Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.3 LAccepted-AOC 164 HIRANI NAGAR OPP SIDDHI VINAYAK TEMPLE MADHAPAR KUTCH 370 020 | KACHCHH | GUJARAT | 370020 | L1 | Accepted-AOC BEING LOWEST | |
| 2 | L2₹17.8 L+₹1.5 L (9.31%)Rejected-Finance WANIAWAD BHUJ KUTCH 370001 | BHUJ | KUTCH | GUJARAT | 370001 | L2 | Rejected-Finance BEING NOT LOWEST | |
| 3 | Rejected-Technical | - | Rejected-Technical No, Contractor has not been uploaded fwg docu as per Para 1.4 and 1.5 of Manual of Contracts 2020 | |
| 4 | Rejected-Technical | - | Rejected-Technical No, as the firm is not found enlisted in requisite category i.e b(i) |
Tender Value
₹16.1 L
EMD Value
₹32,300
Closing Date
3 Apr 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE (AF) BHUJ
GE (AF) BHUJ ,KHAVDA ROAD, BHUJ GUJARAT-370001
REPLACEMENT OF BER TAMPER PROOF ELECT METERS TO PREPAID METERS IN MD ACCN AT AF STN BHUJ
2024_MES_641013_2
8714/V/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
GE (AF) BHUJ
AS PER NOTICE OF TENDER
7 documents required · 7 mandatory
₹500
GE (AF) BHUJ
₹32,300
Yes
10 May 2024
16 Mar 2024
5 Apr 2024
16 Mar 2024
3 Apr 2024
22 Mar 2024
18 Mar 2024 - 18 Mar 2024
Amount
Taking Down carefully existing meters from inside the panel box/wall along with disconnecting the incoming supply cable complete all as specified and as directed by Engr-in-Charge. (Note:- Contractor is responsible for noting down the reading and depositing it to AGE(E/M) store yard)
Supply, install, testing & commissioning of IS 16444 certified single phase smart energy meter rating 240 Volts, 50 HZ, of range 10-60 Amps, with LED/LCD display and parameters like voltage, current, frequency, power, power factor, KWh/KVA, inbuilt RF communication and also compatible for prepaid and postpaid online energy monitoring billing system, with disconnection /reconnection through remote MDM and billing software complete all as specified and as directed by Engr-in-Charge. Notes: (a) It would be possible to run the meter in both prepaid and postpaid mode (b) The meters would carry 5 year warranty. (c) The OEM would need to share the Authentication / Encryption keys of the meters along with relevant protocl details with the department. The department would need complete support of the OEM to be able to integrate the meter with any software of the department choice.
Supply and installation of Polycarbonate box for single phase smart meter complete all as specified and as directed by Engr-in-Charge.
Supply and installation of IP-67 protection Data concentrator units (DCU) compatible for remote automatic metering infrastructure (AMI) solution and capable of communicating with the smart energy meter in the corresponding frequency band and with the data server through GPRS/Ethernet. It would have funtionality to integrate and transmit the data of at least 200 modules. It would have inbuilt battery back-up for two hours. It would have IP-67 protection. It would support auto discovery of the meters and self healing mechanism for the breaks in the RF network. It would have the following minimum features: (i) It shall be able to configure the communication with underlying nodes / meters (ii) It should be able to pull data at configurable frequency from the nodes / meters. It shall be able to prioritize control commands. (iii) DCU would support on demand data from nodes. (iv) DCU would support data transfer via cellular / optical fibre communication. In case of cellular communication, it would support dynamic IP sim from any telecom service provider (minimum 4G and fallback to 2G). (v) DCU would be able to communicate to the nearest meters directly. For farther meters, it would allow communication through existing meters via mesh or other formation. (vi) DCU would allow more than one make of IS 16444 certified meters for the communication. It would be demonstrated for sample approval.
Supply and configuration of the web based software with following modules: (i) Meter Data management module- The meter data management module would be responsible for collecting the data from the concentrator and make the data available to the billing system. The meter data management system would capture and provide the following data: (a) 30 min instantaneous data from all the meters for seven parameters – Cumulative energy, cumulative apparent energy (as applicable), power, current, voltage, power factor and frequency (b) Monthly billing survey data for cum energy and max demand (ii) Postpaid /Prepaid billing module- The billing module would collect the data from the meter data management module, calculate the energy consumption, calculate billing determinant and make energy data / billing data available to admin and end users. The billing module would include functionalities for tariff setup, bill format setup, bill adjustment, occupation billing and vacation billing. It would allow postpaid and prepaid functionality as required.
(iii) Occupation and vacation module- The system would support occupation / vacation and billing reports. the software would be collecting data from DCU. The software would provide access to staff as well as the occupant for the data. (iv) Web site: There would be a dedicated website for the AGE and BSO team to view all the data and information. The designated users in MES would have the admin access to the application. The MES staff would also have the access of the key information on an android mobiles app (for admin use). (v) Customer Portal- The system would include a customer portal for the resident /occupant to log in and view their own energy / billing data. There would be android and iOS mobile apps for the user to monitor its own data and balance on regular basis.
(vi) Energy Accounting Module- The system would include features of energy accounting. The system would be able to account for total energy block wise, facility wise and would also allow calculations of unaccounted energy in case total energy meter is also available. (vii) Communication Module- The system would provide communication of energy data and bills via print, email and sms methods. (viii) Meter Master Data- The system would support meter master data repository. The system would support meter replacement process. (ix) Excel Export- The system would support export of metering and billing data in excel format. (x) Customer Care Module - the software would include a customer care module where the user would be log in any complaints. The service provider would monitor the complaints and carry out the necessary activities for the complaints resolution. (xi) Meter Installation Module - The software would include an app based meter installation module where the meter installation or changes can be captured on the app itself and the readings may be demonstrated to the user if required on the app itself.
(xii) Activities Communication - The software support communication of the various activities such as occupation, vacation, meter change. personal detail change etc. with the user as well as the department on email. Software Note: (a) The software would be hosted either on GCC server or on MES server. In case the software is hosted on GCC server, it would be transferred to MES server whenever the MES is made available. (b) The software should be audited by cert-in empannelled auditor (c) GE bank account and one payment gateway would be provided by MES. The payment gateway would be integrated with the software in that situation.. (d) The software would be scalable and expandable for meters and system of different make complying with IS 16444. The software would be able to consumer web services of the future projects if required. (e) The software sample approval would be based in integration demontstrating of at least four makes of the meters (2 RF at least and 2 cellular at least) (f) The software would support other charges such as water charges, license fee, furniture charges and other allied charges. (g) The software would allow supporting both prepaid and postpaid billing plans. Separate groups can be created for the same.
Comprehensive maintenance and GCC cloud hosting charges for two year of the defect liability period complete all as specified and directed by Engr-in-Charge
Material & labour for sub main wiring with two runs (two runs measured as one run) of PVC insulated and unsheathed FRLSH cable 650/1100 Volts grade, conforming to IS-1536-1977 multi-stranded 4 Sqmm single core size copper conductor drawn through and including PVC cassing capping/ flexible conduit with accessories and 4 Sqmm single core multistranded copper conductor PVC insulated and unsheathed FRLSH cable 1100 volts grade, ISI marked earth continuity wire complete all as specified and directed by Engr-in-Charge. (Note : Two runs of conductor with one run of earth wire and one run of conduit will be measured and paid as one unit)
Supply & fix MCB SPN of 240 volts 6 to 40 Amps capacity, 'C' series 10 KA in SMC box complete all as specified and directed by Engr-in-Charge.
M/s Bombay Novelty Stores
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .