Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 CrAccepted-AOC 5TH FLOOR KAILASH BUILDING 26 K G MARG CANAUGHT PLACE CENTRAL DELHI DELHI 110001 | NEW DELHI | DELHI | 110001 | ₹5.8 Cr Quoted ₹4.9 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹6.0 Cr+₹1.1 Cr (21.7%)Rejected-Finance B 84 DEFENSE COLONY BHISHMA PITAMAH MARG NEW DELHI 110 024 | NEW DELHI | SOUTH EAST DELHI | DELHI | 110024 | ₹6.0 Cr+₹1.1 Cr (21.7%) | L2 | Rejected-Finance Reject |
| 3 | L3₹11.1 Cr+₹6.2 Cr (125.6%)Rejected-Finance | ₹11.1 Cr+₹6.2 Cr (125.6%) | L3 | Rejected-Finance Reject |
Tender Value
Refer Docs
EMD Value
₹30 L
Closing Date
25 May 2021, 2:00 pmClosed
CEO, UTDB
Uttarakhand Tourism Development Board Pt. Deen Dayal Upadhyay, Paryatan Bhawan, Near O.N.G.C. Helipad, Nimbuwala, Garhi Cantt, Dehradun 248003
Selection of Technical Consultant to prepare DPR for identified projects at Tehri for External Financing
2021_UTDB_31212_1
4279/2-6-1265/2020-21 Dated 15.03.21
Open Tender
Consultancy
Lump-sum
285 days
Tehri Garhwal
As per RFP
2 documents required · 2 mandatory
₹11,800
Yes
CEO, UTDB
₹30 L
Yes
Dehradun
3 Sept 2021
15 Mar 2021
25 May 2021
15 Mar 2021
25 May 2021
20 Apr 2021
15 Mar 2021 - 24 Mar 2021
22 Mar 2021
Remuneration of Key Experts
Team Leader - Town Planner - On site
Team Leader - Town Planner - Off site
Deputy Team Leader - Tourism Expert - On site
Deputy Team Leader - Tourism Expert - Off site
Infrastructure Expert - On site
Infrastructure Expert - Off site
Landscape Expert/ Horticulturist - On site
Landscape Expert/ Horticulturist - Off site
Mobility/Traffic Management Expert - On site
Mobility/Traffic Management Expert - Off site
Finance Specialist - On site
Finance Specialist - Off site
Other Expenses
Per diem allowance, including hotel allowance, for experts for every day of outstation tour (This is applicable only if UTDB does not make arrangements and only for tours outside Dehradun)
Cost of office operation, including office equipment, overheads and back-end support
Local Transportation
Communication Costs to all personnel and Office
Digital mapping based on satellite data
Topographical survey
Geological soil investigation survey
Geo-tech survey
GPS based survey
DGPS survey
Social Impact Assessment Report
Environmental Impact Assessment Report
Relocation and Rehabilitation (R&R) plan
Final report (one soft copy including 3D video of Concepts and two hard bound copies)
IPE Global Limited
INI Design Studio Pvt. Ltd.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .