Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
24 Jun 2024, 2:30 pmClosed
THE COMMANDING OFFICER, ICGS VERAVAL
ICGS VERAVAL, POST BOX NO. 03 VERAVAL-362265
PLS REFER AS PER TENDER DOCUMENTS
2024_ICG_659514_1
VRL/RM/RFP/06/24-25 DATED 13 JUN 2024
Single
Miscellaneous Services
Lump-sum
ICGS VERAVAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
25 Jun 2024
13 Jun 2024
25 Jun 2024
13 Jun 2024
24 Jun 2024
14 Jun 2024
14 Jun 2024 - 24 Jun 2024
ICGS C-149 Defect Sl No. Yearly routine of FM-200 to be carried out as per maintenance schedule: - (a) After removal of solenoid valve from FM 200 cylinder head of the system, the following checks need to be carried out: (i) Electrical remote cabinet opening from remote (ii) Pneumatic release cabinets (b) System check-check each electrical manual release unit for operation. (c) Check that all alarm and evacuation alar lights and sounds. (d) Check that all AC are shut down or dampers are closed, if any. (e) Check that all pneumatic actuator operates after pre-set time delay. (f) Check that all electric actuator operates after pre-set time delay. (g) Check operation of discharge pressure switch and check indication lamp (h) Reset all pneumatic actuator, electrical actuators, discharge pressure switch and the fire alarm system. (j) Pipe work/nozzles-check pipes and fitting are to correct standards (k) Check nozzles to ensure that they are free from debris (l) Check dust caps are fitted (m) Containers-check containers are safe from mechanical damage, corrosion or unauthorised interference. (n) Check containers brackets are fitted and all bolts tightened. (p) Check pneumatic actuation is firmly is fixed and all connections are tight. Job being undertaken at Okha
ICGS C-153 Defect Sl No.The following Yearly routine of FM-200 to be carried out as per maintenance schedule: - (a) After removal of solenoid valve from FM 200 cylinder head of the system, the following checks need to be carried out: (i) Electrical remote cabinet opening from remote (ii) Pneumatic release cabinet. (b) Check each electrical manual release unit for operation. (c) Check fire and evacuation alarm lights and sounds. (d) Check that all AC are shut down or dampers are closed, if any. (e) Check that all pneumatic actuator operates after pre-set time delay. (f) Check that all electric actuator operates after pre-set time delay. (g) Check operation of discharge pressure switch and check indication lamp (h) Reset all pneumatic actuator, electrical actuators, discharge pressure switch and the fire alarm system. (j) Pipe work/nozzles-check pipes and fitting are to correct standards. (k) Check nozzles to ensure that they are free from debris. (l) Check dust caps are fitted. (m) Check containers are safe from mechanical damage, corrosion or unauthorised interference. (n) Check containers brackets are fitted and all bolts tightened. (p) Check pneumatic actuation is firmly is fixed and all connections are tight.
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .