Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.7 LAccepted-AOC GRAM POST KARMI KAPKOT DISTRICT BAGESHWAR | BAGESHWAR | UTTARAKHAND | 263619 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹22.7 L+₹3,859 (0.17%)Rejected-Finance NEAR TELEPHONE EXCHANGE TALLI BAZAR KAPKOTE BAZAR BAGESHWAR DISTRICT BAGESHWAR KAPKOTE BAGESHWAR PIN 263632 | BAGESHWAR | UTTARAKHAND | 263632 | L2 | Rejected-Finance Rejected | |
| 3 | L3₹23.1 L+₹45,396 (2.00%)Rejected-Finance 05 DEEPAK KUMAR PUJA KUNJ BAGAN PARA GAMHARIYA STATION ROAD BAGAN PARA EAST SINGHBHUM JHARKHAND 832106 | EAST SINGHBUM | JHARKHAND | 832106 | L3 | Rejected-Finance Rejected |
Tender Value
₹22.7 L
EMD Value
₹68,000
Closing Date
14 Dec 2023, 3:00 pmClosed
Superintending Engineer
Superintending Engineer EDC Ranikhet
Construction fo 11 KV line Kanda water supply scheme Stage-3 Village Dhalan Dhapoli EDD Bageshwar
2023_UPCL9_65831_1
EDC(R)-23/2023-24
Open Tender
Electrical Works
Item Wise
90 days
Bageshwar
As per Tender Document
2 documents required · 2 mandatory
₹1,180
Executive Engineer
₹68,000
24 Jul 2024
24 Nov 2023
15 Dec 2023
24 Nov 2023
14 Dec 2023
24 Nov 2023
Amount
NON-CENTRALIZED MATERIAL
Holding Clamp for SP-55 with N/B
Holding Clamp SP-33 with N&B
Top Chennel Clamp for SP-23 with N&B
Stay Clamp S/E with N&B
Stay Clamp S/E for SP-33 with N&B
Stay Clamp S/E for SP-23 Single End
Stay Clamp D/E with N&B
Stay Clamp D/E for SP 33 with N&B
Stay Clamp for SP 23 Double end
Bracing Clamp Top SP-55 with N/B
Bracing Set Clamp top with N/B for SP-33
Bracing Clamp top for SP-23 with N/B
Bracing Clamp Bottom with N&B SP-55
Bottom bracing clamp for SP-33 N&B
Bracing Clamp Bottom for SP-23 with N/B
Holding Clamp for Gaurding
Earth wire clamp for Sp-55 with N/B
Earth wire clamp for Sp-33 with N/B
Earth wire clamp for Sp-23 with N/B
E-clamp for 11 KV
PG clamp rabbit to rabbit
J-Hook
TPMO Lock
LABOUR CHARGE
Cartage SP-55 Pole 100-150 Km
Cartage SP-33 Pole 100-150 Km
Cartage SP-21/23 Pole 100-150 Km
Cartage of Petty material 100-150 Km
Headload Cartage SP-55 pole (0-1 Km)
Headload Cartage SP-33 pole (0-1 Km)
Headload Cartage SP-21/23 pole (0-1 Km)
Headload cartage of material (0-1 Km)
Excavation of pit for pole
Erection of single SP-55 Pole
Erection of single SP-33 Pole
Erection of single SP-23 Pole
Erection of SP-55 Double Pole
Erection of SP-33 Double Pole
Erection of SP-23 Double Pole
Grouting of Pole
Muffing of Pole
Fabrication of Steel
Excavation of pit for stay set
Erection of 11 KV stay set
Grouting of stay set
Erection of earthing rod
Laying of rabbit conductor in HT line
Guarding of LT/11 KV line
Lopping & Chopping of tree branches
Painting of SP-55 Pole
Painting of SP-33 Pole
Painting of SP-21/23 Pole
Inst. Of danger board/number plate
Fixing of TPMO
Laying of U/G 11 KV cable in trench
Fixing of 11 KV XLPE jointing kit
Construction of Metering room
G P ENTERPRISES
DEEPAK CONSTRUCTION
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .