Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹6.8 LAccepted-AOC | ₹6.8 L | l1 | Accepted-AOC Single Tender |
Tender Value
Refer Docs
EMD Value
₹14,000
Closing Date
28 Jun 2024, 10:00 amClosed
Dr. B. N. Tandel
Faculty In-charge MIS Section [email protected]
Renew of Hosting of MIS Software (ERP RF-CAMPUS) on Cloud Based Server (Microsoft Azure)
2024_SVNIT_810510_1
SVNIT-CPP-380/MIS/2024
Single
AMC/ Maintenance Contracts
Supply
30 days
SVNIT Campus
As pre Tender document
7 documents required · 7 mandatory
₹0
₹14,000
9 Aug 2024
7 Jun 2024
1 Jul 2024
7 Jun 2024
28 Jun 2024
7 Jun 2024
Renew of Hosting of MIS Software (ERP RF-CAMPUS) on Cloud Based Server (Microsoft Azure) through M/s Master Soft ERP Solution Pvt. Ltd, Nagpur for the year 2024-25 (Detailed technical specifications of the items as per chapter – 8 enclosed with this notice) (App Server, DB Server, Storage: Storage Account for SQL Backup, AppServer and DBServer Replica, Networking: Load Balancer, Bandwidth IP Address &Traffic Manager,Azure Site Recovery) Note: 1. Latest & Valid Authorization Certificate from manufacturer should be enclosed along with your offer. 2. In the event of a work-order, Performance Security @ 3% of the work order value is to be submitted. 3. The bidder has to submit EMD of Rs. 14,000 /- with technical bid (Refer chapter 5 class No. 04 of the tender document of details) and MSE bidder should submit the security declaration certificate as per Annexure-3. 4. The quantity shown are for mere guidance only. The bill should be raised on actual utilization. 5. Cloud Server configuration must be upgraded when informed by SVNIT for crucial tasks of SVNIT. 6. Work order may be extended further 2 years based on performance on year-to-year basis with same terms and condition, with same specification. 7. The services under the consideration may be stopped by giving 30 days of notice from both side and payment of such services will be done on pro-rata bases for the actual usage. 8. The Payment is generally made on quarterly basis in 30 days post receipt of invoice raised. 9. Bids not complying to the above technical eligibility criteria and non-submitting the required documents are liable to be rejected.¬¬¬
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_851795.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .