EE
Executive Engineer, Bilaspur Division No. II HPPWD Bilaspur
Construction of Community Hall in village Dhalet, G.P Lehri, Tehsil Sh. Naina Devi ji Distt. Bilaspur
2026_PWD_136023_1
3198-3204 dated 03-06-2026
Open Tender
Civil Works
60 days
Bilaspur
Please refer Tender documents.
8 documents required · 8 mandatory
₹350
Yes
₹10,000
Yes
Bilaspur
6 Jun 2026
6 Jun 2026
12 Jun 2026
6 Jun 2026
12 Jun 2026
6 Jun 2026
6 Jun 2026 - 12 Jun 2026
11 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm (thirty centimeter) in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m (fifty meter) and lift upto 1.5 m, as directed by Engineer-in-charge. All kind of soil including carriage of material with in all leads and lifts and other incidentals as per direction of Engineer-in-Charge.The rates includes octroi,royality ,Malkana toll tax goods and serivice tax ,building and other construction work, welfare cess, royality of any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 22.05 | cubic metre | 237 | ₹5,225.85 |
| 2 | Centering and shuttering including strutting, propping etcetera and removal of form work for including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all other incidentals.The rates includes octroi,royality ,Malkana toll tax goods and serivice tax ,building and other construction work, welfare cess royality of any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contractor and Government shall not entertain any claim whatsoever in this respect of the same. Foundations, footings, bases of columns, etc. for mass concrete | 27.68 | Square Meter | 277 | ₹7,667.36 |
| 0.0 | Columns, piers, abutments, pillars, posts and struts | 22.52 | square metre | 704 | ₹15,854.08 |
| 0.0 | Suspended floors, roofs, landings, balconies and access platform | 54.99 | square metre | 674 | ₹37,063.26 |
| 0.9 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 26.12 | square metre | 565 | ₹14,757.8 |
| 0.9 | .Edges of slab and breaks in floors and walls under 20cm wide | 34 | metre | 164 | ₹5,576 |
| 0.0 | Stone soling properly hand packed filling interstices with Kharanja stone and consolidating with power road roller to the requested gradient and comber including spreading watering and rolling of binding materials moorum or earth etc.complete as per HP.PWD specification. 100 mm ( One Hundred milimeter )spread thickness (finished work including materials and labour) including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge.The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess, royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 4.05 | Cubic metres | 1,184 | ₹4,795.2 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (one Cement : Four coarse sand) : Eight graded stone aggregate 40 mm (forty milimeter) nominal size) including carriage of material with in all leads and lifts and other incidentals as per direction of Engineer-in-Charge.The rates includes octroi,royality ,Malkana toll tax goods and serivice tax ,building and other construction work, welfare cess, royality of any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 5.4 | Cubic Metre | 4,927 | ₹26,605.8 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses,plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering,finishing and reinforcement 1:1.5:3(one cement into one point five coarse sand) into three graded stone aggregate 20 mm (twenty millimetre) nominal size | 8.09 | cubic metre | 8,659 | ₹70,051.31 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering,shuttering, finishing and reinforcement with 1:1.5:3 (one cement into one point five coarse sand) into three graded stone aggregate 20 mm (twenty millimetre) nominal size | 2.48 | cubic metre | 9,047 | ₹22,436.56 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
sbddhalet.pdf
Tender Documents • 5.20 MB
BOQ_201357.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid