Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 CrAdmitted-Finance 4TH FLOOR B K MARKET BACK SIDE PREMISES NO 16 B SHAKESPEARE SARANI KOLKATA 700071 | KOLKATA | KOLKATA | WEST BENGAL | 700071 | ₹3.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.8 Cr+₹3.8 L (1.00%)Admitted-Finance | ₹3.8 Cr+₹3.8 L (1.00%) | L2 | Admitted-Finance |
| 3 | L3₹4.0 Cr+₹15.8 L (4.16%)Admitted-Finance 191 1 DIHIBARI KASHIDIH ROAD SAKCHI JAMSHEDPUR EAST SINGHBHUM JHARKHAND 831001 INDIA | EAST SINGHBUM | JHARKHAND | 831001 | ₹4.0 Cr+₹15.8 L (4.16%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not qualified |
| Sl No | Description | Qty | Unit | OM SHARDA LOGISTICS PVT LTD L3 | NKAS SERVICES PVT LTD L1 | UNITED COAL CARRIERS L2 |
|---|---|---|---|---|---|---|
| 1.00 | Evacuation of settled ash from the ash pond no.-1 and / or ash pond no-2 ash by deploying excavating machineries and other accessories including loading into dumpers at work site and unloading at destination at ( approved disposal areas i.e in mines / quarry) including the carriage of the same for any distance for any lift and lead at both loading and unloading points, dressing at desired level at disposal areas including covering up the filled ash with 300 mm thick earth after attaining the required level, all as per direction of the EIC.
No leakage and spillage of ash from dumper should be maintained. Water is to be sprinkled at the loading point as well as the unloading point including movement road to prevent air pollution. Approaches inside the pond at different stages should be prepared suitably for easy and smooth movement of excavators, dumpers etc.
Excavations should be done in correct profile, slope and providing proper berms at respective levels without damaging the safety and stability of the existing embankment of ash pond, including mending damages and rectification of existing embankment as per direction of Engineer-in -Charge, if required.
The rate includes any dewatering of ash pond and excavated pits, necessary for execution of work, arising out of seepage, rains and whatsoever.
(Measurement will be made on the basis of pre-work and post-work levels of the ash pond).
Approved disposal areas should be arranged by the agency beyond a distance of 05 KM radius from Ash Pond. | 2,00,000 | Cu.M. | 198 ₹3,96,00,000 | 190.1 ₹3,80,20,000 Lowest | 192 ₹3,84,00,000 |
Tender Value
₹3.9 Cr
EMD Value
₹7.8 L
Closing Date
15 Sept 2022, 3:00 pmClosed
GM, STPS
1st floor,Admin. Building,Santaldih Thermal Power Station,Santaldih,Purulia-723146
Evacuation of settled ash from ash pond 1/ash pond 2, transportation and disposal in eco-friendly manner from STPS, WBPDCL.
2022_WBPDC_393925_1
WBPDCL/STPS/NIT/E2835/22-23
Open Tender
Support/Maintenance Service
Item Rate
120 days
STPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7.8 L
Yes
STPS
29 Oct 2022
8 Aug 2022
17 Sept 2022
8 Aug 2022
15 Sept 2022
25 Aug 2022
22 Aug 2022
Amount
Evacuation of settled ash from the ash pond no.-1 and / or ash pond no-2 ash by deploying excavating machineries and other accessories including loading into dumpers at work site and unloading at destination at ( approved disposal areas i.e in mines / quarry) including the carriage of the same for any distance for any lift and lead at both loading and unloading points, dressing at desired level at disposal areas including covering up the filled ash with 300 mm thick earth after attaining the required level, all as per direction of the EIC. No leakage and spillage of ash from dumper should be maintained. Water is to be sprinkled at the loading point as well as the unloading point including movement road to prevent air pollution. Approaches inside the pond at different stages should be prepared suitably for easy and smooth movement of excavators, dumpers etc. Excavations should be done in correct profile, slope and providing proper berms at respective levels without damaging the safety and stability of the existing embankment of ash pond, including mending damages and rectification of existing embankment as per direction of Engineer-in -Charge, if required. The rate includes any dewatering of ash pond and excavated pits, necessary for execution of work, arising out of seepage, rains and whatsoever. (Measurement will be made on the basis of pre-work and post-work levels of the ash pond). Approved disposal areas should be arranged by the agency beyond a distance of 05 KM radius from Ash Pond.
UNITED COAL CARRIERS
OM SHARDA LOGISTICS PVT LTD
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_772424.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .