Loading…
Loading…
Tender Value
₹2.6 L
EMD Value
₹5,300
Closing Date
7 Sept 2026, 4:00 pmClosed
Executive Engineer I-FC Division Kargil
Executive Engineer I-FC Division Kargil
Remodeling of Mayur khul Gonkha Stickchay Choskore
2026_PWD_19456_5
e-Tender 19 of 2026-27/INFC Kargil
Open Tender
Civil Works - Canal
Works
30 days
Kargil
Please refer Tender documents.
4 documents required · 4 mandatory
₹50
Payable To Executive Engineer I-FC Division Kargil
₹5,300
29 Aug 2026
29 Aug 2026
8 Sept 2026
29 Aug 2026
7 Sept 2026
29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolising / dismantling cement concrete manually / by mechanical means including disposal of material within 50 m lead as per the direction of site engineer. Nominal Concrete 1:3:6 or richer mix. | 15.07 | Cum | 667.4 | ₹10,057.72 |
| 2 | Dumping of stone in horizontal level excluding cost of stone . | 9.45 | Cum | 207.55 | ₹1,961.35 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:2:4 (1 cement: 2 coarse sand (zone-III) derioved from natural sources: 4 graded stone aggregate 20mm nominal size derived from natural sources) | 28.35 | Cum | 5,627.86 | ₹1,59,549.83 |
| 4 | Centering and shuttering incld.strutting propping etc. and removal of from for wall any thickness incld. Attached pilaster, buttresses plinth and string coarse ect walls of any thickness | 108 | Sqm | 393.53 | ₹42,501.24 |
| 5 | Cement concrete flooring 50mm thick 1:2:4(1cement: 2 Coarse sand: 4 graded stone agg.) finished with a floating coat of net cement slurry, but excluding the cost of nosing of step etc. comlepte 50mm thick with 20mm size stone agg. | 31.5 | Sqm | 485.7 | ₹15,299.55 |
| 6Carriage of material from source to site of work including loding un loading and stacking complete | |||||
| 6.01 | (i)(Sand / Aggregate.) by an avg lead of 25 Km by MT 200 Mtr by Head load | 40.09 | Cum | 704.01 | ₹28,223.76 |
| 6.02 | (ii)Cement by an avg lead of 30 Km by MT 200 Mtr by Headload | 6.58 | MT | 570.11 | ₹3,751.32 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_46111.xls
BOQ • 0.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .