Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64.4 LAccepted-AOC 04 SUDARSHNA COOLING CENTRE ADP ROAD CHRISTIANPATTY NAGAON ASSAM 782001 | NAGAON | ASSAM | 782001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹65.0 L+₹64,602 (1.00%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹65.4 L+₹95,625 (1.48%)Rejected-Finance 1ST FLOOR KRISHNA TOWERS OPP TO THRIKKAKARA TEMPLE THRIKKAKARA P O COCHIN 682 021 | ERNAKULAM | KERALA | 682021 | L3 | Rejected-Finance L3 | |
| 4 | L4₹71.7 L+₹7.3 L (11.4%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹82.8 L+₹18.4 L (28.6%)Rejected-Finance 6 NEW SADGURU NANIK INDUSTRIAL ESTATE OFF WESTERN EXPRESS HIGHWAY GOREGAON E MUMBAI 400063 INDIA | MUMBAI SUBURBAN | MAHARASHTRA | 400063 | L5 | Rejected-Finance L5 |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
1 Jul 2020, 6:00 pmClosed
AGM (Engg-E), AAI, Silchar Airport
AGM (Engg-E), AAI, Silchar Airport
Repair and maintenance of E and M Installations at Silchar Airport. SH-Job contract for E and M Installations at 11 KV Substation and Kumbha pump house and allied works for the year 2020-22
2020_AAI_51163_1
AAI/SIL/ENGG-E/E-M SS-KPH/2020-21
Open Tender
AMC/ Maintenance Contracts
Works
730 days
Silchar Airport
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
AAI
₹1.5 L
31 Jul 2020
22 Jun 2020
7 Jul 2020
22 Jun 2020
1 Jul 2020
22 Jun 2020
22 Jun 2020 - 24 Jun 2020
Amount
Providing Maintenance Services of Electrical & Mechanical Installations viz power supply system of 11 KV Substation/power house, CTs, transformers, AVRs & HT & LT panels covering the scope of operation, repairs & maintenance, attending faults / breakdowns rectifications, ensuring serviceability / satifactory working condition of the systems, preventive maintenance on daily/ weekly/ monthly/ quarterly/ half yearly/yearly basis, maintenance of records/documentation etc. as per scope of work given in special conditions of contract shall be ensured round the clock by the aduquate manpower (ie. in three shifts basis basis , each shift of 8 hours) on all days including Sundays & National Holidays as per direction of EIC. For 1st Year
Providing Maintenance Services of Electrical & Mechanical Installations viz power supply system of 11 KV Substation/power house, CTs, transformers, AVRs & HT & LT panels covering the scope of operation, repairs & maintenance, attending faults / breakdowns rectifications, ensuring serviceability / satifactory working condition of the systems, preventive maintenance on daily/ weekly/ monthly/ quarterly/ half yearly/yearly basis, maintenance of records/documentation etc. as per scope of work given in special conditions of contract shall be ensured round the clock by the aduquate manpower (ie. in three shifts basis basis , each shift of 8 hours) on all days including Sundays & National Holidays as per direction of EIC. For 2nd Year
Day to day operation of kumbha pump house of 40HP/20HP water pump sets, i/c lighting & power supply system attending faults / breakdowns rectifications, ensuring serviceability / satifactory working condition of the systems, preventive maintenance on daily/ weekly/ monthly/ quarterly/ half yearly/yearly basis, maintenance of records/documentation etc. as per scope of work given in special conditions of contract shall be ensured round the clock by the aduquate manpower (ie. in three shifts basis , each shift of 8 hours) on all days including Sundays & National Holidays & as per direction of EIC. For 1st Year
Day to day operation of kumbha pump house of 40HP/20HP water pump sets, i/c lighting & power supply system attending faults / breakdowns rectifications, ensuring serviceability / satifactory working condition of the systems, preventive maintenance on daily/ weekly/ monthly/ quarterly/ half yearly/yearly basis, maintenance of records/documentation etc. as per scope of work given in special conditions of contract shall be ensured round the clock by the aduquate manpower (ie. in three shifts basis , each shift of 8 hours) on all days including Sundays & National Holidays & as per direction of EIC. For 2nd Year
Extra hours running & operation of Electrical installations of Airport due to exigencies/early or over watch hour extension beyond normal shift hours or as per specification. a) Services of High Skilled Person For 1st Year
Extra hours running & operation of Electrical installations of Airport due to exigencies/early or over watch hour extension beyond normal shift hours or as per specification. a) Services of High Skilled Person For 2nd Year
Extra hours running & operation of Electrical installations of Airport due to exigencies/early or over watch hour extension beyond normal shift hours or as per specification. a) Services of Skilled Person For 1st Year
Extra hours running & operation of Electrical installations of Airport due to exigencies/early or over watch hour extension beyond normal shift hours or as per specification. a) Services of Skilled Person For 2nd Year
Filtration & dehydration of insulation oil of existing HT installations (like- HT AVR'S & 11 KV indoor transformer) in substation using on line oil filtration equipment with initial heating arrangement to attain standard breakdown voltage including testing of breaking strength prior and past purification with certificate and replacement of silica gel of breather of the same etc as required and as per direction of Engg-in-charge. Location: Sub Station For 1st Year
Filtration & dehydration of insulation oil of existing HT installations (like- HT AVR'S & 11 KV indoor transformer) in substation using on line oil filtration equipment with initial heating arrangement to attain standard breakdown voltage including testing of breaking strength prior and past purification with certificate and replacement of silica gel of breather of the same etc as required and as per direction of Engg-in-charge. Location: Sub Station For 2nd Year
Servicing , testing , checking and calibration of relay (over current 2 Nos + 1 No earth fault relay) installed in 11 KV HT panel including calibration and testing of 03 nos VCB (400 Amp) 11 kV HT - CG make with suitable secondary injection kit and submission of test certificate completed as required, checking the function of auxilary relay ( confirming the tripping) mechanism of the breaker due to high winding temperature, high oil temperature and due to bucholz relay , activation of the connection transformer, testing the of tripping system by secondery injection kit, tighning the terminals and termination, changing of all nuts and bolts i/c washers (if required), replacement of all insulator/bushing of 11 KV panel (01 incommer and 02 no out going+ insulators of PT section) (if required), replacement of the cork sheet and replacement of 3 sets of indoor type resin cast CTs (if required) i/c pressure test at site and calibrating the same complete as required and as per direction of Engg-in-charge. Location: Sub Station For 1st Year
Servicing , testing , checking and calibration of relay (over current 2 Nos + 1 No earth fault relay) installed in 11 KV HT panel including calibration and testing of 03 nos VCB (400 Amp) 11 kV HT - CG make with suitable secondary injection kit and submission of test certificate completed as required, checking the function of auxilary relay ( confirming the tripping) mechanism of the breaker due to high winding temperature, high oil temperature and due to bucholz relay , activation of the connection transformer, testing the of tripping system by secondery injection kit, tighning the terminals and termination, changing of all nuts and bolts i/c washers (if required), replacement of all insulator/bushing of 11 KV panel (01 incommer and 02 no out going+ insulators of PT section) (if required), replacement of the cork sheet and replacement of 3 sets of indoor type resin cast CTs (if required) i/c pressure test at site and calibrating the same complete as required and as per direction of Engg-in-charge.. Location: Sub Station For 2nd Year
Calibration and testing of Air Circuit Breaker (Make: GE) of capacity (Range: 800 Amp to 1250 Amp) using suitable secondary injection kit and submission of test certificate completed as required. Location: Sub Station For 1st Year
Calibration and testing of Air Circuit Breaker (Make: GE) of capacity (Range: 800 Amp to 1250 Amp) using suitable secondary injection kit and submission of test certificate completed as required. Location: Sub Station For 2nd Year
Complete cleaning of jack well (Size: L= 4.5 mtr X B= 3.5 mtr X D= 0.50 mtr) at Kumbha Pump House along with cleaning and removal of mud/slugg in the jack well engaging sufficient no. of suitable workers provided with suitable tools and protective gadgets with adequate safety measures and disposal of the remove mud/slugg when it is required & as per direction of EIC. Location: Kumbha Pump House For 1st Year
Complete cleaning of jack well (Size: L= 4.5 mtr X B= 3.5 mtr X D= 0.50 mtr) at Kumbha Pump House along with cleaning and removal of mud/slugg in the jack well engaging sufficient no. of suitable workers provided with suitable tools and protective gadgets with adequate safety measures and disposal of the remove mud/slugg when it is required & as per direction of EIC. Location: Kumbha Pump House For 2nd Year
Complete Overhuling & repairing of 20 HP capacity water pump i/c replacement of defective keys, bush, necessary lathe work, replacement of ball bearing & gland packing, painting and replacement of worn out minor hardware items etc. after dismantling from the existing location, transporation upto the workshop if necessary & reinstallation of the same, testing etc complete as required as per site condition. Location: Kumbha Pump House
Complete Overhuling & repairing of 40 HP capacity water pump i/c replacement of defective keys, bush, necessary lathe work, replacement of ball bearing & gland packing, painting and replacement of worn out minor hardware items etc. after dismantling from the existing location, transporation upto the workshop if necessary & reinstallation of the same, testing etc complete as required as per site condition. Location: Kumbha Pump House
Complete Re-winding of burnt out cooper coils of stator of 20 HP capacity 3 Ph. induction motor, dismantling from the existing location, transporting upto the workshop and reinstallation of the motor after repair with new super anamel coated copper, heat brunishing alongwith all other necessary spare parts as required including giving less credit for the burntout copper coil complete as required. Location: Kumbha Pump House
Complete Re-winding of burnt out cooper coils of stator of 40 HP capacity 3 Ph. induction motor, dismantling from the existing location, transporting upto the workshop and reinstallation of the motor after repair with new super anamel coated copper, heat brunishing alongwith all other necessary spare parts as required including giving less credit for the burntout copper coil complete as required. Location: Kumbha Pump House
Replacement of Old damage Gate Valve of size 80mm made of CI material from the pipe line when it is required & as per direction of EIC.
Replacement of Old damage Gate Valve of size 100mm made of CI material from the pipe line when it is required & as per direction of EIC.
Replacement of Old damage foot Valve of size 80mm made of CI material from the pipe line when it is required & as per direction of EIC.
Replacement of Old damage foot Valve of size 100mm made of CI material from the pipe line when it is required & as per direction of EIC.
Replacement of Old damage Non return Valve of size 80mm made of CI material from the pipe line when it is required & as per direction of EIC.
Replacement of Old damage Non return Valve of size 100mm made of CI material from the pipe line when it is required & as per direction of EIC.
ABHISHEK ASSOCIATES
Sterling And Wilson Pvt. Ltd
PAN POLAR ENGINEERS PVT. LTD.
PREMIER ENGINEERING TECHNICS PVT. LTD.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .