Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 1ST FLOOR NOVUS TOWER WEST WING PLOT NUMBER 18 SECTOR 18 GURUGRAM HARYANA 122015 | GURUGRAM | GURUGRAM | HARYANA | 122015 | Admitted-Finance |
| 4 | Admitted-Finance 37 INTEC HOUSE SECTOR 44 INSTITUTIONAL AREA GURGAON HARYANA 122002 | GURUGRAM | HARYANA | 122002 | Admitted-Finance |
| 5 | Rejected-Technical | Rejected-Technical Not meet the minimum qualifying score of 750 points |
Tender Value
Refer Docs
Closing Date
23 Oct 2024, 12:00 pmClosed
SE C and P II
SE C and P II PTCUL Majra Dehradun
Selection of Project Implementation Support Consultant PISC for PTCUL
2024_PADB1_74847_1
CandP-II/ADB/PTCUL/23-24/PISC
Limited
Consultancy
730 days
As per RFP
As per RFP
2 documents required · 2 mandatory
₹0
Exempted
Dehradun
21 Feb 2025
21 Aug 2024
23 Oct 2024
21 Aug 2024
23 Oct 2024
4 Oct 2024
21 Aug 2024 - 10 Sept 2024
10 Sept 2024
Competitive Components
Remuneration (Key Experts)
International Consultants
Distribution System Expert / Team Leader
Power Transmission Expert
National Consultants
Civil Engineering Expert
Finance Expert
Environmental Specialist
Social Safeguards Specialist
Gender Specialist
IT Expert
Health and Safety Specialist
Remuneration ( Non Key Experts)
Environmental , Health & Safety Management Consultant
Social Safeguards & Gender Management Consultant
GIS Consultant
Communications/Community Stakeholder Relations Consultant
Localization Support & Disclosure Consultant
Residential Technical Team Member: Manager
Residential Technical Team Member: Associate 1
Residential Technical Team Member: Associate 2
Residential Technical Team Member: Associate 3
Residential Technical Team Member: Associate 4
Reimbursable Expenses / Out-of-Pocket Expenses (OPE)
Per Diem Allowance
International Travel
Domestic Travel
Land Transportation/Vehicle Hire
Communications
Report Preparation, Production and Transmission
Others: Establishment of Web-Based Project Management System
Others: Maintenance services for Web-Based Project Management (including cloud hosting and communication charges)
Non Competitive Components
Provisional Sums (for Time-based contract only)
Equipment: Laptop for PMU, other equipment, furniture, etc.
Seminars, Workshops, Training (including Survey and Studies)
Contingency (for Time-based contract only)
Contigency
Description of Work / Item(s)
Amount
Competitive Components
Remuneration (Key Experts)
International Consultants
Distribution System Expert / Team Leader
Power Transmission Expert
National Consultants
Civil Engineering Expert
Finance Expert
Environmental Specialist
Social Safeguards Specialist
Gender Specialist
IT Expert
Health and Safety Specialist
Remuneration ( Non Key Experts)
Environmental , Health & Safety Management Consultant
Social Safeguards & Gender Management Consultant
GIS Consultant
Communications/Community Stakeholder Relations Consultant
Localization Support & Disclosure Consultant
Residential Technical Team Member: Manager
Residential Technical Team Member: Associate 1
Residential Technical Team Member: Associate 2
Residential Technical Team Member: Associate 3
Residential Technical Team Member: Associate 4
Reimbursable Expenses / Out-of-Pocket Expenses (OPE)
Per Diem Allowance
International Travel
Domestic Travel
Land Transportation/Vehicle Hire
Communications
Report Preparation, Production and Transmission
Others: Establishment of Web-Based Project Management System
Others: Maintenance services for Web-Based Project Management (including cloud hosting and communication charges)
Non Competitive Components
Provisional Sums (for Time-based contract only)
Equipment: Laptop for PMU, other equipment, furniture, etc.
Seminars, Workshops, Training (including Survey and Studies)
Contingency (for Time-based contract only)
Contigency
Description of Work / Item(s)
Amount
Competitive Components
Remuneration, Key Experts
Remuneration, Non-Key Experts
Reimbursable Expenses
Sub-Total
Non-Competitive Components
Provisional Sums
Contingency
Sub-Total
Total Cost of Financial Proposal in USD
Competitive Components
Remuneration, Key Experts
Remuneration, Non-Key Experts
Reimbursable Expenses
Sub-Total
Non-Competitive Components
Provisional Sums
Contingency
Sub-Total
Total Cost of Financial Proposal in USD
N Arc Consulting Enggpluss Private Limited (BID ID -338488)
Tractebel Engineering Private Limited (BID ID -339754)
SMEC International Pty. Ltd. (BID ID -339756)
Tractebel Engineering Private Limited (BID ID -339754)
Medhaj Techno Concept Pvt. Ltd. (BID ID -339627)
N Arc Consulting Enggpluss Private Limited (BID ID -338488)
Medhaj Techno Concept Pvt. Ltd. (BID ID -339627)
N Arc Consulting Enggpluss Private Limited (BID ID -338488)
SMEC International Pty. Ltd. (BID ID -339756)
US Dollar
European Euro
Japanese Yen
US Dollar
US Dollar
US Dollar
US Dollar
European Euro
Japanese Yen
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
European Euro
Japanese Yen
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid