4 | NO | - | - | - | - | - | - | - | - | - | - | - |
| 10.00 | BA Hopper (SEALPLATE) Instal/Remove | 3 | NO | - | - | - | - | - | - | - | - | - | - | - |
| 10.00 | Buffer Hopper (<>) Painting | 3 | NO | - | - | - | - | - | - | - | - | - | - | - |
Tender Value
₹5.0 Cr
EMD Value
₹10 L
Closing Date
16 Dec 2019, 5:00 pmClosed
Ms Reshu SinghManager(SSC-Sipat-CONTRACTS)
SSC-WR-II, Office-Sipat - 495555
COMBINED CONTRACT FOR OH and MAINT. OF STG-1,2 and 3 AND BPH ASHHANDLING SYSTEM FOR 2019-21 AT NTPC KORBA
2019_NTPC_27197_1
NTPC/SSC - WR-II(Sipat)/9900189465
Open Tender
Serv - Others
Service
730 days
SSC-WR-II, Office-Sipat - 495555
As per tender documents
8 documents required · 8 mandatory
₹3,375
Yes
NTPC Limited
₹10 L
Yes
24 Jan 2020
27 Nov 2019
19 Dec 2019
27 Nov 2019
16 Dec 2019
27 Nov 2019
27 Nov 2019 - 9 Dec 2019
O/H & MAINT. OF ST#1 ASH HANDLING SYSTEM
S/Conveyor(<>)-OH
C/Grinder(<=210MW#)-OH
BAH Gate(<=210MW#)-OH
BA Hopper (SEALPLATE) Repl
BAH Gate (POWER CYLINDER) OH
BA Hopper (REFRACTORY) OH
BA Hopper (NOZZLES) Repair
BA Hopper (SEALPLATE) Instal/Remove
Buffer Hopper (<>) Painting
ACI Ash Line (Dia>6"-12") ROTATION
MS Piping (Dia>6"-12") Attend Defect
Fluidising Pads (<>) Serv
COLLECTOR TANK (<>) INSPECTION
Flushing App (<>) OH
Ash Slurry P/P (Dia>12") OH
Ash Slurry P/P(Dia>12")-Repl
Elec Hoists (>03-05MT) OH
S/Conveyor (TENSIONING STN) Repl
S/Conveyor (HEAD SHAFT) Repl
S/Conveyor (GUIDE CHANEL) Repl
Return Idlers (<>) Repl
S/Conveyor (TENSIONING STN) Attend Defec
S/Conveyor (SCRAPPER BARS) OH
S/Conveyor (CHAIN) Jointing
C/Grinder (<=210MW#) Repl
Gear Boxes (H1-200) OH
Fluid Cplg (PST) OH
C/Grinder (<=210MW#) ALIGNING
Ash Valves (DEFLECTOR CONE) Repl
Ash Valves (Dia>6"-12") OH
Ash Valves(Dia>12")-Attend Defect
MATL (MISC) Fabrication
Vac Pp/ Blwr(>20NM3)-OH
Vac Pp/ Blwr (>20NM3) Repl
ACI Ash Line (Dia>6"-12") WATER WASHING
STRAINER/FILTER (100NB) Cleaning
Misc Works (<>) Attend Defect
MISC WORKS (<>) INSPECTION
MS Piping (NB150) Repl
Fluid Cplg (<>) OH
Fluid Cplg (<>) Repl
Submersible Pumps (<>) OH
HP Water Pump (<>) OH
ESP/Area (FIELDS) Serv
LP Valves (Dia<=6") Serv
KNIFE GATE V/V (<>) REPL DMGD ITEM:001
SCAFFOLDING (<>) Instal/Remove
maint of ash/water line & inspection I/B
MS Piping (NB300) Repl
MS Ash Line (Dia>12") Repl
MS Ash Line (Dia>6"-12") ROTATION
MS Ash Line (Dia>12") ROTATION
MS Ash Line(Dia>12")-Attend Defect
MS Ash Line (Dia>12") Repair
Bends/Laterals (Dia>12") Fabrication
MS Piping (450NB) Choking Removal
MS Ash Line (Dia>12") PATROLLING
PIPE CPLG (GASKET) Repl
REIMB. OF CELL PHONE RECHARGE VOUCHER
Misc Works (<>) WELDING
CB Ash Pipe(Dia>12")-Repl
O/H & MAINT. OF ST#2 BA AREA
S/Conveyor (HEAD SHAFT) Serv
S/Conveyor (DRIVE SHAFT) Serv
S/Conveyor (SCRAPPER BARS) Repl
S/Conveyor (SCRAPPER BARS) REFURBISHING
S/Conveyor (SCRAPPER BARS) 24W Chks
S/Conveyor (UPR DECK) OH
S/Conveyor (LWR DECK) OH
S/Conveyor (CHAIN) Repl
S/Conveyor (CHAIN) ADJUSTMENT
S/Conveyor (>200MW#) SHIFTING
S/Conveyor (<>) Serv
S/Conveyor (FLAPS) SERVICING
S/Conveyor (WHEEL) OH
S/Conveyor (SLIP COUPLING) Repl
S/Conveyor (TENSIONING STN) OH
Conv Pulleys (<>) OH
Conv Pulleys (<>) Repl
C/Grinder (>210MW#) Serv
C/G F.Cplg/G.Box (<>) Repl
C/Grinder (ROLL) HARDFACING
C/Grinder (>210MW#) Repl
C/Grinder(>210MW#)-Attend Defect
Ash Slurry P/P (Dia>6"-12") OH
Ash Slurry P/P(Dia>6"-12")-Repl
ACI Ash Line (Dia>6"-12") Choking Remova
Ash Slurry P/P(Dia>6"-12")-04W Chks
VERT PP (<>) OH
LP Water Pump (<>) OH
LP Water Pump (<>) Serv
BAH Gate (>210MW#) Serv
BAH Gate(>210MW#)-OH
BA Hopper (REFRACTORY) OH
BA Hopper (SEAL TROUGH) OH
BA Hopper (REFR COOLING HDR) Repl
BA Hopper (VIEW GLASS) Cleaning
BAH Gate (MANHOLE) Repair
SCAFFOLDING (<>) Instal/Remove
Elec Winch(>05-10MT)-Serv
KNIFE GATE V/V (<>) OH
Pit/ Sump () Cleaning
COUPLING (<>) ATTEND BREAKDOWN
S/C F.Cplg/G.Box(<>)-OH
Ash Slurry P/P (SUC PIPE) Attend Defect
S/Conveyor (>200MW#) INSPECTION
S/Conveyor (TRPLEX CHAIN) Repl
ACI Ash Line (Dia>6"-12") (LEAKAGE ATTEN
VERT PP (<>) 08W CHKS
Ash Slurry P/P (1300 M3HR) OH
Ash Slurry P/P(Dia>12")-Repl
Ash Slurry P/P (Dia>12") Serv
Ash Slurry P/P (SUC ADOPTER) RECLAMATION
Ash Slurry P/P (SUC PIPE) Repl
Ash Slurry P/P (SUC ADOPTER) Repl
Ash Slurry P/P (COUNTER SHAFT) Repair
Ash Slurry P/P (BELT) Repl
Ash Slurry P/P (1300 M3HR) ALIGNING
Fluid Cplg (<>) OH
Fluid Cplg (<>) Repl
Fluid Cplg (OIL COOLER) Serv
SEALWATER PP (<>) OH
Submersible Pumps (<>) OH
Pit/ Sump (VALVE) OH
KNIFE GATE V/V (<>) Remove & Apply
Ash Slurry P/P (GLAND) Checking
MS Piping (NB150) Repl
MS Ash Line (Dia>6"-12") Repl
MS Piping (Dia>12") Repl
Bends/Laterals (<>) Attend Defect
Ash Valves(Dia<=6")-Repl
Ash Valves(Dia>6"-12")-Repl
Ash Valves(Dia>12")-Repl
MATL (MISC) Fabrication
Structures (GRILL) Erection
Elec Hoists(>05-10MT)-Serv
O/H & MAINT OF STG-2 DFA & SILO
COLLECTOR TANK (<>) Attend Defect
COLLECTOR TANK (<>) OH
Vac Pp/ Blwr (<=10NM3) Attend Defect
Vac Pp/ Blwr(<=10NM3)-OH
SGV (<>) Repair
SGV (<>) Repl
MHV (<>) Repair
MHV (<>) Repl
KNIFE GATE V/V (<>) REPL DMGD ITEM:001
Dry Fly Ash (EVACUATION SYS) OH
Buffer Hopper (DUMP GATE) REPL DMGD ITEM
Buffer Hopper (DUMP GATE) Repl
Buffer Hopper (RSV) Attend Defect
Buffer Hopper (RSV) Repl
Air Lock Valve (<>) Attend Defect
Air Lock Valve (<>) Repl
MULTIPORT VV (2 WAY V/V) Serv
MULTIPORT VV (2 WAY V/V) Attend Defect
Safety Valve (<>) Cleaning
Buffer Hopper (<>) Cleaning
Bag Filters(<>)-Repl
Recipro Comp (FILTER) Cleaning
RECIPRO COMP (CYLINDER) OH
RECIPRO COMP (CRANKCASE) OH
Recipro Comp (COOLER) Serv
Air Drying Unit (PREFILTER) Cleaning
Air Drying Unit (SILICA GEL) Repl
Screw Comp (>20NM3) SERVICING
Screw Comp (INTER/AFTER COOLER) Cleaning
Ash Silo (BAG FILTER) Cleaning
VERT PP (<>) Attend Defect
VERT PP (<>) OH
Pit/ Sump () Cleaning
Silo Vent Fan (<>) Attend Defect
Silo Vent Fan(<>)-OH
BLWR/FAN (<>) Repair
BLWR/FAN (<=25KW) OH
Dustconditioner(<>)-Attend Defect
Dustconditioner (<>) Repair
Ash Silo (HMDC) OH
Rotary Feeder(<>)-Attend Defect
Rotary Feeder(<>)-OH
ACI Ash Line(Dia>6"-12")-OH
ACI Ash Line(Dia>6"-12")-Attend Defect
Bends/Laterals (Dia>12") JOINTING
COUPLING (<>) Repl
ACI Ash Line (Dia>6"-12") WATER WASHING
MISC WORKS (<>) RECLAMATION
Buffer Hopper (MANHOLE) Attend Defect
Dry Fly Ash (SATGE-2) INSPECTION
Misc Works (<>) Monitoring
MHV (<>) Attend Defect
Flushing App (<>) Repl
COLLECTOR TANK (SEAL BOX) Repl
Vac Pp/ Blwr (<=10NM3) ATTEND BREAKDOWN
Ash Silo (<=1000MT) Attend Defect
Ash Silo (MERERING CUTOFFGATE OH
Ash Silo (<=1000MT) Cleaning
Ash Silo (TARGET BOX) Repair
BLWR/FAN (DRIVE BELT) Attend Defect
BLWR/FAN (>25KW) OH
Misc Works (<>) Fabrication
Air Drying Unit (CHANGEOVER V/V) Serv
Misc Works (<>) ATTEND BREAKDOWN
Misc Works (<>) Instal/Remove
Misc Works (<>) CLADDING
MS Piping (NB150) Repl
MS Ash Line (Dia>6"-12") Repl
MS Piping (Dia>12") Repl
Bends/Laterals(Dia<=6")-Repl
Bends/Laterals(Dia>6"-12")-Repl
Bends/Laterals(Dia>12")-Repl
Ash Valves(Dia<=6")-Repl
Ash Valves(Dia>6"-12")-Repl
Ash Valves(Dia>12")-Repl
MATL (MISC) Fabrication
Structures (GRILL) Erection
Elec Hoists(>05-10MT)-Serv
Misc Works (<>) Letter Writing
Screw Comp (>20NM3) ALIGNING
MISC WORKS (<>) MAN.DEP-HSW
O/H & MAINT. OF ST#3 ASH HANDLING SYSTEM
S/Conveyor (HEAD SHAFT) OH
S/Conveyor (SCRAPPER BARS) Repl
S/Conveyor (SCRAPPER BARS) Repair
S/Conveyor (SCRAPPER BARS) RECLAMATION
S/Conveyor (SCRAPPER BARS) 24W Chks
S/Conveyor (UPR DECK) Serv
S/Conveyor (LWR DECK) Serv
S/Conveyor (UPR DECK) Repair
S/Conveyor (CHAIN) Repl
S/Conveyor (CHAIN) ADJUSTMENT
Structures (GRILL) Erection
S/Conveyor (<>) SHIFTING
S/Conveyor (FLAPS) SERVICING
S/Conveyor (WHEEL) OH
S/Conveyor (TENSIONING STN) Serv
S/Conveyor (HYD POWER PACK) 12W Chks
S/Conveyor (<>) Serv
Conv Pulleys (<>) OH
Conv Pulleys (<>) Repl
C/Grinder(>210MW#)-OH
C/G F.Cplg/G.Box (<>) Repl
C/G F.Cplg/G.Box (<>) ALIGNING
C/Grinder (>210MW#) SHIFTING
C/Grinder (>210MW#) ATTEND BREAKDOWN
Ash Slurry P/P (Dia>6"-12") OH
Ash Slurry P/P(Dia>6"-12")-Repl
Ash Slurry P/P(Dia>6"-12")-04W Chks
ACI Ash Line (Dia>6"-12") Choking Remova
Ash Slurry P/P (Dia>6"-12") Decpl/Cpl/Al
Ash Slurry P/P (Dia>12") OH
Ash Slurry P/P(Dia>12")-Repl
Ash Slurry P/P (Dia>12") Serv
Ash Slurry P/P (SUC ADOPTER) RECLAMATION
Ash Slurry P/P (SUC PIPE) Repl
Ash Slurry P/P (SUC ADOPTER) Repl
Ash Slurry P/P (BELT) Repl
Ash Slurry P/P (GLAND) Repl
Fluid Cplg (<>) OH
Fluid Cplg (<>) Repl
Gear Boxes (<>) OH
Gear Boxes (<>) Repl
Fluid Cplg (OIL COOLER) Serv
VERT PP (<>) OH
VERT PP (<>) Serv
SEALWATER PP (MULTISTAGE) OH
SEALWATER PP (<>) Serv
PLUG V/V (>12") Repl
HP Water Pump (Dia>6"-12")-OH
HP Water Pump (Dia>6"-12") Serv
Pit/ Sump () Cleaning
BA Hopper (>210MW#) Serv
BAH Gate(>210MW#)-Attend Defect
BA Hopper (REFRACTORY) OH
BA Hopper (SEAL TROUGH) OH
BA Hopper (REFR COOLING HDR) Repl
BA Hopper (NOZZLES) Cleaning
BA Hopper (VIEW GLASS) Cleaning
BA Hopper (MANHOLE DOOR) Repair
Vac Pp/ Blwr(>20NM3)-OH
Vac Pp/ Blwr (>20NM3) Repl
Vac Pp/ Blwr (>20NM3) Serv
Vac Pp/ Blwr (>20NM3) Attend Defect
COLLECTOR TANK (<>) Cleaning
COLLECTOR TANK (CI LINER) Repl
COLLECTOR TANK (WETTING HEAD) Repl
COLLECTOR TANK (IMPINGEMENT PLATE) Repl
MHV (<>) ATTEND BREAKDOWN
MHV (AIR INTAKE V/V) Serv
SGV (<>) Repl
Recipro Comp (SUC/DIS VV) Serv
Recipro Comp (COOLER) Attend Defect
Recipro Comp (FILTER) Serv
Recipro Comp (CYLINDER) Repl
Recipro Comp (CRANKCASE) Attend Defect
Recipro Comp (PISTON RINGS) Repl
Air Drying Unit(<>)-OH
Air Drying Unit (<>) Serv
Air Drying Unit(<>)-Attend Defect
BLWR/FAN (<>) OH
BLWR/FAN (<>) Attend Defect
Dry Fly Ash (<>) OH
WET ASH (<>) OH
Fluidising Pads (<>) INSPECTION
Elec Winch(>10-25MT)-Serv
S/Conveyor (TENSIONING STN) Daily Chks
Misc Works (<>) WELDING
Misc Works (<>) CUTTING
MATL (MISC) Fabrication
Ash Valves (Dia<=6") ATTEND BREAKDOWN
Ash Valves (Dia>6"-12") OH
Ash Valves(Dia>12")-Attend Defect
KNIFE GATE V/V (<>) Repl
MS Piping (Dia<=6") Repl
MS Piping (Dia>6"-12") Attend Defect
MS Piping (Dia>12") Repl
Bends/Laterals (Dia>12") Attend Defect
ACI Ash Line(Dia>6"-12")-Repl
ACI Ash Line (COUPLING) Repl
Bends/Laterals (<>) Fabrication
COUPLING (<>) ATTEND BREAKDOWN
Elec Hoists(>05-10MT)-Serv
SCAFFOLDING (<>) Instal/Remove
SEALWATER PP (<>) Attend Defect
BPH MANIT. AND S/P P/H Maint
Ash Valves (Dia>12") Serv
Ash Slurry P/P (Dia>12") OH
Ash Slurry P/P(Dia>12")-Repl
Misc Works (<>) Repair
Ash Slurry P/P (BELT) Repl
Ash Slurry P/P (GLAND) Repl
Gear Boxes (<>) OH
Gear Boxes (<>) Repl
Fluid Cplg (<>) OH
Fluid Cplg (<>) Repl
Fluid Cplg (OIL COOLER) Cleaning
VERT PP (<>) OH
Ash Slurry P/P (SUC ADOPTER) Repl
Ash Slurry P/P (DIS ADOPTOR) Fabrication
Misc Works (<>) Letter Writing
CB Ash Pipe (Dia>12") Instal/Remove
Ash Valves(Dia>12")-Repl
Ash Valves(Dia>6"-12")-Repl
Ash Valves(Dia<=6")-Repl
DEPTT <> MAN.DEP.-GANGMEN
HP Water Pump (Dia>6"-12")-OH
Pit/ Sump () Cleaning
Elec Hoists(>05-10MT)-Serv
Ash Slurry P/P (Dia>12") ALIGNING
Bends/Laterals (Dia<=6") Fabrication
MATL (MISC) Fabrication
MATL (ASH) Hndlg&Stacking
MS Piping (Dia<=6") Instal/Remove
Submersible Pumps(<>)-Serv
SEALWATER PP (MULTISTAGE) OH
Ashish Enterprises
M/S Pahalwan Construction
M/s K.S ENGINEERING
BRILLIANT ELECTRICALS
M/S B. B. KAR
CENU ENGINEERINGWORKS
KRISHNA ENGINEERING WORKS
M.J.ENTERPRISES
TECHNOCARE ENGINEERS
GURUNANAK CONSTRUCTIONS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .